NearStar Fusion team Andrew Case, Chris Faranetta, Douglas Witherspoon, Amit Singh and Marco Luna. Photo courtesy NearStar Fusion.

Houston-based climate tech venture firm Ecosphere Ventures has partnered with Virginia Venture Partners and Virginia Innovation Partnership Corporation’s venture capital program to invest in Virginia-based NearStar Fusion Inc., which develops fusion energy power plants.

NearStar aims to use its proprietary plasma railgun technology to safely and affordably power baseload electricity on and off the power grid through a Magnetized Target Impact Fusion (MTIF) approach, according to a news release from the company.

NearStar’s power plants are designed to retrofit traditional fossil fuel power plants and are expected to serve heavy industry, data centers and military installations.

“Our design is well-suited to retrofit coal-burning power plants and reuse existing infrastructure such as balance of plant and grid connectivity, but I’m also excited about leveraging the existing workforce because you won’t need PhDs in plasma physics to work in our power plant,” Amit Singh, CEO of NearStar Fusion, said in a news release.

NearStar will also conduct experiments at the Texas A&M Hypervelocity Impact Laboratory (HVIL) in Bryan, Texas, on prototype fuel targets and evolving fuel capsule design. The company plans to publish the results of the experiments along with a concept paper this year. NearStar will work with The University of Alabama in Huntsville (UAH) to develop computer performance models for target implosions.

NearStar’s MTIF approach will utilize deuterium, which is a common isotope of hydrogen found in water. The process does not use tritium, which NearStar believes will save customers money.

“While avoiding tritium in our power plant design reduces scientific gain of the fusion process, we believe the vastly reduced system complexity and cost savings of eliminating complicated supply chains, regulatory oversight, and breeding of tritium allows NearStar to operate power plants more profitably and serve more customers worldwide, ”Douglas Witherspoon, NearStar founder and chief scientist, said in a news release.

Houston’s Ecosphere Ventures invests in climate tech and sustainability innovations from pre-seed to late-seed stages in the U.S. Ecosphere also supports first-time entrepreneurs and technical founders.

Ad Placement 300x100
Ad Placement 300x600

CultureMap Emails are Awesome

Feds back Houston-based Grid United's $4B plan to connect U.S. power grids

Powering the Grid

The federal government is backing an electric power line intertie in Wyoming that will double the flow of electricity between the eastern and western grids, the U.S. Department of Energy announced.

Houston-based Grid United’s $4 billion project, backed by a $2.8 billion “conditional” loan from the federal Energy Dominance Financing program, will string high-voltage lines from the Laramie River Station coal-fired power plant outside Wheatland 106 miles west to the Aeolus substation near Medicine Bow.

The bidirectional connection allows for system operators and utilities to flow electricity either direction, “strengthening the grid and giving operators new tools to respond to surges in demand or outages,” Office of Energy Dominance Financing Director Gregory Beard said in a press conference.

“The bridging of these neighboring systems with a transmission line,” Beard added, “provides more reliable energy flows, lowers ratepayer electricity bills and stabilizes the grid, especially during extreme weather conditions.”

Wyoming sits in the western grid, and the edge of the two grids essentially trace Wyoming’s eastern border. Laramie River Station is one of the few power plants with access to both grids, likely making it an ideal location to beef up a connection between the two systems, Wyoming Energy Authority Director of Energy Market Development John Jenks told WyoFile.

“It adds flexibility to energy being dispatched onto the grid,” Jenks said. “We can send electricity east if we have excess electricity, or we can take it from the east. For Wyoming electricity producers, it’s expanding the markets to dispatch and sell their electricity.”

Though the project does not rely on building additional electrical generation capacity, it will certainly enable new power projects, Beard said. “There are certainly growing electricity demands nationwide and on both sides of this interconnect. So this (helps) solve a current problem.”

The three-year construction of the intertie is expected to begin in 2030. Once completed, it is estimated to save ratepayers in Wyoming and 17 other states a combined $39 billion in avoided costs over the next 30 years, according to the DOE. Beard underscored the estimated savings, crediting President Donald Trump for his “energy dominance” initiatives, including his Strengthening the Reliability and Security of the U.S. Electric Grid executive order.

However, Jenks cautioned that the intertie won’t necessarily lower rates for Wyoming customers. It could avoid occasional price spikes, which are passed on to customers, by providing flexibility to ship available power to where it’s needed during times of imbalance.

“It can dispatch generation resources more efficiently, which should — in theory — lower electricity bills,” he said. “It might be a stretch to say it will (lower monthly bills), but that’s the theory behind it.”

The Platte County to Carbon County route consists of about 90% state and federally owned land, according to Beard, and the project may receive fast-track permitting.

“This is not going to have issues around land acquisition or condemning properties to put the transmission line up,” he said. “There will not be protests in the street over condemning land to get this line up.”

Grid United says it’s still working with tribal nations and landowners to finalize the route.

