Expro has secured a $10 million contract to provide a subsea well decommissioning solution, combining subsea safety systems and surface fluid management to support safe re-entry and fluid management for plugged and abandoned wells. Photo courtesy of Expro

Houston energy services provider Expro was awarded a contract valued at over $10 million for the provision of a well decommissioning solution.

The solution will combine subsea safety systems and surface processing design that can enable safe entry to the well and management of well fluids.

“The contract reinforces our reputation as the leading provider of subsea safety systems and surface well test equipment, including within the P&A sector,” Iain Farley, Expro’s regional vice president for Europe and Sub-Saharan Africa, says in a news release. "It demonstrates our commitment to delivering best-in-class equipment, allied with the highest standards of safety and service quality that Expro is renowned for.”

Expro will provide from its global support hub in Aberdeen, a surface fluid management package and a market-leading 7-3/8 inch large-bore subsea test tree assembly (SSTTA). This will include surface tree and controls that can provide dual barrier and disconnect capability to facilitate re-entry into the subsea wells.

Expro has been supplying its subsea safety systems and well test equipment to the construction of many of the 52 wells now being plugged and abandoned.

“Having been involved in the development phase for many of these fields, we have gained a life of well experience that will be invaluable for this P&A campaign,” Farley adds. “Our expertise and know-how will help deliver key technical and commercial benefits for the client across the project.”

GA Drilling opened its Houston office in 2013 to tap into the region’s oil and gas industry. Photo via Getty Images

Drilling tech co. with Houston HQ to partner on European geothermal power plant

growing abroad

GA Drilling, a provider of geothermal drilling technology whose U.S. headquarters is in Houston, is teaming up with a European energy company to develop a geothermal power plant in Germany.

GA Drilling and ZeroGeo Energy, a Swiss company specializing in renewable energy, say the 12-megawatt Hot Dry Rock Geothermal Power Plant (Project THERMO) is the first of several geothermal power and geothermal energy storage projects they’re planning in Europe. GA Drilling will supply technology for Hot Dry Rock, and ZeroGEO will operate the plant.

“The need for clean baseload power is real, and geothermal has the highest potential to deliver that safely and securely. We’re excited to be collaborating with ZeroGeo to help address the power needs in Europe,” Dusan Kocis, co-founder and chief operating officer of Slovakia-based GA Drilling, says in a news release.

GA Drilling opened its Houston office in 2013 to tap into the region’s oil and gas industry.

Last year, GA Drilling conducted the first public demonstration of its latest deep drilling tool, ANCHORBIT. GA Drilling says it developed the tool to cut the cost of deep geothermal drilling by doubling drilling speeds and extending the life of drill bits.

GA Drilling performed the ANCHORBIT test at Nabors Industries’ technology center in Houston. Nabors, a drilling contractor based in Houston, is using GA Drilling’s technology in its drilling operations.

In 2022, Nabors invested $8 million in GA Drilling.

“Given the expected sharp growth in global energy consumption over the next decades, the world will require an even sharper growth in sustainable energy supply. I am convinced that geothermal energy will be a key contributor to the necessary increase in clean energy generation,” Anthony Petrello, chairman, president, and CEO of Nabors, said in an announcement about the GA Drilling investment.

Ad Placement 300x100
Ad Placement 300x600

CultureMap Emails are Awesome

SLB teams with Liberty Energy on modular power for AI data centers

ai alliance

Houston-headquartered SLB and Denver-based Liberty Energy Inc. announced a strategic agreement this month to support the rapid growth of new data center capacity.

Under the agreement, SLB will supply modular data center infrastructure and oversee large-scale execution, while Liberty will provide modular power generation systems and behind-the-meter power management technology for developers looking to add capacity. According to Reuters, the power will come from natural gas generation.

“The bottleneck in AI infrastructure is no longer just compute. It is the ability to deliver infrastructure and power on the timelines the market now demands,” Gavin Rennick, president of SLB’s New Energy and Industrial business, said in a news release. “By bringing together complementary infrastructure and power capabilities, we will help developers accelerate deployment of new data center capacity.”

The companies seek to specifically offer the modular technologies in areas without traditional grid connections or where grid capacity is limited.

They also aim to improve the "efficiency, flexibility and environmental performance of future data center energy systems," potentially through solutions like hybrid power systems and digital energy management, according to the news release.

Goldman Sachs estimates that U.S. data center capacity will more than double from 31 gigawatts in 2025 to 66 gigawatts in 2027. Other reports predict that Houston and Texas will be home to a significant portion of the data center boom, with capacity in the city and the state also expected to double in the next few years.

“The scale and complexity of AI energy infrastructure is fundamentally changing how power systems are built and deployed,” Ron Gusek, CEO of Liberty Energy, added in the release. “Liberty’s comprehensive power service platform is engineered to meet this transition, as customers increasingly prioritize tailored, integrated solutions. Building on our long-standing relationship with SLB, we are excited to bring power solutions that address immediate capacity constraints while supporting the next generation of energy systems.”

