Hydrogen Technology Expo North America, co-located with the Carbon Capture Technology Expo North America, returns to Houston next week. Photo courtesy Hydrogen Technology Expo.

The Hydrogen Technology Expo North America returns to NRG Center this month, June 25-26, and is slated to be the largest yet with an expected 10,000 attendees, 500 exhibitors, 200 speakers and more than 100 hours of content.

The 2025 event will feature cutting-edge technologies, interactive panel discussions and networking opportunities while targeting industries looking to adopt hydrogen and fuel cell technology to help decarbonize their sectors. The event will be co-located with the Carbon Capture Technology Expo North America.

The 2025 expo will introduce the new Ammonia Zone, a dedicated area fostering collaboration with industries leveraging ammonia as a key component in the hydrogen economy. It will also offer one- and two-day passes for the first time.

The expo is divided into five tracks:

  • Strategic forum
  • Hydrogen and alternative fuel production
  • Infrastructure and integration
  • Mobility and propulsion systems
  • Carbon capture, utilization and storage

Speakers include Martin Perez, former associate director for carbon capture at the office of clean energy demonstrations for the U.S. Department of Energy; Frank Wolak, president and CEO of Fuel Cell and Hydrogen Energy Association; Seema Santhakumar, hydrogen market development leader –Americas at Baker Hughes; Rich Byrnes, chief infrastructure officer for Port Houston; and many others. A full list of exhibitors can be found here.

Technologies on display will include storage systems, industrial plant technologies, liquefaction technologies, advanced materials and composites, gasification technology, simulation and evaluation, safety systems, hydrogen fuels, hydrogen injectors, line assemblies, fuel-cell control units and more.

“The Hydrogen Technology Expo offers industry leaders a valuable opportunity to network and stay informed about the latest developments in the rapidly evolving world of hydrogen,” Susan Shifflett, Executive Director at Texas Hydrogen Alliance, said. “We’re a proud partner of the show.”

Entry to the exhibition hall is free of charge. Passes start at $450. Find more information about how to register here.

The Texas projects are set to come online in 2024. Photo via Schneider Electric

Schneider Electric to invest in Texas clean energy projects with IRA tax credit transfer

shining on solar

Energy management and automation company Schneider Electric is investing in a Texas portfolio of solar and battery storage systems developed, built, and operated by Houston-based ENGIE North America.

The Texas projects are set to come online in 2024. France-based Schneider says the projects will put the company closer to reaching its goal of 100 percent renewable energy in the U.S. and Canada by 2030.

The Schneider investment comes in the form of tax credit transfers enabled by the federal Inflation Reduction Act. A Schneider news release didn’t put a price tag on the investment and didn’t name the Texas projects.

Schneider explains that the federal law enables the transfer of certain federal tax credits from renewable energy, clean energy manufacturing, battery storage and other clean energy projects. These transfers are an alternative to traditional tax equity deals.

“This collaboration with Schneider signals a real step forward in accelerating the net-zero transition,” Dave Carroll, chief renewables officer and senior vice president at ENGIE North America, says in the news release.

Carroll adds that the solar-and-storage portfolio and the tax credit transfers “support the continued growth of renewable energy and storage options in the U.S., which brings economic opportunities to an expanding set of communities alongside the transition to a lower-carbon grid.”

Last month, ENGIE said it had recently wrapped up more than $1 billion in tax equity financing from banking heavyweights BNP Paribas, Goldman Sachs, and J.P. Morgan Chase. The financing went toward 1.3 gigawatts’ worth of clean energy projects.

Ad Placement 300x100
Ad Placement 300x600

CultureMap Emails are Awesome

Regulators OK Dow’s Gulf Coast nuclear reactor project

going nuclear

The federal government has given preliminary approval for construction of four nuclear reactors at a Dow site on the Texas Gulf Coast.

The U.S. Nuclear Regulatory Commission (NRC) recently signed off on a permit for Dow and Maryland-based nuclear reactor developer X-energy to build Long Mott Generating Station at Dow’s Seadrift complex. The complex is near Port Lavaca and about 140 miles southwest of Houston.

The NRC issued the permit but hasn’t yet authorized construction to start. The commission said it’s the first construction permit issued for a high-temperature gas-cooled nuclear reactor in nearly 60 years.

Edward Stones, vice president of Dow’s energy and climate business, said the permit approval represents “another important milestone” for Long Mott. It’s expected to be the first-ever advanced nuclear project at a North American industrial site.

Construction at Long Mott could begin before 2030.

Dow’s Seadrift complex manufactures chemicals and plastics. The roughly 4,700-acre site employs more than 1,200 people. Union Carbide, a Dow subsidiary, operates the parent company’s second-largest facility in Texas.

Long Mott will supply zero-carbon electricity and high-temperature steam at Seadrift, replacing current energy- and steam-generating methods. Dow and X-energy are developing the project with support from the U.S. Department of Energy’s Advanced Reactor Demonstration Program.

Mike Goff, principal deputy assistant secretary for nuclear energy, said the NRC’s approval “demonstrates meaningful progress toward deploying advanced reactors that can deliver reliable power and industrial heat, strengthen American energy leadership and expand the role of nuclear energy in meeting our nation’s growing energy demands.”

Plans call for four small X-energy modular reactors to operate at Long Mott. Each reactor would be capable of producing 80 megawatts of electricity or 200 megawatts of thermal energy. Initial delivery of energy could happen as soon as the early 2030s.