“The route will remain proposed until it receives approval from county, state and federal regulatory bodies,” according to the company’s Wyoming Intertie website. “Construction will commence after Wyoming Intertie secures land rights and regulatory approvals.”

Houston’s Giga Energy lands $1B lease at AI data center

A Houston manufacturer of modular data centers has secured a $1 billion customer for its latest project.

Giga Energy signed a 10-year lease with an unidentified U.S. company that provides AI cloud computing services. The lease is for Project Clay, a 60-megawatt AI data center that Giga Energy is building in Hunt County, about 55 miles northeast of Dallas. Giga Energy will develop, own and operate the facility.

Construction at the 30-acre site began in July. Operations are set to start next spring.

Much of the facility isn’t actually being built in Hunt County. Giga Energy is prefabricating significant portions, then shipping components to Hunt County for final assembly. The company operates factories in Houston and Long Beach, California.

The company says this approach shortens construction time and reduces disruption to local roads, housing and traffic. As such, communities can start seeing economic benefits more quickly, Giga Energy says.

Project Clay is the first site to use GigaBase, Giga Energy’s new data-center model. GigaBase addresses some of the main objections to data centers: long build times, heavy consumption of water and extra electrical loads for local utilities.

Power and water

At full capacity, Project Clay would provide enough electricity to power about 15,000 Texas households at peak demand on the state’s main power grid. The Electric Reliability Council of Texas (ERCOT) manages that grid, which supplies about 90 percent of Texas’ electricity.

To keep power demand from competing with local users, Giga Energy plans to build new electrical infrastructure that uses idle capacity on existing lines, not the distribution capacity that serves homes and businesses in the area.

Giga Energy will cool its servers with a closed-loop system that doesn’t depend on the local water supply, avoiding the water-intensive evaporative cooling many data centers use. The only local water at the site will be used for restrooms and sinks.

The company says these steps line up with standards Texas Governor-elect Gina Hinojosa has proposed for data centers, such as covering their own power costs and cooling their facilities with water-efficient technology.

“This is exactly the kind of AI infrastructure Texas needs,” Brent Whitehead, Giga Energy’s co-founder and president, said in a news release. “Communities shouldn’t have to choose between economic growth and protecting local resources.”

Jobs and tax revenue

Giga Energy expects Project Clay to employ about 300 people during construction. Once the data center is running, it will have 24 full-time employees earning anticipated annual salaries of $116,000 to $180,000. The company also expects the project to generate millions of dollars of annual tax revenue in Hunt County.

Whitehead said that with Project Clay, Hunt County is getting “an economic engine that will support schools, public services, and future growth for generations.”

UH researcher examines the future of carbon capture projects in Texas

carbon paper

University of Houston Law Center research scholar Qaraman Hasan is tackling how Texas can advance carbon capture projects while simultaneously addressing public concerns and environmental issues in a new article in the Harvard Environmental Law Review.

The CCS process includes capturing carbon dioxide emissions and storing them underground with the goal of preventing them from influencing the environment and adding to pollution. In November 2025, Texas received federal approval to take over permitting authority, or primacy, of Class VI wells. Class VI wells insert CO2 into deep rock formations.

In his article “From Federal Permitting to Primacy: Balancing Environmental Protection and Climate Policy Objectives,” Hasan looks at how state and federal policy around CCS projects in Texas can be balanced with climate policy objectives, environmental protections, and community input. Currently, Hasan teaches environmental and energy law courses at the UH Law Center.

“I hope the article expands the conversation,” Hasan said in a news release. “We have the technology and the legal tools. What remains is better regulation and more constructive dialogue at the state and federal levels, so we can reduce emissions in the states and cities most burdened by pollution and store carbon securely.”

Ultimately, Hasan argues that the goal should be to streamline permitting while supporting industry development and ensuring communities feel safe and have their voices heard. The article highlights the importance of carbon capture and removal for greener climate initiatives, utilizing a Texas case study to conduct his analysis on primacy. It also considers the future sustainability and seismic ramifications of underground storage space, federal permitting processes, and how the public, agencies and AI tools can be used to approach applications.

The Intergovernmental Panel on Climate Change (IPCC) recommended CCS as an option for climate change mitigation over 20 years ago. According to the article, the Department of Energy says that reaching net-zero carbon emissions in the United States would require capturing and sequestering 400 million to 1,800 million tonnes each year until 2050.

The Biden administration previously established a goal of achieving net-zero emissions through several key strategies, including expanding carbon removal and decarbonizing electricity. Hasan notes that environmental regulations are often cited as barriers to low-carbon economy projects, but argues that effective legislation can help advance these projects without overlooking environmental impacts. He also acknowledges that permitting requirements can create initial delays.

“CCS is a significant tool for reducing emissions and protecting the environment, and it should not be dismissed out of hand,” Hasan added in the news release. “It is also one of the few climate areas with bipartisan support, which matters. With that support, it makes sense to give states the authority to regulate it when they meet federal standards, as long as safeguards are in place.”

Read Hasan’s full article here.