The tool maps information on data center locations against other factors like energy, water, economics and politics. Photo courtesy Rice University

Have you ever wondered why data centers are located where they are?

Energy experts at Rice University’s Center for Energy Studies (CES) have developed a tool to help answer that question.

Rice researchers at the CES, part of Rice’s Baker Institute for Public Policy, have created an interactive map to track data center growth and energy infrastructure in the United States.

Kenneth B. Medlock III, Miaomiao Rimmer, Anmol Mital and Beck Edwards developed the tool, known as the U.S. Data Centers and Infrastructure map. It aims to provide a comprehensive view of the factors shaping where data centers are located, from power and water costs to infrastructure, public policy and local sentiment.

“The map lets you see why data centers are being built where they are by connecting the dots between infrastructure, power costs, water availability, public policy and public sentiment across different regions,” Medlock, senior director at CES, said in a news release. “You can zoom out and look at the whole U.S. to easily realize why data centers locations are being chosen—the price of power and water matters.”

The tool maps information on data center locations against other factors like energy, water, economics and politics. It also shows existing infrastructure in the area, including electric transmission lines, power plants, and fiber-optic networks, and provides information on water stress, electricity prices and natural gas prices.

According to Rice, the map will be updated in real time and currently includes information on existing data centers and proposed data centers.

Additionally, the map provides county-level analyses of news coverage and media to explore local attitudes towards the development of data centers in communities. Users can also explore political and demographic information.

According to the Pew Research Center, most data centers that are being built will appear in rural areas, with Virginia, Texas and Georgia leading the way in the number of planned facilities. Pew’s 2026 findings also noted that 38 percent of Americans live within 5 miles of at least one operational data center.

Meanwhile, Houston and Texas are poised for continued data center growth. Other reports predict that Houston’s data center capacity could more than double by 2028. Texas is home to an estimated 400-plus data centers, according to commercial real estate services provider CBRE.

Ad Placement 300x100
Ad Placement 300x600

CultureMap Emails are Awesome

Major oil exporters agree to keep production steady in November 2026

Oil News

Seven major oil-exporting countries agreed Sunday to keep production steady in November at a time when the Iran war has driven the price of benchmark Brent crude oil above $100 a barrel.

The so-called OPEC+ subgroup — Saudi Arabia, Russia, Iraq, Kuwait, Kazakhstan, Algeria and Oman — will meet again on November 1 to review conditions in the oil market.

The fighting with Iran, which began with U.S. and Israeli attacks on Feb. 28, has disrupted global oil supplies and driven prices higher.

The group of seven wealthy democracies said Friday that they plan to release 100 million barrels of oil and fuel products in the coming weeks, starting with “substantial” amounts of diesel.

Diesel prices recently hit record highs in the United States, squeezing farmers, truckers and consumers who depend on the fuel.

The G7 promised a “frontloaded substantial release” of diesel within the next 20 days and the rest over four months.

Hertha Metals raises $133M Series A round, plans high-purity iron plant

cleaner steel

Conroe-based Hertha Metals has closed a $133.65 million Series A round that includes a $65 million equity investment from the Pentagon. The startup uses a one-step process to convert iron into molten steel or high-purity iron.

Khosla Ventures and Doerr Capital co-led the round, with participation from CEV, Pear Ventures, Gates Frontier, Niterra SUISO no MORI Fund, Toyota Ventures, and Siemens Financial Services.

The federal investment came from the U.S. Department of Defense’s Industrial Base Analysis and Sustainment program. The program aims to strengthen and modernize the U.S. Defense Industrial Base, a network that researches, designs, builds, and maintains military weapons, equipment, technology, and services.

The Series A funding will finance construction of Hertha Chalyx, a plant that will be capable of producing 10,000 metric tons of steel-grade and magnet-grade high-purity iron.

Hertha says Chalyx will provide U.S.-made material for manufacturers of rare-earth magnets. Today, China controls more than 90 percent of the global manufacturing of rare-earth magnets.

Rare-earth magnets can be found in fighter jets, smart bombs, submarines, satellites, drones and other military hardware. These magnets are also key components in electric vehicle motors, wind turbines, computer hard drives, smartphones, headphones, cordless tools and an array of other products.

“Every electric vehicle, aerospace platform, radar system, and data center depends on domestic iron and magnet feedstock suppliers,” Laureen Meroueh, founder and CEO of Hertha, said in a press release.

“Hertha Chalyx closes that gap,” she added. “We are building the supply chain this country needs, and we are doing it by providing a domestic cost-competitive option for manufacturers while unlocking safer and cleaner production.”

Hertha says Chalyx, alongside its Pi100 pilot project, will be the first modern-day “iron and steel innovation complex.” The startup expects to break ground on Chalyx this year.

Since its founding in 2022, Hertha has raised more than $150 million from investors.

This spring, Hertha led the manufacturing category on Fast Company’s list of the World’s Most Innovative Companies of 2026.

3 must-know fall application deadlines for Houston energy innovators

Editor's note: As fall reaches full swing, Houston's innovation and cleantech scene is calling on the latest batch of founders and startups looking to make a difference. A number of accelerators have opened applications. Read below to see which might be a good fit for you or your venture. And take careful note of the deadlines. Please note: this article may be updated to include additional information and programs.

Did we miss an accelerator or competition accepting applications? Email innoeditor@innovationmap.com for editorial consideration.

Greentown Lab's Go Make 2027: Advanced Carbon Materials with ExxonMobil

Deadline: Oct. 9

Details: Greentown Labs is seeking applications from startups developing novel carbon-based technologies for its latest Go Make cohort in conjunction with ExxonMobil. The structured accelerator is designed to facilitate validation activities and explore potential long-term collaborations with Exxon, according to Greentown. Founders will have the opportunity to engage directly with industry leaders to test, validate and scale their carbon technologies in real commercial contexts. The program tentatively starts on Jan. 20, 2027 and concludes June 16, 2027. Find more information here.

Activate's U.S. Fellowship Cohort 2027

Deadline: Oct. 30

Details: Activate supports scientists at "the outset of their entrepreneurial journey." It partners with U.S.-based funders and research institutions to support its fellows in developing high-impact technology. Its fellows receive a living stipend, research and development funding, connections from Activate's robust network of mentors and access to a curriculum specific to the program for two years. Applicants must have a bachelor’s degree and 4-plus years of post-baccalaureate scientific research, engineering or technology development experience. Their work must be based in the physical or biological sciences or related engineering disciplines. Find more information here.

Rice Innovation Fellows

Deadline: Oct. 30

Details: The Liu Idea Lab for Innovation and Entrepreneurship (Lilie)'s Rice Innovation Fellows program supports Rice Ph.D. students and postdocs in turning their research into real-world ventures. Participants receive $10,000 in translational research funding, co-working space and personalized mentorship. Candidates from all Rice engineering and science-related disciplines are encouraged to apply. Find more information here.

---

A version of this article originally appeared on our sister site, InnovationMap.