Houston energy leader Katie Mehnert shared her key takeaways from Houston Energy and Climate Week 2026 with Energy Capital. Photo courtesy

While hundreds of thousands descend on New York for Climate Week, Houston offered a different proposition: come where the work is being built. And last week Houston proved that it’s solving for more energy and fewer emissions; reliability and affordability; speed and durability. We are solving for the “&.”

That equation sharpened last week. On Sept. 14, the Environmental Protection Agency announced it had repealed most 2024 federal carbon-pollution standards for power plants and proposed rescinding remaining greenhouse-gas requirements. Policy matters, but it can pivot. The need to build does not.

HECW is a proving ground, not another conference stop. As I wrote in the Houston Chronicle, Mayor Sylvester Turner planted the seed by insisting we bring people together across the city and industry to drive Houston’s energy future. He knew false choices have no place here: oil and gas and clean technology; prosperity and stewardship; industry and lower emissions.

ECW joined the Climate Week Network this year, connecting Houston to a growing community of more than 500,000 people across 22-plus cities. We now have a seat at the global table—and a responsibility to use it well, building with other cities and the wider clean-energy-solutions world rather than merely talking at them.

The capital is already moving. Since 2017, Houston Energy Transition Initiative member companies have invested more than $95 billion in low-carbon infrastructure, technologies, and research and development. This is where the transition is financed, engineered, tested and operated. But the work requires more than capital. It requires capital allocators who understand the difference between a promising idea and a project that can scale, hire and endure.

Last week was Houston’s show and tell. At ARTECHOUSE, The &Bassador Reception & Awards brought art, technology, culture, philanthropy and energy together. Then the week went beyond downtown.

Sugar Land Town Square became the launchpad for the Metro Innovation Tour & Market: a place for an ecosystem conversation about smart cities, clean energy, equitable access and next-generation mobility before participants boarded three tour routes across greater Houston. It was also the starting point for the Bay City South Innovation Tour to Erthos Project Bravo in Matagorda County, where small groups saw Earth Mount solar modules being installed in real time. The conversation did not end at a panel. It went to the project site.

The HTX Tech Tours included a visit to the Erthos Project Bravo in Matagorda County. Photo courtesy

Approximately 100 startups from around the world pitched at Rice Alliance, Greentown Labs and Halliburton Labs events. At Astros Night at Daikin Park, builders, backers, and believers traded conference rooms for the diamond, creating an experience, not just another event. That is how this work becomes civic fabric.

Activation also means making the energy story felt, not merely explained. AY Young brought the Battery Tour for live performances. It was a reminder that the “Power of &” is not confined to a boardroom or a laboratory. Art and technology, culture and commerce, a new generation and established industry can share the same stage—and help more people see themselves in the work ahead.

Perhaps no activation made the “Power of &” more immediate and real than the Houston, We Have Solutions open mic night. At Creatopia’s Innovation Studio, people took the mic—or simply listened—to share what they were building, the problem they could not stop thinking about, and the connection they hoped to make. It put founders, artists, community builders, researchers and future-makers in one room. That is collaboration in real time: different kinds of expertise meeting before anyone knows exactly what the solution will be.

FOX26 helped carry that story beyond the rooms we convened, hosting Erthos COO Jessica Knight, Mars Materials co-founder Aaron Fitzgerald, and investors Taylor Chapman and Juliana Garaizar to discuss building and backing the future in Houston. Our region should be proud—not as self-congratulation, but because the world is beginning to experience energy and climate solutions firsthand.

This was also a week to give back. Allies in Energy awarded $27,500 to nine organizations advancing energy and climate literacy, civil dialogue, workforce pathways and community action. NRG Energy’s Brighter Communities provided a founding gift to expand the week and fund local grants. It took partners, hosts, sponsors, volunteers, funders and community organizations. That is the “Power of &”: collaboration that leaves a stronger community behind.

The “Power of &” cannot stop at Houston’s city limits. Louisiana’s participation—through its support of the Digital Delta Symposium & Expo—made clear that Houston’s builder ecosystem is regional by necessity. Gulf Coast infrastructure, supply chains, talent, and industrial decisions do not recognize state lines. Neither should our collaboration. If we are serious about building more energy with fewer emissions, we must align capital, resources and opportunity across the entire Gulf Coast.

That same commitment to practical collaboration means listening, learning and adjusting. A builder’s mindset does not protect a plan simply because it came first; it improves the conditions for the work to succeed. That is why Houston Energy and Climate Week will move to April 4–10, 2027—better weather, more time and space for connection, and a stronger city-wide experience for the people building what comes next.

But the real test begins now. Can we keep widening the circle? Can we continue to turn research into projects, pilots into infrastructure, capital into good jobs and climate ambition into results that families and communities can see? Can we make every new solution stronger by bringing in the people who must finance it, build it, operate it, live beside it and benefit from it?

That is the work ahead. Turner understood that Houston does not move forward by asking who wins the argument. It moves forward by asking who is ready to solve the problem. His legacy—and the promise of the “&”—is an invitation to choose collaboration over division, action over performance and possibility over false choices.

