The new bp pulse station is the first bp pulse branded Gigahub in the US and will be open to the public. Photo via bp.com

Energy giant bp is opening a large electric-vehicle charging site at its American headquarters in Houston.

The new bp pulse station is the first bp pulse branded Gigahub in the US and will be open to the public. The Gigahub, will offer 24 high-speed EV charge points with Tritium 150kW DC fast chargers. The chargers will be integrated with the bp pulse app, which assists users to locate the site, access real-time charging availability, and WiFi capabilities.

"As we expand our global footprint, I am thrilled to unveil our first EV charging Gigahub in the US,” Emma Delaney, bp executive vice president for customers and products, says in a news release. “With leading fast charging positions already in key markets in the UK, China, and Germany, we're learning about customer charging preferences on the go.”

The plan for bp pulse includes continued deployment of additional charging points at high-demand spots like major metropolitan areas, bp-owned properties, and airports. The company has also been awarded grant funds through programs including National Electric Vehicle Infrastructure and California Energy Commission, which will help to provide charging infrastructure at sites in Virginia,California, Pennsylvania, Tennessee and Kentucky.

Last year, bp announced plans to invest $1 billion in EV charging infrastructure by 2030, with $500 million invested in by the end of 2025.

"We're excited to bring bp pulse to America's energy corridor and expand our presence in the US public EV-charging market," CEO of bp pulse Americas Sujay Sharma said in a news release "This project will bring fast, reliable charging to EV drivers when and where they need it, helping support faster electric-vehicle adoption in the US. We look forward to welcoming new and existing EV drivers to our growing network."

The PhD and doctoral students will each receive a one-year $12,000 fellowship, along with mentoring from experts at UH and Chevron. Photo via UH.edu

University of Houston names first group of Chevron-backed fellows

meet the chosen ones

The University of Houston has named eight graduate students to its first-ever cohort of UH-Chevron Energy Graduate Fellows.

The PhD and doctoral students will each receive a one-year $12,000 fellowship, along with mentoring from experts at UH and Chevron. Their work focuses on energy-related research in fields ranging from public policy to geophysics and math. The fellowship is funded by Chevron.

“The UH-Chevron Energy Fellowship program is an exciting opportunity for our graduate students to research the many critical areas that impact the energy industry, our communities and our global competitiveness,” Ramanan Krishnamoortil UH's Vice President for Energy and Innovation says in a statement.

“Today’s students not only recognize the importance of energy, but they are actively driving the push for affordable, reliable, sustainable and secure energy and making choices that clearly indicate that they are meaningfully contributing to the change,” he continues.

“We love that Chevron is sponsoring this group of fellows because it’s a fantastic way for us to get involved with the students who are working on some of the biggest problems we’ll face in society,” Chevron Technology Ventures President Jim Gable adds.

The 2023 UH-Chevron Energy Graduate Fellows are:

Kripa Adhikari, a Ph.D. student in the Department of Civil and Environmental Engineering in the Cullen College of Engineering. Her work focuses on thermal regulation in enhanced geothermal systems. She currently works under the mentorship of Professor Kalyana Babu Nakshatrala and previously worked as a civil engineer with the Nepal Reconstruction Authority.

Aparajita Datta, a researcher at UH Energy and a Ph.D. candidate in the Department of Political Science. Her work focuses on the federal Low-Income Home Energy Assistance Program (LIHEAP), a redistributive welfare policy designed to help households pay their energy bills. She holds a bachelor’s degree in computer science and engineering from the University of Petroleum and Energy Studies in India, and master’s degrees in energy management and public policy from UH. She also recently worked on a paper for UH about transportation emissions.

Chirag Goel, a Ph.D. student in materials science and engineering at UH. His work focuses on using High Temperature Superconductors (HTS) to optimize manufacturing processes, which he says can help achieve carbon-free economies by 2050. The work has uses in renewable energy generation, electric power transmission and advanced scientific applications.

