Residents in Montgomery, Liberty and Hardin counties can expect to see power grid improvements in the coming years. Photo via Getty Images

Texas Gov. Gregg Abbott announced millions in funding for energy resilience projects around this state this week, with one major project set to impact the greater Houston area.

As part of the Texas Energy Fund's Outside of ERCOT Grant Program, the state announced a roughly $73 million agreement with the Sam Houston Electric Cooperative to replace and upgrade more than 9,000 electric poles and improve other equipment in Montgomery, Liberty and Hardin counties. The agreement is the first for the fund's Outside of ERCOT Grant Program, which supports state projects outside of the state's largest grid.

The multibillion-dollar Texas Energy Fund aims to "finance the construction, maintenance, and modernization of electric facilities across Texas." It was approved by voters in 2023. Other programs within the fund include the:

  • In-ERCOT Generation Loan Program
  • Completion Bonus Grant Program
  • Texas Backup Power Package Program

“The Texas Energy Fund delivers real results for Texans and strengthens the electric systems that families, businesses, and communities depend on,” Abbott said in a news release. “This grant to Sam Houston Electric Cooperative will replace thousands of vulnerable utility poles to better withstand severe weather and ensure a more reliable and resilient grid in East Texas.”

The Houston-area project, nicknamed Steel Anchor, is expected to be completed by June 2031. According to the release from the governor's office, the Sam Houston Electric Cooperative’s territory is one of the most hurricane-prone service areas in the state. The cooperative serves more than 38,000 Texas consumers

“Over the past decade, Sam Houston EC has strategically replaced poles to improve the strength of its electricity distribution system. This grant will boost the Cooperative’s ongoing grid-hardening and resiliency program,” Doug Turk, CEO of the Sam Houston Electric Cooperative, added in the release.

Following the announcement of the Sam Houston funding, Abbott's office also awarded another $200 million from the Outside of ERCOT Grant Program to upgrade approximately 700 miles of power equipment in Northeast Texas. The equipment is operated by Southwestern Electric Power Company, which serves more than 192,000 Texas consumers. The project will include improvements to 200 circuits, replacing aging copper wire with aluminum alloy conductors and replacing existing utility poles.

Additionally, the state announced its seventh Texas Energy Fund loan agreement for a 570 megawatt natural gas power plant in Sherman, Texas. The 20-year loan of up to $411 million is between the Public Utility Commission of Texas and Rayburn Electric Cooperative and is part of the fund's In-ERCOT Generation Loan Program. Rayburn will build the facility near its existing Rayburn Energy Station 1 in the Texoma region. It will connect to the ERCOT North Load Zone.

“When Texas voters overwhelmingly approved the Texas Energy Fund, they gave us a mandate to secure new, reliable power generation for Texas,” PUCT Chairman Thomas Gleeson added in a release. “The TxEF is delivering on that promise, and Rayburn Electric Cooperative’s new 570 MW power plant is proof. We are ensuring Texas families and businesses have power they can depend on for years to come.”

Ad Placement 300x100
Ad Placement 300x600

CultureMap Emails are Awesome

ERock scores Anthropic deal, sees order backlog soar to $1.7B

power deal

Two months after its $400 million IPO, Houston-based ERock (NYSE: EROC) has landed a power-generator deal with AI powerhouse Anthropic, owner of the Claude platform.

In its Q2 earnings report, ERock says it will provide equipment to Anthropic with a 470-megawatt capacity. ERock specializes in utility-grade, onsite microgrid power systems for data centers and other customers. The company previously did business as Enchanted Rock.

The Anthropic deal adds to ERock’s backlog of about $1.7 billion in orders—a figure representing a 1,000 percent year-over-year jump in backorders thanks in large part to the AI boom. ERock expects most of the backlog to convert to revenue by the end of 2027, said Ian Blakely, the company’s chief financial officer.

Bank of America analyst Ross Fowler says the Anthropic contract boosts confidence in ERock’s ability to secure other major deals, according to Traders Union. The Anthropic deal is ERock’s third major data center contract, with separate Anthropic deals for operations and maintenance services expected to follow, Fowler said.

CEO John Carrington says Anthropic’s order “reinforces the momentum” ERock is witnessing across its customer base.

