what's trending

CenterPoint's resiliency plan, Chevron starts up new site, and more trending Houston energy transition news

Chevron's new deepwater project goes online — and more trending Houston energy transition news. Photo via Chevron

Editor's note: From Chevron's new deepwater project going online to two Texas companies collaborating on energy storage, these are the top headlines that resonated with EnergyCapital readers on social media and daily newsletter this week.

CenterPoint Energy releases details of resiliency plan

As part of the “Taking Action Now” section, more than 2,500 CenterPoint frontline workers and contractors will be taking a series of targeted actions to strengthen the grid and reduce the risk of outages. Photo via Getty Images

To improve resiliency and reduce the risk of outages from storms or hurricanes, CenterPoint Energy announced its Greater Houston Resiliency Initiative.

The initiative will include an “accelerated timeline to execute specific actions to strengthen electric infrastructure across Houston, and more than 40 critical actions in total to strengthen the electric grid, and improve the company's customer communications and emergency coordination before the next hurricane,” according to a news release.

As part of the “Taking Action Now” section, more than 2,500 CenterPoint frontline workers and contractors will be taking a series of targeted actions to strengthen the grid and reduce the risk of outages before the next major storm that includes installing stronger and more storm-resilient poles, trimming or removal of vegetation from lines, and installing 300 automated devices, which CenterPoint says can help reenergize certain lines and lead to less without power. Continue reading.

Chevron launches production at deepwater project that aims to lower carbon intensity off offshore activity

Chevron's newest deepwater oil and natural gas production project, called the Anchor, is an all-electric facility. Photo courtesy of Chevron

Chevron's new massive deepwater oil and natural gas project in the Gulf of Mexico is officially up and running.

Chevron Corp., which recently announced its relocating its global headquarters to Houston, has officially started oil and natural gas production from its Anchor project in the U.S. Gulf of Mexico.

The semi-submersible floating production unit features a high-pressure technology that operates at up to 20,000 psi with reservoir depths reaching 34,000 feet below sea level, Chevron reports, and has a capacity of 75,000 gross barrels of oil per day and 28 million gross cubic feet of natural gas per day. Continue reading.

Two Texas companies combine to enhance hydrogen fueling, storage infrastructure

Celly offers logistics, storage, and dispensing to innovative modular refueling station services. Photo via cellyh2.com

A provider of hydrogen infrastructure solutions Celly H2 has announced its acquisition of ChemTech Energy (CNE) to continue Celly's mission of leading hydrogen fueling and storage infrastructure.

The Willis, Texas-based company offers logistics, storage, and dispensing to innovative modular refueling station services. Montgomery’s Chemtec Energy has a 25-year legacy in the oil and gas market and specializes in modular hydrogen fueling and storage infrastructure solutions.

"This acquisition marks a significant milestone for Celly as we continue to expand our portfolio in the renewable energy market," Founder and CEO of Celly Austin Terry says in a news release. Continue reading.

Houston clean energy provider raises $10.8M series A

Branch Energy aims to provide customers with clean energy at a lower cost than competitors. Photo via Getty Images

A tech-driven retail energy provider based in Houston has secured an oversubscribed series A round of funding.

Branch Energy raised a $10.8 million round led by climate-focused venture capital firm Prelude Ventures with co-investor Zero Infinity Partners, an infrastructure tech-focused firm. The fresh funding will go toward accelerating the company's battery management tech and build out the infrastructure of its field services.

A vertically integrated power provider, Branch Energy aims to provide customers with demand management software and battery storage systems to ensure long-term, stable, and clean energy at a lower cost than competitors. Continue reading.

Woodside to acquire clean ammonia project outside of Houston in  $2.4B deal

OCI broke ground on the project in 2022. Photo via oci-global.com

Woodside Energy has announced its acquiring a Beaumont, Texas, clean ammonia project that's slated to deliver its first ammonia by 2025 and lower carbon ammonia by 2026.

The agreement is for Woodside to acquire 100 percent of OCI Clean Ammonia Holding and its lower carbon ammonia project in Beaumont in an all-cash deal of approximately $2.35 billion. According to Woodside CEO Meg O’Neill, the acquisition positions Woodside as an early mover in clean ammonia within the energy transition.

“This transaction positions Woodside in the growing lower carbon ammonia market," O’Neill says in a news release. "The potential applications for lower carbon ammonia are in power generation, marine fuels and as an industrial feedstock, as it displaces higher-emitting fuels. Continue reading.

Trending News

A View From HETI

Conversations rarely focus on what keeps electricity moving: transmission infrastructure. Photo by REVTLProjects on Unsplash

Texas takes pride in running one of the most dynamic and deregulated energy markets in the world, but conversations about electricity rarely focus on what keeps it moving: transmission infrastructure.

As ERCOT projects unprecedented electricity demand growth and grid operators update their forecasts for 2026, it’s becoming increasingly clear that generation, whether renewable or fossil, is only part of the solution. Transmission buildout and sound governing policy now stand as the linchpin for reliability, cost containment, and long-term resilience in a grid under unprecedented stress.

At the heart of this urgency is one simple thing: demand. Over 2024 and 2025, ERCOT has been breaking records at a pace we haven’t seen before. From January through September of 2025 alone, electricity use jumped more than 5% over the year before, the fastest growth of any major U.S. grid. And it’s not slowing down.

