A tie-up between Diamondback and Endeavor, if it succeeds, would create a player in the massive Permian Basin oil and gas field that straddles Texas and New Mexico. Photo via Unsplash

Diamondback Energy will attempt to buy rival Endeavor Energy Resources to create an energy giant in the Southwestern United States worth more than $50 billion.

Growing confidence in an economic recovery, particularly in the U.S., has driven massive deals in the energy sector in recent months, including Chevron's $53 billion acquisition of Hess in October, and a $59.5 billion deal two weeks before that by Exxon Mobil, its biggest acquisition since buying Mobil two decades ago.

A tie-up between Diamondback and Endeavor, if it succeeds, would create a player in the massive Permian Basin oil and gas field that straddles Texas and New Mexico.

It would be the third largest producer in the Permian behind Exxon and Chevron, overseeing 838,000 acres and potentially producing 816,000 oil-equivalent barrels each day.

Diamondback said Monday that it will buy Endeavor in a cash-and-stock deal valued at about $26 billion.

Endeavor is the largest private operator in the Permian Basin. Drillers can pull more than 4 million barrels of oil equivalent from the Permian daily and the rush is on to secure prime real estate in the largest oil field in the United States with little sign that the U.S. economy is slowing as many had expected.

“Our companies share a similar culture and operating philosophy and are headquartered across the street from one another, which should allow for a seamless integration of our two teams," Diamondback Chairman and CEO Travis Stice said in a prepared statement.

Despite broad expectations that it would dip into recession in a turbulent global economy, the U.S. has proven surprisingly resilient, with a red hot job market and economic growth that has surprised almost everyone. The nation’s economy grew at an unexpectedly brisk 3.3% annual pace from October through December.

Shareholders of Diamondback Energy Inc. will own about 60.5% of the combined company, while Endeavor’s equity holders would own approximately 39.5%.

“Diamondback and Endeavor’s assets are highly contiguous and offer opportunities to capture operational and overhead synergies through a combination,” Stifel's Derrick Whitfield said in an analyst note, explaining that the deal will add low-cost inventory to Diamondback's Midland Basin position.

The Diamondback, Endeavor deal confirmed Monday includes approximately 117.3 million shares of Diamondback common stock and $8 billion in cash, and will create a huge operator in the Permian Basin that straddles Texas and New Mexico.

The combined company will be based in Midland, Texas.

The boards of both companies have approved the deal, which is expected to close in the fourth quarter. It also has all of the necessary Endeavor approvals, the companies said.

Diamondback's stock rose nearly 2% before the market open.

Ad Placement 300x100
Ad Placement 300x600

CultureMap Emails are Awesome

ERCOT braces for record-breaking power demand this summer

hot temps, high demand

The Electric Reliability Council of Texas, which manages about 90 percent of the state’s power, is waving a warning flag: The ERCOT grid may set a new record for peak demand this summer.

Based on expectations for a hotter summer this year than last year, ERCOT predicts power demand will hit a peak of more than 92.2 gigawatts this summer — enough power for roughly 18.4 million homes.

“Given the potential for extreme heat combined with significant load growth, ERCOT may surpass its current all-time summer peak,” the organization says in its 2026 summertime forecast.

Further taxing the ERCOT grid are power-hungry data centers and cryptocurrency-mining facilities.

Last year’s peak summer demand for ERCOT reached 83.7 megawatts on Aug. 18, and all-time peak demand of 85.5 gigawatts was recorded on Aug. 10, 2023.

Fortunately, ERCOT believes the grid is in good shape to withstand this summer’s heat: It found a 0.09 percent chance of a grid emergency in June and a 0.21 percent chance in July.

More generation of electricity from solar and wind is helping ERCOT meet stepped-up demand prompted by population growth, and the significant power needs of data centers and cryptocurrency-mining facilities.

About 27 million Texas customers depend on power from ERCOT’s grid.

Texas awards $73M for Houston-area grid resilience project

grid funding

Texas Gov. Gregg Abbott announced millions in funding for energy resilience projects around this state this week, with one major project set to impact the greater Houston area.

