LYB is building its first industrial-scale catalytic advanced recycling demonstration plant at its site in Germany. Photo via lyondellbasell.com

This month, LyondellBasell has announced it has officially pulled the trigger on a new recycling plant in Germany.

Dutch chemicals leader LYB, as the company has rebranded recently, has made its final investment decision to build its first industrial-scale catalytic advanced recycling demonstration plant at its site in Wesseling, Germany.

The project is reported to be the first "commercial scale, single-train advanced recycling plant to convert post-consumer plastic waste into feedstock for production of new plastic materials that can be ran at net zero GHG emissions," per LYB's news release.

The plant will utilize LYB's MoReTec technology, which targets difficult to recycle plastics like mixed or flexible materials, and have an annual capacity of 50,000 tonnes per year. The amount expected to be recycled annually will equal plastic packaging waste generated by over 1.2 million German citizens per year.

"We are committed to addressing the global challenge of plastic waste and advancing a circular economy, and today's announcement is another meaningful step in that direction," says Peter Vanacker, LYB CEO, in the release. "Scaling up our catalytic advanced recycling technology will allow us to return larger volumes of plastic waste back into the value chain. By doing this, we will have the ability to produce more materials for high-quality applications, retaining value of plastics for as long as possible."

The plant's construction is anticipated to be done by the end of 2025. The majority of the sorted processed feedstock will be supplied by Source One Plastics, a joint venture of LYB and 23 Oaks Investments that formed in October 2022.

A few weeks ago, LYB purchased a 25 percent stake in a joint venture that seeks to accelerate advancements in plastic recycling. The joint venture, Cyclyx International, was formed in 2020 by Spring-based energy giant ExxonMobil and Tigard, Oregon-based plastic recycling innovator Agilyx.

In 2022, Cyclyx announced it had inked a deal with ExxonMobil and LyondellBasell to develop a first-of-its-kind plastic waste sorting and processing plant in the Houston area. The estimated $100 million facility, set to open in 2024, is poised to annually produce 330 million pounds of plastic feedstock, which is made up of recycled materials that can be used to manufacture new plastics.

LyondellBasell has rebranded as LYB. Photo via lyondellbasell.com

Houston chemical corporation rebrands to reflect the future of sustainability

introducing LYB

A Houston-headquartered chemicals business has launched its new brand identity that's aligning its purpose of “creating solutions for everyday sustainable living.”

LyondellBasell's rebrand includes a new logo, tagline, and visual identity. The chemicals company, which is known as LYB with the rollout, announced the rebranding this week.

“With our new strategy firmly in place, our employees are adopting new ways of working to generate innovative, value-enhancing solutions to support our goals,” Peter Vanacker, LYB's CEO, says in the release. “I am especially proud of our teams’ recent accomplishments. This includes accelerating our value enhancement program targets and increasing our access to circular and renewable feedstocks through the development of integrated recycling hubs centered in Houston, Texas and Cologne, Germany.

"I believe our new brand identity will inspire employees by giving them a visual representation of our vision for the future and a sense of unity toward our purpose and values," he continues.

LYB's new tagline is “Solutions for a better tomorrow,” which is meant to convey the company's dedication to manufacturing products within circular and low carbon economies across food packaging, health care, and transportation, and technologies.

The new branding is visible now on the company's website and social media platforms.



LYB Logo

Ad Placement 300x100
Ad Placement 300x600

CultureMap Emails are Awesome

ERCOT to capture big share of U.S. solar power growth through 2027

solar growth

Much of the country’s growth in utility-scale solar power generation will happen in the grid operated by the Electric Reliability Council of Texas (ERCOT), according to a new forecast.

The U.S. Energy Information Administration (EIA) predicts that solar power supplied to the ERCOT grid will jump from 56 billion kilowatt-hours in 2025 to 106 billion kilowatt-hours by the end of 2027. That would be an increase of 89 percent.

In tandem with the rapid embrace of solar power, EIA anticipates battery storage capacity for ERCOT will expand from 15 gigawatts in 2025 to 37 gigawatts by the end of 2027, or 147 percent.

EIA expects utility-scale solar to be the country’s fastest-growing source of power generation from 2025 to 2027. It anticipates that this source will climb from 290 billion kilowatt-hours last year to 424 billion kilowatt-hours next year, or 46 percent.

Based on EIA’s projections, ERCOT’s territory would account for one-fourth of the country’s utility-scale solar power generation by the end of next year.

“Solar power and energy storage are the fastest-growing grid technologies in Texas, and can be deployed more quickly than any other generation resource,” according to the Texas Solar + Storage Association. “In the wholesale market, solar and storage are increasing grid reliability, delivering consumer affordability, and driving tax revenue and income streams into rural Texas.”

Expert: Why Texas must make energy transmission a top priority in 2026

guest column

Texas takes pride in running one of the most dynamic and deregulated energy markets in the world, but conversations about electricity rarely focus on what keeps it moving: transmission infrastructure.

As ERCOT projects unprecedented electricity demand growth and grid operators update their forecasts for 2026, it’s becoming increasingly clear that generation, whether renewable or fossil, is only part of the solution. Transmission buildout and sound governing policy now stand as the linchpin for reliability, cost containment, and long-term resilience in a grid under unprecedented stress.

At the heart of this urgency is one simple thing: demand. Over 2024 and 2025, ERCOT has been breaking records at a pace we haven’t seen before. From January through September of 2025 alone, electricity use jumped more than 5% over the year before, the fastest growth of any major U.S. grid. And it’s not slowing down.

