A new EO could streamline regulatory burdens for the development of data centers supporting AI. Getty Images

In an effort to accelerate the development of artificial intelligence, President Trump signed an executive order (EO) aimed at expediting the federal permitting process for data centers, particularly those supporting AI inference, training, simulation, or synthetic data generation.

Following the White House’s issuance of a broader AI Action Plan, the EO seeks to streamline regulatory burdens and utilize federal resources to encourage the development of data centers supporting AI, as well as the physical components and energy infrastructure needed to construct and provide power to these data centers.

Qualifying Projects

The EO directs several federal agencies to take actions to incentivize the development of “Qualifying Projects,” which the EO defines as “Data Centers” and “Covered Component Projects.” The EO defines “Data Center Projects” as facilities that require over 100 megawatts (MW) of new load dedicated to AI inference, training, simulation, or synthetic data generation. The EO defines Covered Component Projects as materials, products, and infrastructure that are required to build Data Center Projects or upon which Data Center Projects depend, including energy infrastructure projects like transmission lines and substations, dispatchable base load energy sources like natural gas, geothermal, and nuclear used principally to power Data Center Projects, and semiconductors and related equipment. For eligibility as a Qualifying Project, the project sponsor must commit at least $500 million in capital expenditures. Data Center Projects and Covered Component Projects may also meet the definition of Qualifying Project if they protect national security or are otherwise designated as Qualifying Projects by the Secretary of Defense, Secretary of the Interior, Secretary of Commerce, or Secretary of Energy.

Streamlining Permitting of Qualifying Projects

The EO outlines the following strategies aimed at improving the efficiency of environmental reviews and permitting for Qualifying Projects:

  • NEPA Applicability: The Council on Environmental Quality (CEQ), in coordination with relevant agencies, is directed to utilize existing and new categorical exclusions under the National Environmental Policy Act (NEPA) to cover actions related to Qualifying Projects, which “normally do not have a significant effect on the human environment.” The EO states that where federal financial assistance represents less than 50 percent of total project costs of a Qualifying Project, the Project shall be presumed not to be a “major Federal action” requiring NEPA review.
  • FAST-41: The Executive Director of the Federal Permitting Improvement Steering Council (FPISC) is empowered to designate a Qualifying Project as a “transparency project” under the Fixing America’s Surface Transportation Act (FAST-41) and expedite its transition from a transparency project to a “covered project” under FAST-41. FPISC is directed to consider all available options to designate a Qualifying Project as a FAST-41 covered project, even where the Qualifying Project may not be eligible.
  • EPA Permitting: The US Environmental Protection Agency (EPA) is directed to modify applicable regulations under several environmental protection statutes impacting the development of Qualifying Projects on federal and non-federal lands. EPA is also directed to develop guidance to expedite environmental reviews for identification and reuse of Brownfield and Superfund Sites suitable for Qualifying Projects. Importantly, state environmental permitting agencies are not subject to the EO.
  • Corps Permitting: The US Army Corps of Engineers is directed to review the nationwide permits issued under Section 404 of the Clean Water Act and Section 10 of the Rivers and Harbors Act of 1899 to determine whether an activity-specific nationwide permit is needed to facilitate the efficient permitting of activities related to Qualifying Projects.
  • Interior Permitting: The US Department of the Interior is directed to consult with the US Department of Commerce regarding the streamlining of Endangered Species Act consultations for Qualifying Projects, and to work with the US Department of Energy to identify federal lands that may be available for use by Qualifying Projects and offer appropriate authorizations to project sponsors.

Federal Incentives for Qualifying Projects

The EO also directs the US Secretary of Commerce to “launch an initiative to provide financial support for Qualifying Projects,” which may include loans, grants, tax incentives, and offtake agreements. The EO further directs all “relevant agencies” to identify and submit to the White House Office of Office of Science and Technology Policy any relevant existing financial support that can be used to assist Qualifying Projects, consistent with the protection of national security.

The EO reinforces the Trump administration’s focus on AI and creates new opportunities for both AI data center developers and energy infrastructure companies providing power or project components to these data centers. Proactive engagement with relevant agencies will be crucial for capitalizing on the opportunities created by this EO and the broader AI Action Plan. By leveraging these financial and environmental incentives, project developers may be able to shorten permitting timelines, reduce costs, and take advantage of federal financial support.