SLB sold its onshore hydraulic fracturing business in the United States and Canada to Liberty Energy in December 2020 in exchange for a 37 percent equity interest in the company.

New Rice study details how carbon capture could reduce AI data center emissions

by the numbers

A new study out of Rice University points to carbon capture and storage methods as pivotal solutions to addressing emissions from AI-driven data centers.

The study was authored by Hon Chung Lau, an adjunct professor in the Department of Chemical and Biomolecular Engineering at Rice University and founder of Low Carbon Energies LLC, and Steve C. Tsai, an energy transition consultant at Low Carbon Energies LLC, and published in the journal Energy & Fuels.

According to the study, U.S. data center power capacity could more than quadruple in five years, growing from 40 gigawatts in 2025 to 169 gigawatts by 2030. Without proper regulation of emissions, the report estimates that carbon dioxide produced by fossil-fuel power plants supplying electricity to data centers could grow at the same scale, increasing from 90 million metric tons to more than 404 million metric tons over the same time period.

The researchers analyzed publicly available data on announced U.S. data centers, which included energy sources, locations, and projected power capacity before estimating data center-related carbon emissions based on each state’s electricity mix. From there, they examined whether those emissions could be captured and stored underground in saline aquifers.

The team estimates that 34 states have enough saline aquifer storage capacity to store more than 100 years of projected data center-related carbon dioxide emissions beyond 2030. Aquifers could store an estimated 59 million metric tons of data center-related carbon dioxide, or about 66 percent of the sector’s emissions in 2025. However, that calculation could grow to 299 million metric tons, or about 74 percent of projected data center-related emissions by 2030.

The researchers found that more than 90 percent of data center-related carbon dioxide emissions could potentially be mitigated through carbon capture and storage when out-of-state storage options are included, even though they note that carbon capture isn’t the only solution.

“It does show that the geology exists to make a meaningful impact, especially in states where data center growth is strongest,” Lau said in a news release.

Rapid growth in states including Texas, Virginia, Pennsylvania, Ohio, Arizona, Colorado, Utah and Illinois was considered in the study. According to the findings, Texas would need to add 25 gigawatts of power capacity by 2030 to meet projected data center demand, as data centers require reliable electricity 24/7.

“Data centers are becoming one of the defining energy challenges of the AI era,” Lau added in the news release. “The question is not only whether we can build enough computing infrastructure, but whether we can power it in a way that is reliable, affordable and compatible with decarbonization goals.”

Shell strikes $1.8B deal to offload solar and wind assets in India

Renewable Exit

Reflecting its ongoing de-emphasis of renewable energy, oil and gas giant Shell has agreed to sell its solar and wind power business in India for $1.8 billion.

Aditya Birla Renewables Ltd. (ABRen) is the pending buyer of Solenergi Power Private Ltd., including the Sprng Energy group of companies. Sprng Energy develops, owns and operates utility-scale solar and wind power facilities in India.

Shell, whose U.S. headquarters is in Houston, acquired Solenergi in 2022 for $1.55 billion.

ABRen is Aditya Birla Group’s renewable energy platform. Global Infrastructure Partners, part of asset manager BlackRock, is a strategic investor in ABRen. ABRen develops and operates solar, wind, hybrid and battery storage projects in India.

“This agreement reflects Shell’s continued focus on adjusting the portfolio in our power business,” Machteld de Haan, Shell’s president of downstream, renewables and energy solutions, said in a news release. “We are high-grading our power portfolio and recycling capital in service of our asset-backed trading strategy … This is another step in building a more focused, competitive, and resilient business while improving returns year on year towards 2030.”

Under Wael Sawan, who was named CEO of Shell in 2023, the company has moved away from large-scale, low-yield green energy projects to concentrate on high-margin sectors. Those sectors include natural gas, LNG, deep-water drilling and global energy trading.

The Solenergi deal, expected to close by the end of this year, signals yet another move in Shell’s reassessment of its renewables business. The company has said it will no longer invest in offshore wind projects, but it remains committed to becoming a net-zero emissions business by 2050.

Shell said India remains an important market. In India, Shell offers LNG supply and regasification for downstream users, and also operates Shell Mobility and Shell Lubricants.

The proposed sale of the Indian renewables business continues Shell’s decreasing focus on renewables. In October, Shell exited Atlantic Shores Offshore Wind, a 50-50 joint venture created to offshore wind projects off the coast of New Jersey and New York.

Shell has declared it will not make new investments in offshore wind generation, favoring existing ventures and the expansion of EV charging infrastructure.

The company also announced plans to shut down its Volta C electric vehicle charging business in August 2025.