The future does not need another city to talk about it. It needs Houston to keep building it. And it will only be built if we keep choosing the "&."

---

Katie Mehnert is the CEO of The Bee Suite, and a recent partner to The Builder’s Movement.

The high-speed train project, which is expected to reduce greenhouse gas emissions by more than 100,000 tons per year, is back on track. Photo courtesy of JR Central

Houston-Dallas bullet train gets back on the rails, races greener Texas travel

speeding back

In the latest chapter in the saga of the high-speed bullet train between Houston and Dallas, Amtrak is now involved.

According to a press release, Texas Central Partners and Amtrak are exploring a partnership to work together on the proposed Dallas-Houston high-speed rail project that's been under consideration for more than a decade.

Amtrak has cooperated with Texas Central on various initiatives since 2016 and the two entities are now evaluating a potential partnership to determine the line's viability.

“If we are going to add more high-speed rail to this country, the Dallas to Houston Corridor is a compelling proposition and offers great potential,” says Amtrak senior VP of High-Speed Rail Development Programs Andy Byford. “We believe many of the country's biggest and fastest-growing metropolitan areas, like Houston and Dallas, deserve more high quality high-speed, intercity rail service, and we are proud to bring our experience to evaluate this potential project and explore opportunities with Texas Central so the state can meet its full transportation needs.”

The route being proposed would span approximately 240 miles, going at 250 mph, resulting in a trip that would take less than 90 minutes between the two cities.

Texas Central has been working towards getting a train rolling since 2013, including lining up a potential builder in 2021. But the project has had pushback from Texas politicians and landowners along the route; a lawsuit against the project was filed by six rural counties in 2021, and the Texas Legislature passed a law prohibiting the state from spending any funds on the project.

Facing a seeming dead end, Texas Central CEO Carlos Aguilar and its board members resigned in June 2022; Michael Bui, a consultant, has been serving as CEO since then.

Texas Central and Amtrak have submitted applications to several federal programs in connection with further study and design work, including the Consolidated Rail Infrastructure Safety and Improvements (CRISI) grant program, the Corridor Identification and Development program, and the Federal-State Partnership for Intercity Passenger Rail (FSP-National) grant program.

Amtrak previously entered into an agreement with Texas Central to provide through-ticketing using the Amtrak reservation system and other support services for the planned high-speed rail line.

"This high-speed train, using advanced, proven Shinkansen technology, has the opportunity to revolutionize rail travel in the southern U.S., and we believe Amtrak could be the perfect partner to help us achieve that,” says Bui in a statement.

Despite its detractors, the project is forecast to provide social, environmental, employment and economic benefits including reducing greenhouse gas emissions by more than 100,000 tons per year, saving 65 million gallons of fuel and removing 12,500 cars per day from I-45.

The release from Amtrak has statements from both Dallas Mayor Eric L. Johnson and Houston Mayor Sylvester Turner, who calls the collaboration between Texas Central and Amtrak "an important milestone for the City of Houston and this project."

Byford joined Amtrak in April 2023 to begin developing a team focused on high-speed opportunities throughout the U.S. In his newly created role, he will develop and lead the execution of Amtrak’s long-term strategy for high-speed rail throughout the country, including the extension of the Crescent from Mississippi through Louisiana and Texas; Kansas DOT’s Heartland Flyer Extension Corridor Identification and Development (Corridor ID) connecting Wichita to Oklahoma and Texas, and TxDOT’s applications for the Texas Triangle (Houston — Dallas – Fort Worth – San Antonio) routes.

------

This article originally ran on CultureMap.

Ad Placement 300x100
Ad Placement 300x600

CultureMap Emails are Awesome

Chevron, Rice name latest cohort of energy transition fellows

energy fellowship

Chevron and Rice University have named 10 graduate students to the third cohort of the Chevron Energy Graduate Fellowship.

The recipients were announced at a reception at Rice University’s Sustainability Institute earlier this month. Their research and projects stem from a variety of fields, ranging from engineering to history and chemistry, and address larger efforts to help solve sustainability issues throughout the world. Fellows each receive a $10,000 award to support their research along with the opportunity to connect with industry experts. This year the fellowship will also connect recipients with subject matter experts from Chevron.

Vesna Mirkovic, strategic relationships manager at Innovation Chevron Technology Ventures, sees the fellowship as an opportunity for Rice graduate students and Chevron to learn from each other and seek the answers to tough questions.

“When academic and industry perspectives meet early on, the path from the lab to real-world applications becomes much easier,” Mirkovic said in a new release. “We see this fellowship as more than an award. It is a chance to learn from each other and ask difficult questions.”