---

Jason B. Hutt, Taylor M. Stuart and Anouk Nouet are lawyers at Bracewell. Hutt is chair of the firm’s environment, lands and resources department. Stuart counsels energy, infrastructure, and industrial clients on matters involving environmental and natural resources law and policy. Nouet advises clients on litigation, enforcement and project development matters with a focus on complex environmental and natural resources law and policy.

Ad Placement 300x100
Ad Placement 300x600

CultureMap Emails are Awesome

Energy expert reviews Texas' big strides in winter grid resilience

guest column

Many Houstonians were holding their breath during the hard freezes that occurred in late January. While Winter Storm Uri was five years ago, the massive blackouts remain a fresh memory.

During that storm, 4.5 million Texans lost power, the state suffered over $80 billion in economic losses, and more than 200 people lost their lives.

During the most recent freeze events, Texas did not experience large-scale blackouts across the state like those in 2021. Regional power outages occurred due to infrastructure issues, including ice on trees and power lines. Since Uri, we have not seen the same sustained weather conditions to test the grid, but there have been significant improvements.

What Has Changed Since Uri

The ERCOT grid has changed significantly since the storm in 2021:

  1. Senate Bill 3 required generators to winterize their equipment, treated the natural gas supply chain as critical infrastructure, and imposed fines of up to $1 million for falling short. More than 300 power units have already been weatherized, and regulators have issued clearer standards to help keep the grid running during extreme cold.
  2. There has been significant progress with monitoring the grid and preparing for emergencies. ERCOT has improved in spotting problems before they turn into outages. Operators now have stronger real-time visibility into generator performance and fuel supplies, improved coordination with natural gas providers, and more advanced forecasting tools that help predict energy availability.
  3. The Texas Energy Fund authorized more than $10 billion for reliability projects across the state. The funds support four programs that aim to increase energy generation and dispatch capacity during periods of grid strain.

Signs of Progress

The grid's performance from 2022 to 2026 shows measurable improvements in how the system handles extreme cold.

  • ERCOT has implemented conservation alerts to help reduce grid load and prevent major blackouts.
  • Operators monitor the reserve margin, essentially the buffer between supply and demand. When that cushion holds, the grid has more flexibility to keep power flowing.
  • Stronger coordination between generators, transmission operators and utilities is also improving overall system resilience.

Additionally, Texas has built one of the largest smart-meter networks in the country, enabling better predictive analysis of electricity demand and usage. These smart meters have been installed in 90% of Texas residential homes, providing a much more accurate picture of energy consumption.

Finally, energy companies are helping customers understand how small changes in usage can ease grid strain. Individually, those adjustments may seem minor, but across millions of homes, they can meaningfully lower demand and help reduce the risk of outages.

Remaining Vulnerabilities and Possible Risks

Despite the progress, Grid Strategies assigned the Texas power grid a D-minus rating this year. A major factor in the rating is Texas’s lack of connections to neighboring power grids. While the state earned a B for legislative engagement, delayed transmission projects contributed to a lower C-minus outcome score.

While the grid has become more reliable since 2021, several threats remain that could impede its continued progress.

  • Population growth remains one of the biggest tests for Texas grid reliability. The state is expected to add roughly 15 million residents over the next three decades.
  • Data centers, industrial expansion, and corporate relocations continue to drive electricity demand higher. Houston sits at the center of that growth, making it a key region to watch to see whether Texas can keep pace with rising energy needs.
  • Increased weather volatility in Texas will make demand predictions even more challenging. Currently, Texas supplies almost 45% of its energy needs with natural gas. Natural gas production and extraction are particularly susceptible to cold weather and freezing conditions.

What “No Blackouts” Really Means for Texans

A stronger grid comes with a price tag. Meeting Texas’s growing demand requires major investments in generation, transmission, and emergency preparedness, and those costs ultimately flow to consumers through higher electric bills.

At the same time, Texans are becoming more proactive about managing energy use and protecting against outages, with more homeowners investing in generators, battery storage, and solar as part of long-term energy planning.

Final Thoughts

As lawmakers continue to debate how to recover grid investments, consumers will ultimately bear part of the cost. The challenge moving forward is improving reliability while keeping electricity affordable for Texans.

Texas continues to expand renewable generation to diversify the power mix, and battery storage is quickly becoming a key reliability tool because it can respond almost instantly to demand spikes. At the same time, advanced forecasting technology is helping operators better anticipate grid stress.

The Texas energy market is evolving fast, driven by population growth and rising electricity demand. Lawmakers, regulators, and grid operators will need to stay aligned to keep reliability moving in the right direction, while consumers will play a bigger role in managing how and when they use electricity.

