new look

Houston energy transition ecosystem rebrands as 'Energytech Cypher'

Energytech Cypher co-founders Nada Ahmed and Jason Ethier. Photo via energytechcypher.com

Houston-based Energytech Nexus has rebranded.

The cleantech founders community will now be known as Energytech Cypher. Organizers say the new name was inspired by the Arabic roots of the word cypher, ṣifr, which is also the root of the word zero.

"A cypher is a key that unlocks what's hidden," Nada Ahmed, co-founder and chief revenue officer of Energytech Cypher, said in a news release. "And zero? Zero is where every transformation begins, the leap from 0 to 1, from idea to reality, from potential to power. We decode the energy transition by connecting the right founders, the right capital, and the right corporate partners at the right time, because the most important journey in energy is the one that takes you from nothing to something."

Energytech Nexus has rebranded to Energytech Cypher.

Co-founder and CEO Jason Ethier says that the name change better reflects the organization's mission.

"The energy transition doesn't have a technology problem. It has a connection problem," Ehtier added in the release. "The right founders exist. The right investors exist. The right partners exist. What's been missing is the infrastructure to bring them together—to decode the complexity, remove the friction, and make sure the best technologies find the markets that need them. That's what this community has always done. Energytech Cypher is the name that finally says it."

Energytech Cypher, previously known as Energytech Nexus, was first launched in 2023 and has grown from a podcast to a 130-member ecosystem. It has supported startups including Capwell Services, Resollant, Syzygy Plasmonics, Hertha Metals, Solidec and many others.

It is known for its flagship programs like the Pilotathon, which connects founders with industry partners for pilot opportunities. The event debuted in 2024.

Energytech Cypher also launched its COPILOT Accelerator last year. The accelerator partners with Browning the Green Space, a nonprofit that promotes diversity, equity and inclusion (DEI) in the clean energy and climatech sectors. The inaugural cohort included two Houston-based startups and 12 others from around the U.S.

It also hosts programs like Liftoff, Energy Tech Market, lunch and learns, CEO roundtables, investor workshops and international partnership initiatives.

Last year, Energytech Cypher also announced a new strategic ecosystem partnership with Greentown Labs, aimed at accelerating growth for clean energy startups. It also named its global founding partners, including Houston-based operations such as Chevron Technology Ventures, Collide, Oxy Technology Ventures, and others from around the world.

Trending News

A View From HETI

Corpus Christi, Texas is already facing prolonged drought and water concerns. Photo by Brandon Bell/Getty Images

A draft of Texas’ 2027 State Water Plan is drawing concerns from some water protection advocates who say it fails to account for one growing industry: data centers.

The plan, created by the Texas Water Development Board, will guide tens of billions of dollars in water development projects over the coming decades.

On Memorial Day, people packed Lake Travis to enjoy the water and sunshine while the lake remains near full capacity. But some advocates warn drought conditions could quickly return.

“Once we get into August, September, we'll be probably right back in the same drought situation,” said Mike Clifford with the Greater Edwards Aquifer Alliance.

The Texas Water Development Board released the draft plan in April. It recommends thousands of water projects carrying a projected cost of $174 billion over 50 years.

“We're not as shocked about the dollar amounts as some people are,” Clifford said. "To secure our water future, that's not an insane amount to ask for."

However, Clifford said his organization was surprised the draft does not specifically account for the growing impact of data centers, which can consume large amounts of water.

“If you leave the data centers out, it's not really a plan in our opinion. It's going to have to be changed and it's going to fall short,” Clifford said.

According to Data Center Map, Texas is currently home to 461 data centers.

Clifford argues the state should use projected future growth, not just historical data, when planning for long-term water needs.

“They're looking at the previous 10 years or 20 years or whatever, and we didn't have a lot of data centers in Texas,” he said.

Researchers at the the University of Texas at Austin estimate data centers could account for as much as 9 percent of Texas’ total water use by 2040, or potentially surpass the oil and gas industry that same year.

--

Read the full story from CultureMap news partner KVUE.com.

Trending News