The Energy Information Administration expects demand to climb another 14% in 2026, pushing total consumption to roughly 425 terawatt-hours in just the first nine months. That surge isn’t just about more people moving to Texas or running their homes differently; it’s being driven by massive industrial and technology loads that simply weren’t part of the equation ten years ago.

The most dramatic contributor to that rising demand is large-scale infrastructure such as data centers, cloud computing campuses, crypto mining facilities, and electrified industrial sectors. In the latest ERCOT planning update, more than 233 gigawatts of total “large load” interconnection requests were being tracked, an almost 300% jump over just a year earlier, with more than 70% of those requests tied to data centers.

Imagine hundreds of new power plants requesting to connect to the grid, all demanding uninterrupted power 24/7. That’s the scale of the transition Texas is facing, and it’s one of the major reasons transmission planning is no longer back-of-house policy talk but a central grid imperative.

Yet transmission is complicated, costly, and inherently long-lead. It takes three to six years to build new transmission infrastructure, compared with six to twelve months to add a new load or generation project.

This is where Texas will feel the most tension. Current infrastructure can add customers and power plants quickly, but the lines to connect them reliably take time, money, permitting, and political will.

To address these impending needs, ERCOT wrapped up its 2024 Regional Transmission Plan (RTP) at the end of last year, and the message was pretty clear: we’ve got work to do. The plan calls for 274 transmission projects and about 6,000 miles of new, rebuilt, or upgraded lines just to handle the growth coming our way and keep the lights on.

The plan also suggests upgrading to 765-kilovolt transmission lines, a big step beyond the standard 345-kV system. When you start talking about 765-kilovolt transmission lines, that’s a big leap from what Texas normally uses. Those lines are built to move a massive amount of power over long distances, but they’re expensive and complicated, so they’re only considered when planners expect demand to grow far beyond normal levels. Recommending them is a clear signal that incremental upgrades won’t be enough to keep up with where electricity demand is headed.

There’s a reason transmission is suddenly getting so much attention. ERCOT and just about every industry analyst watching Texas are projecting that electricity demand could climb as high as 218 gigawatts by 2031 if even a portion of the massive queue of large-load projects actually comes online. When you focus only on what’s likely to get built, the takeaway is the same: demand is going to stay well above anything we’ve seen before, driven largely by the steady expansion of data centers, cloud computing, and digital infrastructure across the state.

Ultimately, the decisions Texas makes on transmission investment and the policies that determine how those costs are allocated will shape whether 2026 and the years ahead bring greater stability or continued volatility to the grid. Thoughtful planning can support growth while protecting reliability and affordability, but falling short risks making volatility a lasting feature of Texas’s energy landscape.

Transmission Policy: The Other Half of the Equation

Infrastructure investment delivers results only when paired with policies that allow it to operate efficiently and at scale. Recognizing that markets alone won’t solve these challenges, Texas lawmakers and regulators have started creating guardrails.

For example, Senate Bill 6, now part of state law, aims to improve how large energy consumers are managed on the grid, including new rules for data center operations during emergencies and requirements around interconnection. Data centers may even be required to disconnect under extreme conditions to protect overall system reliability, a novel and necessary rule given their scale.

Similarly, House Bill 5066 changed how load forecasting occurs by requiring ERCOT to include utility-reported projections in its planning processes, ensuring transmission planning incorporates real-world expectations. These policy updates matter because grid planning isn’t just a technical checklist. It’s about making sure investment incentives, permitting decisions, and cost-sharing rules are aligned so Texas can grow its economy without putting unnecessary pressure on consumers.

Without thoughtful policy, we risk repeating past grid management mistakes. For example, if transmission projects are delayed or underfunded while new high-demand loads come online, we could see congestion worsen. If that happens, affordable electricity would be located farther from where it’s needed, limiting access to low-cost power for consumers and slowing overall economic growth. That’s especially critical in regions like Houston, where energy costs are already a hot topic for households and businesses alike.

A 2026 View: Strategy Over Shortage

As we look toward 2026, here are the transmission and policy trends that matter most:

  • Pipeline of Projects Must Stay on Track: ERCOT’s RTP is ambitious, and keeping those 274 projects, thousands of circuit miles, and next-generation 765-kV lines moving is crucial for reliability and cost containment.
  • Large Load Forecasting Must Be Nuanced: The explosion in large-load interconnection requests, whether or not every project materializes, signals demand pressure that transmission planners cannot ignore. Building lines ahead of realized demand is not wasteful planning; it’s insurance against cost and reliability breakdowns.
  • Policy Frameworks Must Evolve: Laws like SB 6 and HB 5066 are just the beginning. Texas needs transparent rules for cost allocation, interconnection standards, and emergency protocols that keep consumers protected while supporting innovation and economic growth.
  • Coordination Among Stakeholders Is Critical: Transmission doesn’t stop at one utility’s borders. Regional cooperation among utilities, ERCOT, and local stakeholders is essential to manage congestion and develop systemwide reliability solutions.

Here’s the bottom line: Generation gets the headlines, but transmission makes the grid work. Without a robust transmission buildout and thoughtful governance, even the most advanced generation mix that includes wind, solar, gas, and storage will struggle to deliver the reliability Texans expect at a price they can afford.

In 2026, Texas is not merely testing its grid’s capacity to produce power; it’s testing its ability to move that power where it’s needed most. How we rise to meet that challenge will define the next decade of energy in the Lone Star State.

———

Sam Luna is director at BKV Energy, where he oversees brand and go-to-market strategy, customer experience, marketing execution, and more.