Hear startup pitches, panels and fireside chats from energy transition leaders next week. Photo via Greentown Labs

Greentown Labs' Climatetech Summit Houston will take place next Tuesday, Nov. 4, bringing together philanthropists, executives and innovators in the energy transition space.

John Arnold, co-founder and co-chair of Arnold Ventures, will participate in the keynote fireside chat with Greentown CEO Georgina Campbell Flatter. The conversation will explore "top priorities and opportunities in energy innovation today—with a special focus on how these dynamics are playing out in Houston," according to Greentown.

Other highlights will include:

  • Welcome remarks from Houston Mayor John Whitmire
  • A course led by TEX-E Executive Director Sandy Guitar
  • A philanthropy panel featuring Greentown Labs new Head of Philanthropy Stacey Harris
  • The Energy Jobs of the Future, featuring Sameer Bandhu, GE Vernova’s managing director, ventures and licensing
  • An Energy-transition Roadmap, featuring Monica Krishnan, Hermann Lebit and Bobby Tudor and moderated by Varun Rai
  • What is Climatetech? featuring Kyle Judah, Emerson Denka Wangdi, Laureen Meroueh and Head of Greentown Houston Lawson Gow

Ten Greentown Labs startups will also present their pitches at the event. Expect to hear from:

  • MCatalysis Inc. CEO, President, and Founder Michael D. Irwin. Dallas-based MCatalysis develops novel, high-efficiency industrial microwave processes and catalysts to produce low-cost, clean synthetic fuels and chemicals from waste carbon resources.
  • Pike Robotics CEO and co-founder Connor Crawford. Austin-based Pike Robotics provides next-gen robotic solutions for in-service inspection of floating roof storage tanks.
  • Helix Earth CEO and co-founder Rawand Rasheed. Houston-based Helix Earth retrofits commercial HVAC systems to improve energy efficiency.
  • 10DQ CEO Steven Reece. Greentown Boston member 10DQ has developed its Redox Loop Battery, which uses novel, water-based electrolytes to store energy in dense, low-cost, earth-abundant battery materials.
  • Janta Power CEO Mohammed Njie. Dallas-based Janta Power is developing 3D solar towers.
  • Neuralix business operations and product developer Annorah Lewis. Houston-based Neuralix offers a suite of rapid, customizable templates for the data lifecycle for the energy and manufacturing sectors.
  • Ententia co-founder Nishant Shah. Houston-based Etenitia develops enterprise AI platforms and systems that use domain expertise, rich multi-modal industrial datasets, and generative AI technology to power more effective and efficient business workflows.
  • Locoal CEO Miles Murray. Boerne, Texas-based Locoal is a waste-to-energy company that has developed a proprietary mobile containerized fluidized gasifier that diverts waste, converts it to clean energy and captures carbon in value-added co-products.
  • SpiralWave co-founder Adam Amad. San Francisco-based SpiralWave has developed novel electrochemical carbon capture technology that lowers costs.
  • Biatech founder and CEO Nathan Hartwig. Tampa-based Biatech has built an application-layer AI platform to help energy, mining and infrastructure operators optimize asset performance, reduce risk and improve decision-making.

In addition to the startup pitches, attendees will also be able to meet founders and Greentown members during the afternoon startup showcase. A networking reception at Axelrad Houston follows. A separate ticket offers admission to the showcase and networking event only.

See the full agenda here.

Ad Placement 300x100
Ad Placement 300x600

CultureMap Emails are Awesome

Solar manufacturer expands Houston footprint with new 4 GW factory

coming soon

Houston-based SEG Solar plans to open a new 4-gigawatt solar module manufacturing facility in Cypress.

The facility represents more than a $200 million investment and will raise SEG's total annual U.S. module production capacity to approximately 6 gigawatts, according to a new release. The expansion is part of SEG’s long-term goal of becoming one of the largest 100 percent U.S.-owned module manufacturers.

The new 500,000-square-foot facility will be located on Telge Road and is expected to create 800 new jobs, according to reports.

“This new facility marks an important milestone for SEG,” Timothy Johnson, VP of operations, said in the release. “It will further strengthen our U.S. manufacturing capabilities while supporting ongoing technology innovation. The plant is designed with the flexibility to integrate next-generation technologies, including (heterojunction solar technology) as the industry evolves.”