As part of the Texas Energy Fund's Outside of ERCOT Grant Program, the state announced a roughly $73 million agreement with the Sam Houston Electric Cooperative to replace and upgrade more than 9,000 electric poles and improve other equipment in Montgomery, Liberty and Hardin counties. The agreement is the first for the fund's Outside of ERCOT Grant Program, which supports state projects outside of the state's largest grid.

The multibillion-dollar Texas Energy Fund aims to "finance the construction, maintenance, and modernization of electric facilities across Texas." It was approved by voters in 2023. Other programs within the fund include the:

  • In-ERCOT Generation Loan Program
  • Completion Bonus Grant Program
  • Texas Backup Power Package Program

“The Texas Energy Fund delivers real results for Texans and strengthens the electric systems that families, businesses, and communities depend on,” Abbott said in a news release. “This grant to Sam Houston Electric Cooperative will replace thousands of vulnerable utility poles to better withstand severe weather and ensure a more reliable and resilient grid in East Texas.”

The Houston-area project, nicknamed Steel Anchor, is expected to be completed by June 2031. According to the release from the governor's office, the Sam Houston Electric Cooperative’s territory is one of the most hurricane-prone service areas in the state. The cooperative serves more than 38,000 Texas consumers

“Over the past decade, Sam Houston EC has strategically replaced poles to improve the strength of its electricity distribution system. This grant will boost the Cooperative’s ongoing grid-hardening and resiliency program,” Doug Turk, CEO of the Sam Houston Electric Cooperative, added in the release.

Following the announcement of the Sam Houston funding, Abbott's office also awarded another $200 million from the Outside of ERCOT Grant Program to upgrade approximately 700 miles of power equipment in Northeast Texas. The equipment is operated by Southwestern Electric Power Company, which serves more than 192,000 Texas consumers. The project will include improvements to 200 circuits, replacing aging copper wire with aluminum alloy conductors and replacing existing utility poles.

Additionally, the state announced its seventh Texas Energy Fund loan agreement for a 570 megawatt natural gas power plant in Sherman, Texas. The 20-year loan of up to $411 million is between the Public Utility Commission of Texas and Rayburn Electric Cooperative and is part of the fund's In-ERCOT Generation Loan Program. Rayburn will build the facility near its existing Rayburn Energy Station 1 in the Texoma region. It will connect to the ERCOT North Load Zone.

“When Texas voters overwhelmingly approved the Texas Energy Fund, they gave us a mandate to secure new, reliable power generation for Texas,” PUCT Chairman Thomas Gleeson added in a release. “The TxEF is delivering on that promise, and Rayburn Electric Cooperative’s new 570 MW power plant is proof. We are ensuring Texas families and businesses have power they can depend on for years to come.”

Solar manufacturer announces massive new facility in Houston area

coming soon

SEG Solar has announced plans to open a new 1.15 million-square-foot solar module facility in Tomball—its third in the Houston area.

The news comes just weeks after the Houston-based solar manufacturer announced its second facility, which will be located in Cypress. It’s expected to open in August.

The latest 4.6-gigawatt facility in Tomball will include an assembly factory and a warehouse. Construction is slated to wrap in March 2027, with commercial panel production planned to begin in May 2027. Once completed, the facility will bring SEG’s annual U.S. module manufacturing capacity to 10.6 gigawatts, according to a news release from the company, one of the largest totals in the country.

The facility will produce heterojunction technology (HJT) modules, which the company says will add to the number of n-type solar panels made in the U.S. HJT modules are known to be more durable and are well suited for hotter climates.

“Designed to support next-generation HJT technology and FEOC-compliant production, the facility ensures reliable, high-efficiency solar solutions,” Raymond Bailey, sales manager at SEG Solar, said in a LinkedIn post. “ Alongside upstream integration in Indonesia and potential U.S. cell manufacturing, we are strengthening supply chain resilience amid evolving trade policies.”

SEG opened its $60 million, 250,000-square-foot facility in Houston in 2024 to house its production workshops, raw material warehouses, administrative offices, finished goods warehouses, and supporting infrastructure. The continued expansion is part of SEG’s long-term goal of becoming one of the largest 100 percent U.S.-owned module manufacturers.