Rice’s latest fellows and their fields include:

  • Abdullah Alqallaf, chemical and biomolecular engineering
  • Bohan Zhang, history
  • Emilia Mann, mechanical engineering
  • Fiona Chen, chemical and biomolecular engineering
  • Fu Yin, Earth, environmental and planetary sciences
  • Hossein Gazmeh, civil and environmental engineering
  • Monisha Vijay Kumar, applied physics
  • Rosie Zhu, Earth, environmental and planetary sciences
  • Yingxin Tang, civil and environmental engineering
  • Zikai Qian, chemical and biomolecular engineering

“This exciting partnership between the Sustainability Institute and Chevron represents our shared commitment to advancing scalable innovations in energy that lead to emissions reductions across energy value chains,” Rice President Reginald DesRoches added in the release. “This year’s fellows are tackling critical energy challenges, focusing on creating real-world solutions that can transform how we live, how we work and how we interact with our environment.”

For example, Gazmeh’s work addresses the global issue of logistics surrounding electronic vehicle charging stations and its infrastructures. Graduate student Vijay Kumar is developing carbon nanotube fiber devices for electrified gas heating applications. And Qian has developed a new way to extend the lifespan of membranes used to extract lithium from brine.

The Chevron Fellows program launched at Rice in 2024, naming 10 graduate students to the inaugural cohort. It is funded by Chevron and was created through a partnership with the Rice Sustainability Institute. Chevron launched a similar program at the University of Houston in 2023.

Read more about the most recent cohort here.

Fervo Energy adds transmission capacity at Cape Station geothermal project

geothermal expansion

Houston-based geothermal power company Fervo Energy has expanded its deal with Longroad Energy for transmission of electricity generated by Fervo’s Utah project.

Fervo added 105 megawatts to its existing 400-megawatt transmission deal with Longroad Energy, a Boston company that develops solar, wind and battery storage projects. The updated agreement will enable Fervo to deliver 505 megawatts of power from its marquee Cape Station geothermal project in Beaver County, Utah.

Dawn Owens, senior vice president of commercial markets at Fervo, said in a release that the new agreement brings another “105 megawatts of long-term, reliable capacity to the grid.”

Subject to regulatory approvals, the new agreement is expected to take effect in 2028.

“Longroad has worked alongside Fervo since its first efforts in Beaver County, and we’re excited to collaborate again,” Charles Spiliotis, chief development officer at Longroad, added in the release. “Providing transmission service for this next phase helps deliver clean, around-the-clock power to the grid.”

Cape Station recently began delivering carbon-free power. Capacity is on track to reach 100 megawatts in early 2027. The project’s second phase is targeted for completion in 2028. It will add 400 megawatts of capacity and is currently under construction.

Cape Station is adjacent to the U.S. Department of Energy’s Frontier Observatory for Research in Geothermal Energy and near the Blundell geothermal power plant.

Earlier this month, Tim Latimer, Fervo’s co-founder, chair, president and CEO, told Wall Street analysts the company had a $11.9 billion backlog of orders in the third quarter, up from $7.2 billion in the previous quarter.

Fervo signed the largest purchase agreement in its history in September with Google. The tech giant agreed to purchase 396 megawatts of geothermal power from Fervo with an option for Google to expand capacity to 1 gigawatt by June 2030. Financial terms weren’t disclosed.

Regulators OK Dow’s Gulf Coast nuclear reactor project

going nuclear

The federal government has given preliminary approval for construction of four nuclear reactors at a Dow site on the Texas Gulf Coast.

The U.S. Nuclear Regulatory Commission (NRC) recently signed off on a permit for Dow and Maryland-based nuclear reactor developer X-energy to build Long Mott Generating Station at Dow’s Seadrift complex. The complex is near Port Lavaca and about 140 miles southwest of Houston.

The NRC issued the permit but hasn’t yet authorized construction to start. The commission said it’s the first construction permit issued for a high-temperature gas-cooled nuclear reactor in nearly 60 years.

Edward Stones, vice president of Dow’s energy and climate business, said the permit approval represents “another important milestone” for Long Mott. It’s expected to be the first-ever advanced nuclear project at a North American industrial site.

Construction at Long Mott could begin before 2030.

Dow’s Seadrift complex manufactures chemicals and plastics. The roughly 4,700-acre site employs more than 1,200 people. Union Carbide, a Dow subsidiary, operates the parent company’s second-largest facility in Texas.

Long Mott will supply zero-carbon electricity and high-temperature steam at Seadrift, replacing current energy- and steam-generating methods. Dow and X-energy are developing the project with support from the U.S. Department of Energy’s Advanced Reactor Demonstration Program.

Mike Goff, principal deputy assistant secretary for nuclear energy, said the NRC’s approval “demonstrates meaningful progress toward deploying advanced reactors that can deliver reliable power and industrial heat, strengthen American energy leadership and expand the role of nuclear energy in meeting our nation’s growing energy demands.”

Plans call for four small X-energy modular reactors to operate at Long Mott. Each reactor would be capable of producing 80 megawatts of electricity or 200 megawatts of thermal energy. Initial delivery of energy could happen as soon as the early 2030s.

“Advanced nuclear has attractive advantages over other sources of clean power, including a compact footprint, competitive cost, and enhanced power and steam reliability,” said Jim Fitterling, executive chair of Dow.