power move

Austin energy startup expands to Houston, offering electricity with backup batteries

Justin Lopas and Zach Dell founded Base Power in 2023 and are now expanding the company's electricity and backup battery offerings to Houston. Photo courtesy Base Power.

An Austin startup that sells electricity and couples it with backup power has entered the Houston market.

Base Power, which claims to be the first and only electricity provider to offer a backup battery, now serves the Houston-area territory served by Houston-based CenterPoint Energy. No solar equipment is required for Base Power’s backup batteries.

The company is initially serving customers in the Cy-Fair, Spring, Cinco Ranch and Mission Bend communities, and will expand to other Houston-area places in the future.

Base Power already serves customers in the Austin and Dallas-Fort Worth markets.

The company says it provides “a cost-effective alternative to generators and solar-battery systems in an increasingly unreliable power grid.”

“Houston represents one of the largest home backup markets in the world, largely due to dramatic weather events that strain the power grid,” says Base Power co-founder and CEO Zach Dell, son of Austin tech billionaire Michael Dell. “We’re eager to provide an accessible energy service that delivers affordable, reliable power to Houston homeowners.”

After paying a $495 or $995 fee that covers installation and permitting, and a $16- or $29-per-month membership fee, Base Power customers gain access to a backup battery and competitive energy rates, the company says. The startup is waiving the $495 setup fee for the first 500 Houston-area homeowners who sign up and make a refundable deposit.

With the Base Power backup package, electricity costs 14.3 cents per kilowatt-hour, which includes Base Power’s 8.5 cents per kilowatt-hour charge and rates charged by CenterPoint. The average electric customer in Houston pays 13 cents per kilowatt-hour, according to EnergySage.

“Base Power is built to solve a problem that so many Texans face: consistent power,” says Justin Lopas, co-founder and chief operating officer of Base Power and a former SpaceX engineer. “Houstonians can now redefine how they power their homes, while also improving the existing power grid.”

Founded in 2023, Base Power has attracted funding from investors such as Thrive Capital, Valor Equity Partners, Altimeter Capital, Trust Ventures, and Terrain. Zach Dell was previously an associate on the investment team at Thrive Capital.

Trending News

A View From HETI

A new Houston battery storage facility has come online in just six weeks. Photo courtesy FlexGen

Colorado-based energy storage company SMT Energy and North Carolina-based software company FlexGen have begun operations of Houston IV, a 160-megawatt utility-scale battery storage facility that aims to support the ERCOT grid.

The companies delivered the project in just six weeks, according to a news release. Mississippi-based Irby Construction Company served as the engineering, procurement, and construction (EPC) partner, and CenterPoint Energy will serve as the interconnecting utility.

“FlexGen’s distinctive combination of software automation, our remote operations center, and on-the-ground field expertise all work together to accelerate battery deployment,” Jason Rislov, SVP of operations at FlexGen, said in the release. “What used to take 25-plus weeks took us six. That time saved translates directly into giving the grid and consumers what they need most right now: a more reliable, resilient energy system.”

Houston IV is one of more than 12 projects that SMT and FlexGen have built to connect to ERCOT, according to Energy Storage News.

“Bringing a 160-MW battery storage facility online in just six weeks required disciplined planning, seamless coordination, and an unwavering focus on safety and quality,” Shaun Coleman, project manager at Irby Construction, said in a news release. “The SMT Energy, FlexGen, and Irby Construction teams coordinated engineering, procurement, and construction to keep every workstream aligned, identify challenges early, and maintain safety and quality at an accelerated pace. That integration is critical, not only to delivering projects quickly, but also to ensuring battery storage facilities perform reliably over the long term.”

Houston IV is expected to store and provide enough electricity to power 8,800 homes in Texas annually. In March, SMT Energy secured $135 million in funding for the project from Macquarie and KeyBanc Capital Markets as joint lead arrangers. SMT and FlexGen broke ground to signal the start of the process in May.

In 2023, SMT Energy and joint venture partner SUSI Partners also announced plans to add 10 battery storage projects to Texas, which would double capacity from 100 megawatts to 200 megawatts in the Houston and Dallas areas.

Trending News