The U.S. National Highway Traffic Safety Administration has raised concerns about Tesla's public messaging on its "Full Self-Driving" system. Photo via tesla.com

The U.S. government's highway safety agency says Tesla is telling drivers in public statements that its vehicles can drive themselves, conflicting with owners manuals and briefings with the agency saying the electric vehicles need human supervision.

The National Highway Traffic Safety Administration is asking the company to “revisit its communications” to make sure messages are consistent with user instructions.

The request came in a May email to the company from Gregory Magno, a division chief with the agency's Office of Defects Investigation. It was attached to a letter seeking information on a probe into crashes involving Tesla's “Full Self-Driving” system in low-visibility conditions. The letter was posted Friday on the agency's website.

The agency began the investigation in October after getting reports of four crashes involving “Full Self-Driving" when Teslas encountered sun glare, fog and airborne dust. An Arizona pedestrian was killed in one of the crashes.

Critics, including Transportation Secretary Pete Buttigieg, have long accused Tesla of using deceptive names for its partially automated driving systems, including “Full Self-Driving” and “Autopilot,” both of which have been viewed by owners as fully autonomous.

The letter and email raise further questions about whether Full Self-Driving will be ready for use without human drivers on public roads, as Tesla CEO Elon Musk has predicted. Much of Tesla's stock valuation hinges on the company deploying a fleet of autonomous robotaxis.

Musk, who has promised autonomous vehicles before, said the company plans to have autonomous Models Y and 3 running without human drivers next year. Robotaxis without steering wheels would be available in 2026 starting in California and Texas, he said.

A message was sent Friday seeking comment from Tesla.

In the email, Magno writes that Tesla briefed the agency in April on an offer of a free trial of “Full Self-Driving” and emphasized that the owner's manual, user interface and a YouTube video tell humans that they have to remain vigilant and in full control of their vehicles.

But Magno cited seven posts or reposts by Tesla's account on X, the social media platform owned by Musk, that Magno said indicated that Full Self-Driving is capable of driving itself.

“Tesla's X account has reposted or endorsed postings that exhibit disengaged driver behavior,” Magno wrote. “We believe that Tesla's postings conflict with its stated messaging that the driver is to maintain continued control over the dynamic driving task."

The postings may encourage drivers to see Full Self-Driving, which now has the word “supervised” next to it in Tesla materials, to view the system as a “chauffeur or robotaxi rather than a partial automation/driver assist system that requires persistent attention and intermittent intervention by the driver,” Magno wrote.

On April 11, for instance, Tesla reposted a story about a man who used Full Self-Driving to travel 13 miles (21 kilometers) from his home to an emergency room during a heart attack just after the free trial began on April 1. A version of Full Self-Driving helped the owner "get to the hospital when he needed immediate medical attention,” the post said.

In addition, Tesla says on its website that use of Full Self-Driving and Autopilot without human supervision depends on “achieving reliability" and regulatory approval, Magno wrote. But the statement is accompanied by a video of a man driving on local roads with his hands on his knees, with a statement that, “The person in the driver's seat is only there for legal reasons. He is not doing anything. The car is driving itself,” the email said.

In the letter seeking information on driving in low-visibility conditions, Magno wrote that the investigation will focus on the system's ability to perform in low-visibility conditions caused by “relatively common traffic occurrences.”

Drivers, he wrote, may not be told by the car that they should decide where Full Self-Driving can safely operate or fully understand the capabilities of the system.

“This investigation will consider the adequacy of feedback or information the system provides to drivers to enable them to make a decision in real time when the capability of the system has been exceeded,” Magno wrote.

The letter asks Tesla to describe all visual or audio warnings that drivers get that the system “is unable to detect and respond to any reduced visibility condition.”

The agency gave Tesla until Dec. 18 to respond to the letter, but the company can ask for an extension.