“Advanced nuclear has attractive advantages over other sources of clean power, including a compact footprint, competitive cost, and enhanced power and steam reliability,” said Jim Fitterling, executive chair of Dow.

Woodlands startup Mavria raises $130M to mass-produce AI data centers

seed funding

The Woodlands-based Mavria, which mass-produces factory-built modular AI data centers, just emerged from stealth mode with $130 million in funding at a $1 billion valuation.

Mavria raised the money in pre-seed and seed rounds led by Paradigm, an investment firm that concentrates on early-stage startups developing “pioneer” technology. Participants in the funding rounds include AMP PBC, Critical Frontier, Dream Ventures and Liquid 2 Ventures, co-founded by former NFL quarterback Joe Montana.

The company’s inaugural product, Terrain, is a prefabricated data center designed for AI labs, cloud computing providers and data center developers. Mavria says its platform avoids ground-up construction, delivering infrastructure more quickly and at a lower cost.

Mavria tells the Wall Street Journal that the first Terrain unit is being built at a Houston-area factory. The 5-megawatt Terrain system features power distribution, direct liquid cooling, controls and server racks.

“America sets the pace at the intelligence frontier. But the race is moving from the lab into the physical world,” Adam Blake, co-founder and CEO of Mavria, wrote in a blog post.

“Intelligence needs data centers. Data centers need power. Power needs factories, equipment, supply chains, and skilled workers, but much of that infrastructure is still built one custom project at a time, on timelines measured in years.”

Blake and Mavria’s two other co-founders, Nick Poradek and Seth Cohen, most recently worked at the U.S. Department of Energy. There, they focused on reforming the nuclear power sector.

From start to finish, it can take roughly three to six years to build a data center at an estimated cost of $10 million to $37 million per megawatt. Based on those figures, a 100-megawatt data center might cost as much as $3.7 billion.

Here are brief bios of Blake, Poradek and Cohen, who co-founded Mavria in May.

Adam Blake

Blake most recently was a senior advisor to U.S. Energy Secretary Chris Wright. He is co-founder and former CEO of Zego, a provider of energy management technology for property managers. Zego spun out from Brightergy, a commercial solar company. Blake is founder and former CEO of Brightergy.

Nick Poradek

Poradek, chief operating officer at Mavria, was also an advisor to the U.S. energy secretary. He is founder and former CEO of Spring-based Edera Energy, co-founder of The Woodlands-based craft-ice brand Clarity Ice, and founder and former CEO of The Woodlands-based Edera Capital. Poradek sold Edera Energy, a manufacturer of oilfield equipment, to Liberty Energy, a fracking company. Wright is Liberty’s founder and former chairman and CEO.

Seth Cohen

Cohen, chief strategy officer and chief legal officer at Mavria, was head of nuclear law and policy at the Department of Energy. He is also a former NASA advisor and a former attorney at Kirkland & Ellis.

“We believe in rapidly deploying infrastructure as a product, rather than custom-building every project,” Blake said. “We’re bringing together engineering, manufacturing, supply chains and capital so that every project makes us better at delivering the next.”

---

This article originally appeared on our sister site, InnovationMap.

Houston geothermal company lands 50 MW power deal with Google

power purchase

Houston-based geothermal company Quaise Energy has secured a major power purchase agreement from Google.

The companies announced this week that the tech giant would purchase 50 megawatts of superhot geothermal power from Quaise's flagship Project Obsidian geothermal project in Central Oregon starting in 2030. The power will support Google's existing data center campuses in the Dalles region of Oregon, according to a news release.

“We started Quaise to make the Earth's most abundant energy source universally accessible — and this agreement marks a critical next step, not just for Quaise but for the entire clean energy sector," Carlos Araque, CEO and president of Quaise, said in the release. “Together with Google, we are building the commercial foundation for superhot geothermal and cementing the United States as the global leader in geothermal power.”

Google operates three data center campuses in Central Oregon, which have achieved 83 percent carbon-free energy, according to the company. Google says the new partnership with Quaise supports its clean energy efforts.

“Google data centers are long-term investments in the communities we call home,” Lucia Tian, head of advanced energy technologies at Google, added in the release. “This collaboration with Quaise on superhot geothermal will help fuel local economic growth while helping to build a more robust and affordable energy future for Oregon.”

Quaise's Project Obsidian is slated to come online in 2030. Phase I will generate 50 megawatts of geothermal power, with the total capacity planned to reach 1 gigawatt by Phase III. The company says Phase II of the project will be the first to use millimeter wave drilling, which can "plug into existing drilling rigs to economically reach superhot geothermal conditions."

Quaise closed its Series B fundraising round at $180 million in August after inking a $35 million investment from Houston-based Nabors Industries. It previously held a "first close" of the round at $134 million, led by San Francisco-based investment firm Prelude Ventures.

The company announced in March that it was aiming to raise $200 million for Project Obsidian through $100 million in Series B funding, plus an additional $100 million from grants, debt and project-level finance.

Meanwhile, Google struck a giant geothermal deal with Fervo Energy, another Houston-based geothermal leader, in September. Google agreed to purchase 396 megawatts of geothermal power from Fervo with an option for Google to expand capacity to 1 gigawatt by June 2030. The deal represents the largest purchase agreement in Fervo's history.

Financial terms were not disclosed for Google's deal with Quaise or Fervo.