Meghana Idamakanti, a third-year Ph.D. student in the William A. Brookshire Department of Chemical and Biomolecular Engineering. Her work focuses on using electrically heated steam methane for cleaner hydrogen production. She received her bachelor’s degree in chemical engineering from Jawaharlal Nehru Technological University in India in 2020 and previously worked as a process engineering intern at Glochem Industries in India.

Erin Picton, an environmental engineering Ph.D. student in the Shaffer Lab at UH. Her work focuses on ways to increase the sustainability of lithium processing and reducing wasted water and energy. “I love the idea of taking waste and turning it into value,” she said in a statement. She has previously worked in collaboration with MIT and Greentown Labs, as chief sustainability officer of a Houston-based desalination startup; and as a visiting graduate researcher at Argonne National Lab and at INSA in Lyon, France.

Mohamad Sarhan, a Ph.D. student and a teaching assistant in the Department of Petroleum Engineering. His work focuses on seasonal hydrogen storage and the stability of storage candidates during hydrogen cycling. He holds a bachelor’s degree and a master’s degree in petroleum engineering from Cairo University

Swapnil Sharma, a Ph.D. student in the William A. Brookshire Department of Chemical and Biomolecular Engineering. His work has been funded by the Department of Energy and focuses on thermal modeling of large-scale liquid hydrogen storage tanks. He works with Professor Vemuri Balakotaiah. He holds bachelor's and master’s degrees in chemical engineering from the Indian Institute of Technology (IIT). He also developed one of the world’s highest fiber-count optical fiber cables while working in India and founded CovRelief, which helped millions of Indians find resources about hospital beds, oxygen suppliers and more during the pandemic.

Larkin Spires, who's working on her doctoral research in the Department of Earth and Atmospheric Sciences in the College of Natural Sciences and Mathematics. Her work focuses on a semi-empirical Brown and Korringa model for fluid substitution and the ties between geophysics and mathematics. She works under Professor John Castagna and holds a bachelor’s degree in math from Louisiana State University and a master’s degree in geophysics from UH.

Earlier this month Evolve Houston also announced its first-ever cohort of 13 microgrant recipients, whose work aims to make EVs and charging infrastructure more accessible in some of the city's more underserved neighborhoods.

Ad Placement 300x100
Ad Placement 300x600

CultureMap Emails are Awesome

Buoyed by $1.3B sales backlog, microgrid company ERock files for IPO

eyeing ipo

Another energy company in Houston is going public amid a flurry of energy IPOs.

Houston-based ERock Inc., which specializes in utility-grade onsite microgrid systems for data centers and other customers, has filed paperwork with the U.S. Securities and Exchange Commission (SEC) to sell its shares on the New York Stock Exchange.

The ERock filing follows the recent $1.9 billion IPO of Houston-based Fervo Energy, a provider of geothermal power that’s now valued at $7.7 billion.

Another Houston energy company, EagleRock Land, just went public in a $320 million IPO that values the company at $3 billion. EagleRock owns or controls about 236,000 acres in the Permian Basin, earning money from royalties, fees, easements, water services and other revenue streams tied to drilling on its land.

According to Barron’s, more than a dozen energy and energy-related companies in the U.S. have gone public since the beginning of 2025, with the bulk of the IPOs happening this year.

ERock’s SEC filing doesn’t identify the per-share pricing range for the IPO or the number of Class A shares to be offered. ERock is a portfolio company of Energy Impact Partners, a New York City-based venture capital and private equity firm that invests in energy companies.

The company previously did business as Enchanted Rock. ERock Inc., formed in January, will function as a holding company that controls predecessor company ER Holdings Ltd.

In 2025, ERock generated revenue of $183.1 million, up 42.5 percent from the previous year, according to the IPO filing. It recorded a net loss of $59 million last year.

As of March 31, ERock boasted a sales backlog of nearly $1.3 billion, up 779 percent on a year-over-year basis. The company attributes most of that increase to greater demand from data centers.

The company primarily serves the power needs of data centers, utilities, industrial facilities, and commercial buildings. Its biggest markets are Texas and California.

