solar grants

Texas House Democrats urge Trump administration to restore $250M solar grant

Houston U.S. representatives and others from Texas are pushing the Trump administration to reinstate a portion of the $7 billion Biden-era Solar for All program, which aimed to help low-income families reduce their energy costs.. Photo via Pixabay

Eight Democratic members of the U.S. House from Texas, including two from Houston, are calling on the Trump administration to restore a nearly $250 million solar energy grant for Texas that’s being slashed by the U.S. Environmental Protection Agency (EPA).

In a letter to Lee Zeldin, head of the EPA, and Russell Vought, director of the federal Office of Management and Budget (OMB), the House members urged the two officials to reinstate the nearly $250 million grant, which was awarded to Texas under the $7 billion Biden-era Solar for All program. The Texas grant was designed to assist 28,000 low-income households in installing solar panels, aiming to reduce their energy bills.

“This administration has improperly withheld billions in congressionally appropriated funding that was intended to benefit everyday Americans,” the letter stated.

The letter claimed that numerous court rulings have determined the EPA cannot repeal already allocated funding.

“Congress made a commitment to families, small businesses, and communities across this country to lower their utility bills and reduce harmful pollution through investments in clean energy. The Solar for All program was part of that commitment, and the EPA’s actions to rescind this funding effectively undermine that congressional intent,” the House members wrote.

The six House members who signed the letter are:

  • U.S. Rep. Sylvia Garcia of Houston
  • U.S. Rep. Al Green of Houston
  • U.S. Rep. Greg Casar of Austin
  • U.S. Rep. Jasmine Crockett of Dallas
  • U.S. Rep. Lloyd Doggett of Austin
  • U.S. Rep. Julie Johnson of Dallas
  • U.S. Rep. Marc Veasey of Fort Worth

The nearly $250 million grant was awarded last year to the Harris County-led Texas Solar for All Coalition.

In a post on the X social media platform, Zeldin said the recently passed “One Big Beautiful Bill” killed the Greenhouse Gas Reduction Fund, which would have financed the $7 billion Solar for All program.

“The bottom line is this: EPA no longer has the statutory authority to administer the program or the appropriated funds to keep this boondoggle alive,” Zeldin said.

Trending News

A View From HETI

A rendering of the Stardust Power's planned lithium refinery in Muskogee, Oklahoma. Image via stardust-power.com

Battery-grade lithium carbonate manufacturer Stardust Power has expanded into Houston’s Energy Corridor, the company tells Energy Capital.

The company’s new office will serve as a project execution hub to support operations and planning for the company’s forthcoming lithium refinery in Muskogee, Oklahoma, according to a news release. The Greenwich, Connecticut-based, publicly traded company says the facility will be one of the largest lithium refining operations in the United States. The refinery is expected to have production capacity of up to 50,000 metric tons per year and seeks to address the critical shortage of U.S. lithium refining capacity.

Battery-grade lithium carbonate is commonly used in electric vehicle batteries and energy storage systems.

The company says it chose Houston as the location for its new execution hub for its rich history of expertise in engineering, a robust energy infrastructure ecosystem, and access to a leading talent pool for engineering, procurement and construction professionals. The Houston project hub will work closely with the company’s existing office in Oklahoma City.

“The Houston office strengthens our operational footprint at a critical phase of development,” Chris Celano, COO of Stardust Power, said in the release. “By building out a dedicated project management hub in one of the most experienced energy markets in the world, we are positioning the Company for execution as we advance the Muskogee refinery.”

Currently, the Houston office plans to accommodate a workforce of about 20 people with the possibility to add staff upon reaching project milestones, according to a representative from the company.

“This expansion reflects our commitment to deliver domestic, battery-grade lithium that supports U.S. energy security and industrial growth,” Celano added in the release.

In August, Stardust Power secured an offtake agreement to supply up to 20,000 metric tons of battery-grade lithium carbonate by 2030 from the Muskogee, Oklahoma, refinery to New York-based battery technology company Charge CCCV. Stardust reports that the deal adds to a separate non-binding agreement for up to 25,000 metric tons annually for 10 years with an undisclosed global trading company.

Trending News