oxy updates

Houston energy giant makes moves on emissions with Astros deal, new tech in the Permian Basin

Oxy's Permian Basin carbon capture project has a news partner and the Astros are thinking about their climate goals. Rendering via 1pointfive.com

Houston-based energy company Occidental is capturing a ton of attention with its carbon capture initiative.

Occidental’s carbon capture subsidiary, 1PointFive, recently said it’s developing a carbon capture and sequestration hub on a 55,000-acre site along the Gulf Coast in Southeast Texas. The hub will be able to hold about 1.2 billion metric tons of carbon dioxide.

The Bluebonnet Hub, expected to be operating in 2026, will be located in Chambers, Liberty, and Jefferson counties near coastal refineries, chemical plants, and manufacturing facilities. Chambers County is the Houston metro area.

“This hub is located between two of the largest industrial corridors in Texas so captured CO2 can be efficiently transported and safely sequestered,” says Jeff Alvarez, president of sequestration at 1PointFive. “Rather than starting from scratch with individual capture and sequestration projects, companies can plug into this hub for access to shared carbon infrastructure.”

Home run on emissions

Another development at 1PointFive involves the Houston Astros baseball team.

The Astros recently agreed to buy CO2 removal credits from 1PointFive’s carbon capture plant being built in Ector County, whose county seat is Odessa. Under this deal, CO2 captured by the company’s equipment will be sequestered in underground saline reservoirs that aren’t affiliated with oil and gas production.

Over the next three years, the Astros will use the removal credits to help the team achieve a carbon-neutral footprint at Minute Maid Park.

“We remain committed to continuous improvement of our stadium for our fans, and purchasing carbon removal credits is an important investment for us,” Marcel Braithwaite, senior vice president of business operations for the Astros, says in a news release.

Progress in the Permian Basin

Furthermore, 1PointFive is making progress on its carbon capture plant being developed in West Texas’ Permian Basin. The company recently tapped Orlando, Florida-based Siemens Energy to supply two compressors for the plant, which is set to capture more than 500,000 metric tons of CO2 per year.

Vicki Hollub, president and CEO of Occidental, says in a news release that the Permian Basin plant will help meet the Paris Agreement’s Paris climate change goals and reduce global emissions.

The Permian Basin facility, with an estimated price tag of $800 million to $1 billion, is on track to open by late 2024.

------

This article originally ran on InnovationMap.

Trending News

A View From HETI

UH's $44 million RAD Center is the first mass timber building on campus with a dramatically lower carbon footprint compared to other buildings of its kind. Photo via uh.edu.

The University of Houston recently completed assessments on year one of the first mass timber project on campus, and the results show it has had a major impact.

Known as the Retail, Auxiliary, and Dining Center, or RAD Center, the $44 million building showed an 84 percent reduction in predicted energy use intensity, a measure of how much energy a building uses relative to its size, compared to similar buildings. Its Global Warming Potential rating, a ratio determined by the Intergovernmental Panel on Climate Change, shows a 39 percent reduction compared to the benchmark for other buildings of its type.

In comparison to similar structures, the RAD Center saved the equivalent of taking 472 gasoline-powered cars driven for one year off the road, according to architecture firm Perkins & Will.

The RAD Center was created in alignment with the AIA 2030 Commitment to carbon-neutral buildings, designed by Perkins & Will and constructed by Houston-based general contractor Turner Construction.

Perkins & Will’s work reduced the building's carbon footprint by incorporating lighter mass timber structural systems, which allowed the RAD Center to reuse the foundation, columns and beams of the building it replaced. Reused elements account for 45 percent of the RAD Center’s total mass, according to Perkins & Will.

Mass timber is considered a sustainable alternative to steel and concrete construction. The RAD Center, a 41,000-square-foot development, replaced the once popular Satellite, which was a food, retail and hangout center for students on UH’s campus near the Science & Research Building 2 and the Jack J. Valenti School of Communication.

The RAD Center uses more than a million pounds of timber, which can store over 650 metric tons of CO2. Aesthetically, the building complements the surrounding campus woodlands and offers students a view both inside and out.

“Spaces are designed to create a sense of serenity and calm in an ecologically-minded environment,” Diego Rozo, a senior project manager and associate principal at Perkins & Will, said in a news release. “They were conceptually inspired by the notion of ‘unleashing the senses’ – the design celebrating different sights, sounds, smells and tastes alongside the tactile nature of the timber.”

In addition to its mass timber design, the building was also part of an Energy Use Intensity (EUI) reduction effort. It features high-performance insulation and barriers, natural light to illuminate a building's interior, efficient indoor lighting fixtures, and optimized equipment, including HVAC systems.

The RAD Center officially opened Phase I in Spring 2024. The third and final phase of construction is scheduled for this summer, with a planned opening set for the fall.

Trending News