“We are seeing a lot of interest in Texas. It seems to be the easiest place to get a site set up,” company President Corey Amthor said

In its Q2 earnings release—its first as a public company—ERock also reported:

  • Launching generator-assembly operations at its Hyperion equipment factory in Northwest Houston. The plant will expand ERock’s assembly capabilities to 1.2 gigawatts of capacity by the end of 2026.
  • Starting construction of a $473 million, 366-megawatt El Paso Electric natural-gas-powered plant to supply power for Meta Platforms’ $14 billion, 1,000-acre AI data center campus in El Paso. Meta is the parent company of the Facebook and Instagram social media companies.

“Meta gains access to an operational data center years earlier than may otherwise be possible, while El Paso Electric gains a flexible, low-cost, low-emissions grid asset that can support long-term system reliability,” Carrington said.

Nominate energy trailblazers for Houston Innovation Awards by Aug. 27

Awards Season

Calling all energy innovators: The 2026 Houston Innovation Awards, presented by InnovationMap, return this fall to celebrate the best and brightest in the Houston innovation ecosystem, and that includes those leading the energy transition.

We're asking you to nominate Houston's top innovators and startups for this year's awards.

Nominations are open now through August 27 and can be made on behalf of yourself, your organization, and other influential leaders in the local innovation scene.

The annual awards program recognizes the most innovative individuals and companies in Houston across 10 prestigious categories, including one category specifically for the energy transition.

This year's awards will honor the following categories:

  • Minority-founded Business, honoring an innovative startup founded or co-founded by BIPOC or LGBTQ+ representation.
  • Female-founded Business, honoring an innovative startup founded or co-founded by a woman.
  • Energy Transition Business, honoring an innovative startup providing a solution within renewables, climatetech, clean energy, alternative materials, circular economy, and beyond.
  • Health Tech Business, honoring an innovative startup within the health and medical technology sectors.
  • Deep Tech Business, honoring an innovative startup providing technology solutions based on substantial scientific or engineering challenges, including those in the AI, robotics, and space sectors.
  • Startup of the Year (People's Choice), honoring a startup celebrating a recent milestone or success. The winner will be selected by the community via an interactive voting experience.
  • Scaleup of the Year, honoring an innovative later-stage startup that's recently reached a significant milestone in company growth.
  • Incubator/Accelerator of the Year, honoring a local incubator or accelerator that is championing and fueling the growth of Houston startups.
  • Mentor of the Year, honoring an individual who dedicates their time and expertise to guide and support budding entrepreneurs.
  • Trailblazer, honoring an innovator who's made a lasting impact on the Houston innovation community.

You have three weeks to submit nominees, so don't delay — nominate today at this link or fill out the form below. Qualified nominees will receive a formal application to complete, which will be reviewed by our esteemed panel of judges to determine the finalists and winners.

More announcements about the 2026 Houston Innovation Awards are coming soon. Interested in sponsoring the 2026 Houston Innovation Awards? Please contact sales@innovationmap.com.

Telsa eyes Houston area for $10 billion solar manufacturing plant

under review

Electric vehicle and clean energy company Tesla is considering building a new $10.1 billion solar cell manufacturing facility in Fort Bend County, according to documents filed with the Texas Comptroller’s Office.

If approved, the plant, called Project Sun City, would be located on a 3,050-acre site off FM 762 and FM 1994 in Richmond, Texas. Tesla aims to finish construction in 2028, with the plant being operational by early 2029.

The plant will manufacture photovoltaic (PV) solar cells and modules that can convert sunlight into electricity. PV Magazine reports that the facility is "the largest single manufacturing investment Tesla has proposed on paper."

Advisory and consulting firm Kroll submitted the documents to the Texas Comptroller of Public Accounts and noted if an agreement regarding tax incentives isn't reached, the project will exit Texas.

Tesla has requested credits under the Jobs, Energy, Technology, and Innovation (JETI) Act. The incentive program aims to attract large, capital-intensive economic development projects by lowering the property taxes an entity must pay over 10 years if it meets requirements related to job creation and investment. For example, pharmaceutical giant Bristol Myers Squibb Co. recently announced that its forthcoming $2.3 billion Houston-area manufacturing site is a qualified project under the JETI program.

Kroll predicts that the facility would create 9,712 new full-time jobs, over 1,100 construction jobs and billions of dollars in future property tax revenue, the documents show. Additionally, it says the project will spur $1.1 billion in local business expenditures and that Texas would increase its GDP by approximately $107 billion as a result of the project activities.

Tesla opened its $200 million Megafactory in Brookshire, Texas, last year. The company is continuing its goal to deploy 100 gigawatts of solar manufacturing in the U.S before the end of 2028. According to the U.S. Energy Information Administration, 100 gigawatts is equal to about 8 percent of the country's power grid capacity.