Venus Aerospace has reached a major milestone. Courtesy photo

Houston-based Venus Aerospace successfully completed the first U.S. flight test of its proprietary engine at a demonstration at Spaceport America in New Mexico.

Venus’ next-generation rotating detonation rocket engine (RDRE) is supported by a $155,908 federal Small Business Innovation Research (SBIR) grant from NASA and aims to enable vehicles to travel four to six times the speed of sound from a conventional runway. The recent flight test was the first of an American-developed engine of its kind.

"With this flight test, Venus Aerospace is transforming a decades-old engineering challenge into an operational reality,” Thomas d'Halluin, managing partner at Airbus Ventures, an investor in Venus, said in a news release. “Getting a rotating detonation engine integrated, launch-ready, and validated under real conditions is no small feat. Venus has shown an extraordinary ability to translate deep technical insight into hardware progress, and we're proud to support their bold approach in their attempt to unlock the hypersonic economy and forge the future of propulsion."

Venus’ RDRE operates through supersonic shockwaves, called detonations, that generate more power with less fuel. It is designed to be affordable and scalable for defense and commercial systems.

The RDRE is also engineered to work with the company's air-breathing detonation ramjet, the VDR2, which helps enable aircraft to take off from a runway and transition to speeds exceeding Mach 6. Venus plans for full-scale propulsion testing and vehicle integration of this system. Venus’ ultimate goal is to develop a Mach 4 reusable passenger aircraft, known as the Stargazer M4.

"This milestone proves our engine works outside the lab, under real flight conditions," Andrew Duggleby, Venus co-founder and chief technology officer, said in the release. "Rotating detonation has been a long-sought gain in performance. Venus' RDRE solved the last but critical steps to harness the theoretical benefits of pressure gain combustion. We've built an engine that not only runs, but runs reliably and efficiently—and that's what makes it scalable. This is the foundation we need that, combined with a ramjet, completes the system from take-off to sustained hypersonic flight."

The hypersonic market is projected to surpass $12 billion by 2030, according to Venus.

"This is the moment we've been working toward for five years," Sassie Duggleby, CEO and co-founder of Venus Aerospace, added. "We've proven that this technology works—not just in simulations or the lab, but in the air. With this milestone, we're one step closer to making high-speed flight accessible, affordable, and sustainable."

---

This article originally appeared on InnovationMap.com.

Ad Placement 300x100
Ad Placement 300x600

CultureMap Emails are Awesome

Chevron and ExxonMobil feed the need for gas-powered data centers

data center demand

Two of the Houston area’s oil and gas goliaths, Chevron and ExxonMobil, are duking it out in the emerging market for natural gas-powered data centers—centers that would ease the burden on electric grids.

Chevron said it’s negotiating with an unnamed company to supply natural gas-generated power for the data center industry, whose energy consumption is soaring mostly due to AI. The power would come from a 2.5-gigawatt plant that Chevron plans to build in West Texas. The company says the plant could eventually accommodate 5 gigawatts of power generation.

The Chevron plant is expected to come online in 2027. A final decision on investing in the plant will be made next year, Jeff Gustavson, vice president of Chevron’s low-carbon energy business, said at a recent gathering for investors.

“Demand for gas is expected to grow even faster than for oil, including the critical role gas will play [in] providing the energy backbone for data centers and advanced computing,” Gustavson said.

In January, the company’s Chevron USA subsidiary unveiled a partnership with investment firm Engine No. 1 and energy equipment manufacturer GE Vernova to develop large-scale natural gas power plants co-located with data centers.

The plants will feature behind-the-meter energy generation and storage systems on the customer side of the electricity meter, meaning they supply power directly to a customer without being connected to an electric grid. The venture is expected to start delivering power by the end of 2027.

Chevron rival ExxonMobil is focusing on data centers in a slightly different way.

ExxonMobil Chairman and CEO Darren Woods said the company aims to enable the capture of more than 90 percent of emissions from data centers. The company would achieve this by building natural gas plants that incorporate carbon capture and storage technology. These plants would “bring a unique advantage” to the power market for data centers, Woods said.