So, is Texas better prepared for winter today? In many ways, yes. But the grid is still vulnerable to extreme weather and rapid demand growth. Maintaining reliability will require continued investment, planning, and coordination to keep the lights on across the state.

———

Sam Luna is director at BKV Energy, where he oversees brand and go-to-market strategy, customer experience, marketing execution, and more.

Houston company raises $100M Series D to scale industrial decarbonization tech

fresh funding

Houston-based Utility Global has raised $100 million in an ongoing Series D round to globally deploy its decarbonization technology at an industrial scale.

The round was led by Ara Partners and APG Asset, according to a news release. Utility plans to use the funding to expand manufacturing, grow its teams and support its commercial developments and partnerships.

“This financing marks a critical step in Utility’s transition from a proven technology to full-scale global commercial execution,” Parker Meeks, CEO and president of Utility Global, said in the release. “Industrial customers are no longer looking for pilots or promises; they need deployable solutions that work within existing assets and deliver true economic industrial decarbonization today that is operationally reliable and highly scalable. Utility’s technology produces both economic clean hydrogen and capture-ready CO2 streams, and this capital enables us to scale and deploy that impact globally with speed, discipline, and rigor.”

Utility Global's H2Gen technology produces low-cost, clean hydrogen from water and industrial off-gases without requiring electricity. It's designed to integrate into existing industrial infrastructure in hard-to-abate assets in the steel, refining, petrochemical, chemical, low-carbon fuels, and upstream oil and gas sectors.

“Utility is tackling one of the most difficult challenges in the energy transition: decarbonizing hard‑to‑abate industrial sectors,” Cory Steffek, partner at Ara Partners and Utility Global board chair, said in the release. “What sets Utility apart is its ability to compete head‑to‑head with conventional fossil‑based solutions on cost and reliability, even as it materially reduces emissions. With this new funding, Utility is well-positioned for its next chapter of commercial growth while maintaining the technical excellence and capital discipline that have defined its development to date.”

Utility Global reached several major milestones in 2025. After closing a $53 million Series C, the company agreed to develop at least one decarbonization facility at an ArcelorMittal steel plant in Brazil. It also signed a strategic partnership with California-based Kyocera International Inc. to scale global manufacturing of its H2Gen electrochemical cells.

The company also partnered with Maas Energy Works, another California company, to develop a commercial project integrating Maas’ dairy biogas systems with H2Gen to produce economical, clean hydrogen.

"These projects were never intended to stand alone. They anchor a deep and growing pipeline of commercial projects now in development globally across steel, refining, chemicals, biogas and other hard-to-abate sectors worldwide, Meeks shared in a 2025 year-in-review note. He added that 2026 would be a year of "focused acceleration to scale."

Houston energy pioneer elected to National Academy of Sciences leadership

top honor

Naomi Halas, a Rice University professor and co-founder of Syzygy Plasmonics, was elected to the Council of the National Academy of Sciences this month.

The council sets priorities for the nonprofit organization, which advises the federal government on scientific and technical matters. Halas will serve a three-year term on the council, beginning July 1.

“The council’s work is focused on the academy’s national leadership and governance,” Halas said in a news release. “It plays an important role in helping set initiatives and priorities for the scientific community, and in supporting the conditions that allow science to move forward in meaningful ways.”

Halas is best known for her pioneering work in nanophotonics and plasmonics. She helped develop nanoshells, or metal-coated nanoparticles that capture light energy, which have led to innovations in renewable energy, cancer therapy and water purification.

Halas co-founded Syzygy Plasmonics with frequent collaborator and fellow Rice professor Peter Nordlander. The company is developing low-cost, light-driven, all-electric chemical reactors for the sustainable production of hydrogen fuel. It was named to Fast Company's energy innovation list last year.

Syzygy Plasmonics is developing its first commercial-scale biogas-to-sustainable aviation fuel project in Uruguay, known as NovaSAF-1. It secured a six-year offtake agreement for the entire production from the project with Singapore-based commodity company Trafigura this month.

Halas was first elected to become a member of the NAS in 2013, and was shortly after named to the National Academy of Engineering in 2014—making her one of the few scientists to hold both distinctions. She received the Benjamin Franklin Medal in Chemistry last year. Many scientists who have received the award have gone on to win Nobel prizes.

She is also the co-founder of Nanospectra Biosciences and a member of the National Academy of Inventors, the American Academy of Arts and Sciences, and the Royal Danish Academy of Science and Letters. She holds more than 25 patents, according to Rice.