The Energy Information Administration expects demand to climb another 14% in 2026, pushing total consumption to roughly 425 terawatt-hours in just the first nine months. That surge isn’t just about more people moving to Texas or running their homes differently; it’s being driven by massive industrial and technology loads that simply weren’t part of the equation ten years ago.

The most dramatic contributor to that rising demand is large-scale infrastructure such as data centers, cloud computing campuses, crypto mining facilities, and electrified industrial sectors. In the latest ERCOT planning update, more than 233 gigawatts of total “large load” interconnection requests were being tracked, an almost 300% jump over just a year earlier, with more than 70% of those requests tied to data centers.

Imagine hundreds of new power plants requesting to connect to the grid, all demanding uninterrupted power 24/7. That’s the scale of the transition Texas is facing, and it’s one of the major reasons transmission planning is no longer back-of-house policy talk but a central grid imperative.

Yet transmission is complicated, costly, and inherently long-lead. It takes three to six years to build new transmission infrastructure, compared with six to twelve months to add a new load or generation project.

This is where Texas will feel the most tension. Current infrastructure can add customers and power plants quickly, but the lines to connect them reliably take time, money, permitting, and political will.

To address these impending needs, ERCOT wrapped up its 2024 Regional Transmission Plan (RTP) at the end of last year, and the message was pretty clear: we’ve got work to do. The plan calls for 274 transmission projects and about 6,000 miles of new, rebuilt, or upgraded lines just to handle the growth coming our way and keep the lights on.

The plan also suggests upgrading to 765-kilovolt transmission lines, a big step beyond the standard 345-kV system. When you start talking about 765-kilovolt transmission lines, that’s a big leap from what Texas normally uses. Those lines are built to move a massive amount of power over long distances, but they’re expensive and complicated, so they’re only considered when planners expect demand to grow far beyond normal levels. Recommending them is a clear signal that incremental upgrades won’t be enough to keep up with where electricity demand is headed.

There’s a reason transmission is suddenly getting so much attention. ERCOT and just about every industry analyst watching Texas are projecting that electricity demand could climb as high as 218 gigawatts by 2031 if even a portion of the massive queue of large-load projects actually comes online. When you focus only on what’s likely to get built, the takeaway is the same: demand is going to stay well above anything we’ve seen before, driven largely by the steady expansion of data centers, cloud computing, and digital infrastructure across the state.

Ultimately, the decisions Texas makes on transmission investment and the policies that determine how those costs are allocated will shape whether 2026 and the years ahead bring greater stability or continued volatility to the grid. Thoughtful planning can support growth while protecting reliability and affordability, but falling short risks making volatility a lasting feature of Texas’s energy landscape.

Transmission Policy: The Other Half of the Equation

Infrastructure investment delivers results only when paired with policies that allow it to operate efficiently and at scale. Recognizing that markets alone won’t solve these challenges, Texas lawmakers and regulators have started creating guardrails.

For example, Senate Bill 6, now part of state law, aims to improve how large energy consumers are managed on the grid, including new rules for data center operations during emergencies and requirements around interconnection. Data centers may even be required to disconnect under extreme conditions to protect overall system reliability, a novel and necessary rule given their scale.

Similarly, House Bill 5066 changed how load forecasting occurs by requiring ERCOT to include utility-reported projections in its planning processes, ensuring transmission planning incorporates real-world expectations. These policy updates matter because grid planning isn’t just a technical checklist. It’s about making sure investment incentives, permitting decisions, and cost-sharing rules are aligned so Texas can grow its economy without putting unnecessary pressure on consumers.

Without thoughtful policy, we risk repeating past grid management mistakes. For example, if transmission projects are delayed or underfunded while new high-demand loads come online, we could see congestion worsen. If that happens, affordable electricity would be located farther from where it’s needed, limiting access to low-cost power for consumers and slowing overall economic growth. That’s especially critical in regions like Houston, where energy costs are already a hot topic for households and businesses alike.

A 2026 View: Strategy Over Shortage

As we look toward 2026, here are the transmission and policy trends that matter most:

  • Pipeline of Projects Must Stay on Track: ERCOT’s RTP is ambitious, and keeping those 274 projects, thousands of circuit miles, and next-generation 765-kV lines moving is crucial for reliability and cost containment.
  • Large Load Forecasting Must Be Nuanced: The explosion in large-load interconnection requests, whether or not every project materializes, signals demand pressure that transmission planners cannot ignore. Building lines ahead of realized demand is not wasteful planning; it’s insurance against cost and reliability breakdowns.
  • Policy Frameworks Must Evolve: Laws like SB 6 and HB 5066 are just the beginning. Texas needs transparent rules for cost allocation, interconnection standards, and emergency protocols that keep consumers protected while supporting innovation and economic growth.
  • Coordination Among Stakeholders Is Critical: Transmission doesn’t stop at one utility’s borders. Regional cooperation among utilities, ERCOT, and local stakeholders is essential to manage congestion and develop systemwide reliability solutions.

Here’s the bottom line: Generation gets the headlines, but transmission makes the grid work. Without a robust transmission buildout and thoughtful governance, even the most advanced generation mix that includes wind, solar, gas, and storage will struggle to deliver the reliability Texans expect at a price they can afford.

In 2026, Texas is not merely testing its grid’s capacity to produce power; it’s testing its ability to move that power where it’s needed most. How we rise to meet that challenge will define the next decade of energy in the Lone Star State.

———

Sam Luna is director at BKV Energy, where he oversees brand and go-to-market strategy, customer experience, marketing execution, and more.

Trending News