Here's 1PoinFive's newest customer on its Texas CCUS project. Photo via 1pointfive.com

Oxy's carbon capture, utilization and sequestration company announced it's latest carbon dioxide removal credits purchasing agreement with a global commodities group.

Trafigura has agreed to purchase carbon dioxide removal credits to be produced from 1PointFive’s first industrial-scale Direct Air Capture facility, Stratos, that is being built in Texas.

Stratos, which is expected to be the largest facility of its kind in the world, will be configured to be able to capture up to 500,000 metric tons of CO2 annually when fully operational. The captured CO2 underlying Trafigura’s removal credits plan to be stored through durable subsurface saline sequestration.

The advance purchase of DAC credits from 1PointFive will support early-stage technologies to enable high-quality carbon removal credits. The deal can lead to broader adoption of 1PointFive’s CDR credits to help hard-to-abate industries address their emissions.

“We are delighted to collaborate with 1PointFive as we expand our global customer offering for hard-to-abate sectors,” Hannah Hauman, global head of Carbon Trading for Trafigura, says in a news release. “Supporting the development of large-scale removals projects demonstrates our commitment to advancing carbon sequestration technologies, underpinning demand today to enable the scaling of production for tomorrow.”

1PointFive is working to help curb global temperature rise to 1.5°C by 2050 through the deployment of decarbonization solutions, which includes Carbon Engineering's Direct Air Capture and AIR TO FUELS solutions alongside geologic sequestration hubs.

Last November, Canada’s TD Securities investment bank agreed to buy 27,500 metric tons of carbon removal credits from 1PointFive's Stratos, news that followed Amazon's commitment to purchase 250,000 metric tons of carbon removal credits. BlackRock has agreed to pump $550 million into the project, the company reported last fall.

Trafigura continues to invest in renewable energy projects and technologies to facilitate the transition to a low-carbon economy. The company works through joint ventures including H2Energy Europe and Nala Renewables. The deal is Trafigura’s first transaction towards meeting its 2023 goal, as is its commitment as a Founding Member of the First Movers Coalition to purchase at least 50,000 tons of durable and scalable net carbon dioxide removal credits generated through advanced CDR technologies.

Ad Placement 300x100
Ad Placement 300x600

CultureMap Emails are Awesome

Solar manufacturer expands Houston footprint with new 4 GW factory

coming soon

Houston-based SEG Solar plans to open a new 4-gigawatt solar module manufacturing facility in Cypress.

The facility represents more than a $200 million investment and will raise SEG's total annual U.S. module production capacity to approximately 6 gigawatts, according to a new release. The expansion is part of SEG’s long-term goal of becoming one of the largest 100 percent U.S.-owned module manufacturers.

The new 500,000-square-foot facility will be located on Telge Road and is expected to create 800 new jobs, according to reports.

“This new facility marks an important milestone for SEG,” Timothy Johnson, VP of operations, said in the release. “It will further strengthen our U.S. manufacturing capabilities while supporting ongoing technology innovation. The plant is designed with the flexibility to integrate next-generation technologies, including (heterojunction solar technology) as the industry evolves.”

Commercial operations at the new facility are expected to commence in Q3 2026.

SEG is also developing a 5-gigawatt ingot and wafer manufacturing facility in Indonesia. Construction on the facility is expected to begin in Q2 2026.

In 2024, SEG Solar opened a new $60 million, 250,000-square-foot facility in Houston to house its production workshops, raw material warehouses, administrative offices, finished goods warehouses and supporting infrastructure. Read more here.

Fervo Energy bumps up IPO target to $1.82B

IPO update

Houston-based geothermal power company Fervo Energy is now eyeing an IPO that would raise $1.75 billion to $1.82 billion, up from the previous target of $1.33 billion.

In paperwork filed Monday, May 11 with the U.S. Securities and Exchange Commission, Fervo says it plans to sell 70 million shares of Class A common stock at $25 to $26 per share.

In addition, Fervo expects to grant underwriters 30-day options to buy up to 8.33 million additional shares of Class A common stock. This could raise nearly $200 million.

When it announced the IPO on May 4, Fervo aimed to sell 55.56 million shares at $21 to $24 per share, which would have raised $1.17 billion to $1.33 billion. The initial valuation target was $6.5 billion.

A date for the IPO hasn’t been scheduled. Fervo’s stock will be listed on Nasdaq under the ticker symbol FRVO.

Fervo, founded in 2017, has attracted about $1.5 billion in funding from investors such as Bill Gates-founded Breakthrough Energy Ventures, Google, Mitsubishi Heavy Industries, Devon Energy (which is moving its headquarters to Houston), Tesla co-founder JB Straubel, CalSTRS, Liberty Mutual Investments, AllianceBernstein, JPMorgan, Bank of America and Sumitomo Mitsui Trust Bank.

Fervo’s marquee project is Cape Station in Beaver County, Utah, the world’s largest EGS (enhanced geothermal system) project. The first phase will deliver 100 megawatts of baseload clean power, with the second phase adding another 400 megawatts. The site can accommodate 2 gigawatts of geothermal energy. Fervo holds more than 595,000 leased acres for potential expansion.

Cape Station has secured power purchase agreements for the entire 500-megawatt capacity. Customers include Houston-based Shell Energy North America and Southern California Edison.

Modular nuclear reactor company opens office in Houston

new to hou

The nuclear energy renaissance continues in Texas with an announcement by NuScale Power. The Oregon-based provider of proprietary and innovative advanced small modular reactor (SMR) nuclear technology announced in April it would be opening office space in Houston’s CityCentre.

“Opening this space in Houston underscores our commitment to meeting rising energy demand with safe, scalable nuclear technology,” John Hopkins, NuScale president and CEO, said in a news release. “This move expands our presence in a key market for partners, prospective customers, and stakeholders in addition to positioning us for the future as we focus on the near-term deployment of our industry-leading technology. Texas is leading the way in embracing advanced nuclear for grid resilience and industrial decarbonization, and we’re proud to expand our footprint and capabilities in this important region.”

Interest in nuclear power has been growing in recent years thanks to tensions with oil-rich nations, concerns about man-made climate change from fossil fuels, and the rapidly increasing power needs of data centers. Both Dow and Texas A&M University have announced expanded nuclear power projects in the last year, with an eye of changing the face of Texas’s energy industry through smaller, safer fission reactors.

Enter NuScale, founded in 2007 from technology developed at the University of Oregon. Their modular SMR technology generates 77 megawatts and is one of the only small modular reactors (SMR) to receive design approval from the U.S. Nuclear Regulatory Commission (NRC). These advances have led to runaway success for NuScale, whose stock has risen by more than 1,670 percent since the start of 2024.

The new operations campus in CityCentre is expected to facilitate the movement, installation and coordination of NuScale technology into the various energy systems. Typically, SMRs are used for off-grid installations, desalination operations, mining facilities and similar areas that lack infrastructure. However, the modularity means that they can be easily deployed to a variety of areas.

It comes none too soon. ERCOT projects that Texas data centers alone will require 77,965 megawatts by 2030.