Commercial operations at the new facility are expected to commence in Q3 2026.

SEG is also developing a 5-gigawatt ingot and wafer manufacturing facility in Indonesia. Construction on the facility is expected to begin in Q2 2026.

In 2024, SEG Solar opened a new $60 million, 250,000-square-foot facility in Houston to house its production workshops, raw material warehouses, administrative offices, finished goods warehouses and supporting infrastructure. Read more here.

Fervo Energy bumps up IPO target to $1.82B

IPO update

Houston-based geothermal power company Fervo Energy is now eyeing an IPO that would raise $1.75 billion to $1.82 billion, up from the previous target of $1.33 billion.

In paperwork filed Monday, May 11 with the U.S. Securities and Exchange Commission, Fervo says it plans to sell 70 million shares of Class A common stock at $25 to $26 per share.

In addition, Fervo expects to grant underwriters 30-day options to buy up to 8.33 million additional shares of Class A common stock. This could raise nearly $200 million.

When it announced the IPO on May 4, Fervo aimed to sell 55.56 million shares at $21 to $24 per share, which would have raised $1.17 billion to $1.33 billion. The initial valuation target was $6.5 billion.

A date for the IPO hasn’t been scheduled. Fervo’s stock will be listed on Nasdaq under the ticker symbol FRVO.

Fervo, founded in 2017, has attracted about $1.5 billion in funding from investors such as Bill Gates-founded Breakthrough Energy Ventures, Google, Mitsubishi Heavy Industries, Devon Energy (which is moving its headquarters to Houston), Tesla co-founder JB Straubel, CalSTRS, Liberty Mutual Investments, AllianceBernstein, JPMorgan, Bank of America and Sumitomo Mitsui Trust Bank.

Fervo’s marquee project is Cape Station in Beaver County, Utah, the world’s largest EGS (enhanced geothermal system) project. The first phase will deliver 100 megawatts of baseload clean power, with the second phase adding another 400 megawatts. The site can accommodate 2 gigawatts of geothermal energy. Fervo holds more than 595,000 leased acres for potential expansion.

Cape Station has secured power purchase agreements for the entire 500-megawatt capacity. Customers include Houston-based Shell Energy North America and Southern California Edison.

Modular nuclear reactor company opens office in Houston

new to hou

The nuclear energy renaissance continues in Texas with an announcement by NuScale Power. The Oregon-based provider of proprietary and innovative advanced small modular reactor (SMR) nuclear technology announced in April it would be opening office space in Houston’s CityCentre.

“Opening this space in Houston underscores our commitment to meeting rising energy demand with safe, scalable nuclear technology,” John Hopkins, NuScale president and CEO, said in a news release. “This move expands our presence in a key market for partners, prospective customers, and stakeholders in addition to positioning us for the future as we focus on the near-term deployment of our industry-leading technology. Texas is leading the way in embracing advanced nuclear for grid resilience and industrial decarbonization, and we’re proud to expand our footprint and capabilities in this important region.”

Interest in nuclear power has been growing in recent years thanks to tensions with oil-rich nations, concerns about man-made climate change from fossil fuels, and the rapidly increasing power needs of data centers. Both Dow and Texas A&M University have announced expanded nuclear power projects in the last year, with an eye of changing the face of Texas’s energy industry through smaller, safer fission reactors.

Enter NuScale, founded in 2007 from technology developed at the University of Oregon. Their modular SMR technology generates 77 megawatts and is one of the only small modular reactors (SMR) to receive design approval from the U.S. Nuclear Regulatory Commission (NRC). These advances have led to runaway success for NuScale, whose stock has risen by more than 1,670 percent since the start of 2024.

The new operations campus in CityCentre is expected to facilitate the movement, installation and coordination of NuScale technology into the various energy systems. Typically, SMRs are used for off-grid installations, desalination operations, mining facilities and similar areas that lack infrastructure. However, the modularity means that they can be easily deployed to a variety of areas.

It comes none too soon. ERCOT projects that Texas data centers alone will require 77,965 megawatts by 2030.