green team

Houston energy hub announces first cohort for new accelerator

Energytech Nexus has named its first COPILOT accelerator cohort. Photo via Getty Images.

Energytech Nexus, a Houston-based hub for energy startups, has named its inaugural cohort of 14 companies for the new COPILOT accelerator.

COPILOT partners with Browning the Green Space, a nonprofit that promotes diversity, equity and inclusion (DEI) in the clean energy and climatech sectors. The Wells Fargo Innovation Incubator (IN²) at the National Renewable Energy Laboratory backs the COPILOT accelerator.

The eight-month COPILOT program offers mentorship, training and networking for startups. Program participants will be tasked with developing pilot projects for their innovations.

Two Houston startups are members of the first COPILOT class:

  • GeoFuels, housed at Houston’s Greentown Labs, has come up with a novel approach to hydrogen production that relies on geothermal power and methane decomposition.
  • PolyQor, which converts plastic waste into eco-friendly construction materials. Its flagship EcoGrete product is an additive for concrete that enhances its properties while reducing carbon emissions. PolyQor’s headquarters is at Houston’s Greentown Labs.

Other members of the COPILOT cohort are:

  • Birmingham, Alabama-based Accelerate Wind, developer of a wind turbine for commercial buildings.
  • Ann Arbor, Michigan-based Aquora Biosystems, which specializes in organic waste biorefineries.
  • Phoenix-based EarthEn Energy, a developer of technology for thermo-mechanical energy storage.
  • New York City-based Electromaim, which installs small hydro-generators in buildings’ water systems.
  • Chandler, Arizona-based EnKoat, an advanced materials company whose flagship product, the IntelliKoat System, is a patented two-layer thermal and weather barrier roof coating for flat and low-slope commercial buildings.
  • Calgary, Canada-based Harber Coatings, which manufactures electroless nickel coating and electroless nickel plating.
  • Dallas-based Janta Power, which designs and makes 3D solar towers.
  • Miami-based NanoSieve, a developer of gas remediation technology.
  • Palo Alto, California-based Popper Power, which has developed a platform that turns streetlight networks into resilient, maintenance-free distributed charging infrastructure.
  • Buffalo, New York-based Siva Powers America, developer of small wind turbines for farms, utility companies and others with annual energy needs of 300,000 to 2 million kilowatt-hours.
  • Los Angeles-based Thermoshade, which specializes in cooling panels for outdoor environments.
  • Waukesha, Wisconsin-based V-Glass, Inc., developer of a vacuum-insulated glass for affordable high-efficiency windows.

“These startups reflect the future of energy access and resilience innovation,” said Juliana Garaizar, founding partner of Energytech Nexus. “By connecting them directly with partners through

COPILOT, we’re helping them overcome the ‘pilot gap’ to build solutions that scale.”

The startups will run pilot projects along the Gulf Coast for their inventions.

Trending News

A View From HETI

ERock will provide equipment for 470 megawatts of capacity to Anthropic. Photo courtesy ERock

Two months after its $400 million IPO, Houston-based ERock (NYSE: EROC) has landed a power-generator deal with AI powerhouse Anthropic, owner of the Claude platform.

In its Q2 earnings report, ERock says it will provide equipment to Anthropic with a 470-megawatt capacity. ERock specializes in utility-grade, onsite microgrid power systems for data centers and other customers. The company previously did business as Enchanted Rock.

The Anthropic deal adds to ERock’s backlog of about $1.7 billion in orders—a figure representing a 1,000 percent year-over-year jump in backorders thanks in large part to the AI boom. ERock expects most of the backlog to convert to revenue by the end of 2027, said Ian Blakely, the company’s chief financial officer.

Bank of America analyst Ross Fowler says the Anthropic contract boosts confidence in ERock’s ability to secure other major deals, according to Traders Union. The Anthropic deal is ERock’s third major data center contract, with separate Anthropic deals for operations and maintenance services expected to follow, Fowler said.

CEO John Carrington says Anthropic’s order “reinforces the momentum” ERock is witnessing across its customer base.

“We are seeing a lot of interest in Texas. It seems to be the easiest place to get a site set up,” company President Corey Amthor said

In its Q2 earnings release—its first as a public company—ERock also reported:

  • Launching generator-assembly operations at its Hyperion equipment factory in Northwest Houston. The plant will expand ERock’s assembly capabilities to 1.2 gigawatts of capacity by the end of 2026.
  • Starting construction of a $473 million, 366-megawatt El Paso Electric natural-gas-powered plant to supply power for Meta Platforms’ $14 billion, 1,000-acre AI data center campus in El Paso. Meta is the parent company of the Facebook and Instagram social media companies.

“Meta gains access to an operational data center years earlier than may otherwise be possible, while El Paso Electric gains a flexible, low-cost, low-emissions grid asset that can support long-term system reliability,” Carrington said.

Trending News