“Several U.S. markets, such as Texas and California, face especially acute reliability risks,” ERock says in the SEC filing. “Texas already shows rapid load-growth pressures tied to data centers and industrial expansion, while California faces grid congestion, long interconnection queues, and above-average vulnerability to extreme heat- and weather-driven outages.”

Since its founding in 2018, ERock has installed microgrid systems at more than 400 sites with a capacity of about 1,000 megawatts. Customers include ComEd, Foxconn, H-E-B, Microsoft and Walmart.

By the end of this year, the company plans to expand its production of microgrid systems to a capacity of about 1.2 gigawatts with the opening of its Hyperion facility in Houston.

John Carrington leads ERock as CEO. He joined ER Holdings last year as chairman and CEO. Carrington previously was CEO of Houston-based Stem, a public company that offers AI-enabled clean energy software and services. Earlier, he spent 16 years at General Electric.

Houston investment firm closes $105M energy venture fund

seeing green

Houston-based investment firm Veriten has announced the initial close of its second flagship energy venture fund with more than $105 million in capital commitments.

Fund II will build on Veriten’s initial fund and aim to support “scalable technology solutions for energy, power and industrial applications,” according to a company news release.

"Our differentiated network, research-driven process, and first principles approach to investing are having an impact across multiple verticals including traditional energy, electrification, and industrial technology. Fund II builds on that platform,” John Sommers, partner, investments at Veriten, added in the release. “In this environment, the differentiator isn't capital – it's all about connectivity, deep sector expertise, and an economically-driven approach. As new technologies and approaches develop at breakneck speed, the need for more reliable, affordable energy and power continues to grow dramatically. The current backdrop accentuates the need for Veriten's solution."

Veriten is supported by over 50 strategic partnerships in the energy, power, industrial and technology sectors, including major players like Halliburton and Phillips 66.

"Veriten continues to build a differentiated platform at the intersection of energy, technology and industry expertise," Jeff Miller, chairman and CEO of Halliburton, said in the release. "We were early believers in the team and their ability to identify practical solutions to real challenges across the energy value chain. As all industries increasingly adopt digital tools, automation and AI-enabled technologies to improve performance and execution, we are proud to partner with Veriten again to help accelerate high-impact solutions across the broader energy landscape."

Veriten closed its debut fund, NexTen LP, of $85 million in committed capital in October 2023. It was launched in January 2022 by Maynard Holt, co-founder and former CEO of the energy investment bank Tudor, Pickering, Holt & Co.

It has invested in Houston-based AI-powered electricity analytics provider Amperon and led a $12 million Seed 2 funding round for Houston-based Helix Technologies to scale manufacturing of its energy-efficient commercial HVAC add-on earlier this year. In the past year it has contributed to funding rounds for San Francisco-based Armada and Calgary-based Veerum.

Veriten also named Nick Morriss as its new managing director earlier this month. Morriss most recently served as vice president of business development at next-generation nuclear technology company Natura Resources and spent nearly 20 years at NOV Inc.

Houston energy expert asks: Who pays when AI outruns the power grid?

Guets Column

For most of the past 20 years, U.S. electricity policy relied on predictable trends in demand. Electricity use, in most regions, increased gradually, forecasts were stable, and utilities adjusted the system in small steps. Power plants, transmission lines, and substations were generally added to reflect shifts in load, rather than growth, and costs were recovered through modest adjustments to customer bills.

Growth in AI data centers has disrupted this model. A single facility can add as much electricity demand as a small town. That demand comes all at once, runs continuously, and has little tolerance for outages. If electricity service drops even briefly, computation stops, and services shut down. Ironically, data centers need reliable service, a point that their emergence is driving concern around for the rest of the grid.

What the numbers say

The International Energy Agency projects global electricity consumption from data centers to double by 2030, reaching roughly 945 TWh, nearly 3 percent of global electricity demand, with consumption growing about 15 percent per year this decade. McKinsey projects that U.S. data center demand alone could grow 20–25 percent per year, with global capacity demand more than tripling by 2030.