“In the near to medium term, we are probably the only realistic game in town to accomplish that,” he said during ExxonMobil’s third-quarter earnings call. “I think we can do it pretty effectively.”

Woods said ExxonMobil is in advanced talks with hyperscalers, or large-scale providers of cloud computing services, to equip their data centers with low-carbon energy.

“We will see what gets translated into actual contracts and then into construction,” he said.

Houston company wins contract to operate South Texas wind farm

wind deal

Houston-based Consolidated Asset Management Services (CAMS), which provides services for owners of energy infrastructure, has added the owner of a South Texas wind power project to its customer list.

The new customer, InfraRed Capital Partners, owns the 202-megawatt Mesteño Wind Project in the Rio Grande Valley. InfraRed bought the wind farm from Charlotte, North Carolina-based power provider Duke Energy in 2024. CAMS will provide asset management, remote operations, maintenance, compliance and IT services for the Mesteño project.

Mesteño began generating power in 2019. The wind farm is connected to the electric grid operated by the Energy Reliability Council of Texas (ERCOT).

With the addition of Mesteño, CAMS now manages wind energy projects with generation capacity of more than 2,500 megawatts.

Mesteño features one of the tallest wind turbine installations in the U.S., with towers reaching 590.5 feet. Located near Rio Grande City, the project produces enough clean energy to power about 60,000 average homes.

In June, CAMS was named to the Financial Times’ list of the 300 fastest-growing companies in North and South America. The company’s revenue grew more than 70 percent from 2020 to 2023.

Earlier this year, CAMS jumped into the super-hot data center sector with the rollout of services designed to help deliver reliable, cost-effective power to energy-hungry data centers. The initiative focuses on supplying renewable energy and natural gas.

Google's $40B investment in Texas data centers includes energy infrastructure

The future of data

Google is investing a huge chunk of money in Texas: According to a release, the company will invest $40 billion on cloud and artificial intelligence (AI) infrastructure, with the development of new data centers in Armstrong and Haskell counties.

The company announced its intentions at a meeting on November 14 attended by federal, state, and local leaders including Gov. Greg Abbott who called it "a Texas-sized investment."

Google will open two new data center campuses in Haskell County and a data center campus in Armstrong County.

Additionally, the first building at the company’s Red Oak campus in Ellis County is now operational. Google is continuing to invest in its existing Midlothian campus and Dallas cloud region, which are part of the company’s global network of 42 cloud regions that deliver high-performance, low-latency services that businesses and organizations use to build and scale their own AI-powered solutions.

Energy demands

Google is committed to responsibly growing its infrastructure by bringing new energy resources onto the grid, paying for costs associated with its operations, and supporting community energy efficiency initiatives.

One of the new Haskell data centers will be co-located with — or built directly alongside — a new solar and battery energy storage plant, creating the first industrial park to be developed through Google’s partnership with Intersect and TPG Rise Climate announced last year.

Google has contracted to add more than 6,200 megawatts (MW) of net new energy generation and capacity to the Texas electricity grid through power purchase agreements (PPAs) with energy developers such as AES Corporation, Enel North America, Intersect, Clearway, ENGIE, SB Energy, Ørsted, and X-Elio.

Water demands

Google’s three new facilities in Armstrong and Haskell counties will use air-cooling technology, limiting water use to site operations like kitchens. The company is also contributing $2.6 million to help Texas Water Trade create and enhance up to 1,000 acres of wetlands along the Trinity-San Jacinto Estuary. Google is also sponsoring a regenerative agriculture program with Indigo Ag in the Dallas-Fort Worth area and an irrigation efficiency project with N-Drip in the Texas High Plains.

In addition to the data centers, Google is committing $7 million in grants to support AI-related initiatives in healthcare, energy, and education across the state. This includes helping CareMessage enhance rural healthcare access; enabling the University of Texas at Austin and Texas Tech University to address energy challenges that will arise with AI, and expanding AI training for Texas educators and students through support to Houston City College.

---

This article originally appeared on CultureMap.com.