After years of roughly 0.5 percent annual demand growth, many forecasts now place total U.S. electricity demand growth closer to 2–3 percent per year through the mid-2030s, with much higher growth in specific regions. In Texas, some forecasters are saying electricity demand could double over the next five years, a staggering 10 percent per year growth rate. What sounds incremental on paper translates into a major challenge on the ground. Meeting this pace of growth is estimated to require $250–$300 billion per year in grid investment, about double what the system has been absorbing.

Where the system starts to strain

The strain appears first in the interconnection queue. It shows up as long waits, backlogs, and delays for connecting new loads and new generation.

Before new generators or large load customers can be connected, a study is required to assess their impact on the grid, whether it can physically handle the added load, and whether upgrades are required. With AI-driven data centers, utilities face far more connection requests than they can realistically support. In ERCOT, large-load interconnection requests exceed 200 gigawatts, most tied to data centers. That amount exceeds historical norms, and it is several times larger than what can be practically studied or built in the near term.

To be clear, public utility commissions are required to study these requests because they must manage system capabilities to ensure minimal disruption. This means engineers spend time evaluating projects that may never be built, while other more commercially viable projects may wait longer for approvals. This extends timelines and makes infrastructure planning less reliable.

Why policymakers are rethinking the rules

Utilities and their regulators must decide how much generation, transmission, and substation capacity to build years before it comes online. Those decisions are based on expected demand at the time projects are approved. When it comes to data centers, by the time infrastructure is completed, they may end up deploying newer, more efficient chips that use less power than originally assumed. This can result in grid infrastructure built for a higher load than what actually materializes, leaving excess capacity that still must be paid for through system-wide rates.

That’s the central dilemma. If utilities build too little capacity, the system operates with less reserve margin. During periods of grid stress, operators have fewer options, increasing the likelihood of curtailments or outages. However, if utilities build too much, customers may be asked to pay for infrastructure that is not fully used.

In response, policymakers are adjusting the rules. In some regions, regulators are moving toward bring-your-own-power approaches that require large data centers to supply or fund part of the capacity needed to serve them or reduce demand during system stress. At the federal level, permitting reforms tied to datacenter infrastructure increasingly treat electricity as a strategic economic input.

As Ken Medlock, senior director at the Baker Institute Center for Energy Studies (CES), explains:

“Many of the planned data centers are now also adding behind-the-meter options to their development plans because they do not anticipate being able to manage their needs solely from the grid, and they certainly cannot do so with only intermittent power sources.”

Behind-the-meter (BTM) refers to power that a consumer controls on its side of the utility meter, such as on-site gas generation or a dedicated power plant. These resources allow data centers to keep operating during grid-related service. Most facilities remain connected to the grid, but the backup BTM generation serves as insurance for operating their core business.

This shifts responsibility. Utilities traditionally manage reliability across all customers by maintaining an operating reserve margin, or spare capacity. Increasingly, large-load customers manage part of their own electricity reliability needs, which changes how infrastructure is planned and how risk is distributed.

Bottom line

AI-driven load growth is arriving faster and in more concentrated places than the power system was built to accommodate. Utilities and regulators are being forced to make decisions sooner than planned about where to build, how fast to build, and which customers get priority when capacity is limited. The effects extend beyond data centers, showing up in system costs, reliability margins, competition for grid access, and pressure on communities and industries that depend on affordable and dependable power. The issue is not whether electricity can be generated, but how the costs and risks of rapid demand growth are distributed as the system tries to keep up. How regulators balance these decisions will determine who pays as AI demand outruns the power grid.

-----------

Scott Nyquist is a senior advisor at McKinsey & Company and vice chairman, Houston Energy Transition Initiative of the Greater Houston Partnership. The views expressed herein are Nyquist's own and not those of McKinsey & Company or of the Greater Houston Partnership. This article originally appeared on LinkedIn.