That means the investigation is unlikely to be finished by the time President-elect Donald Trump takes office in January, and Trump has said he would put Musk in charge of a government efficiency commission to audit agencies and eliminate fraud. Musk spent at least $119 million in a campaign to get Trump elected, and Trump has spoken against government regulations.

Auto safety advocates fear that if Musk gains some control over NHTSA, the Full Self-Driving and other investigations into Tesla could be derailed.

Musk even floated the idea of him helping to develop national safety standards for self-driving vehicles.

“Of course the fox wants to build the henhouse,” said Michael Brooks, executive director of the Center for Auto Safety, a nonprofit watchdog group.

He added that he can't think of anyone who would agree that a business mogul should have direct involvement in regulations that affect the mogul’s companies.

“That’s a huge problem for democracy, really,” Brooks said.

Ad Placement 300x100
Ad Placement 300x600

CultureMap Emails are Awesome

Chevron eyes $7B Texas power plant for Microsoft data center campus

power deal

Software giant Microsoft is negotiating exclusively with Houston-based oil and gas titan Chevron and investment firm Engine No. 1 about the development of a $7 billion power plant in West Texas that would supply electricity for a Microsoft data center campus.

The proposed natural-gas-fired plant initially would generate 2,500 megawatts of electricity, Bloomberg reports. The plant would be built near Pecos, a Permian Basin city, in an area where Microsoft plans to build a 2,500-megawatt data center campus on a 7,000-acre site.

A deal with Microsoft would secure a long-term customer for the plant’s output and help finance its construction, Bloomberg says. The project, expected to be producing power by 2030, still requires tax and environmental approvals as well an agreement to terms among Chevron, Engine No. 1, and Microsoft.

In a statement issued after Bloomberg reported the news, Chevron acknowledged it was in exclusive talks with Engine No. 1 and Microsoft, but the oil and gas company offered no details.

Chevron says the proposed plant “reflects an emerging shift in how power for AI is being developed, bringing energy supply closer to demand through co-located, behind-the-meter generation to deliver reliability while helping avoid added strain on regional electricity systems. It pairs sustained, always-on demand from advanced computing with proven capability to design, build, and operate large-scale energy infrastructure.”

Development of gas-powered electrical plants for AI data centers represents a new—and potentially lucrative— business line for Chevron. In 2025, Chevron, Engine No. 1 and GE Vernova announced a partnership to produce natural gas for AI data centers in the U.S.

Chevron’s collaboration with Engine No. 1 has already secured an order for seven large natural gas turbines from GE Vernova, according to Bloomberg.

“Energy is the key to America’s AI dominance,” Chris James, founder and chief investment officer of Engine No. 1, said last year. “By using abundant domestic natural gas to generate electricity directly connected to data centers, we can secure AI leadership, drive productivity gains across our economy, and restore America’s standing as an industrial superpower.”

8 CERAWeek 2026 takeaways from a new Houston energy leader

guest column

My first CERAWeek was a blur.

Having top energy executives, policymakers, and technologists all gathered in Houston—over 11,000 of them this year—was both overwhelming and energizing. The theme was “Convergence and Competition: Energy, Technology, and Geopolitics,” and walking through the George R. Brown Convention Center, it was immediately clear that this was no ordinary industry conference.

As a first-timer with a Greentown Labs lens, here’s what really stuck with me.

Disruption is the new normal

CERAWeek 2026 was set against the backdrop of conflict in the Middle East, the continued race to power AI, and a clear throughline: disruption is increasingly the new normal. You could feel it in every hallway conversation. The ongoing conflict in the Middle East, specifically Iran’s attacks on Qatar’s Ras Laffan facility and the closure of the Strait of Hormuz, affected roughly 20% of the world’s liquified natural gas supply, and that was woven into nearly every conversation throughout the week.

Secretary of Energy Chris Wright opened the conference with “Energy is life,” then quickly turned to natural gas. “America’s superpower is natural gas,” he said, pointing to its role in industry, heat, electricity, fertilizer, exports, and leading AI and manufacturing. That set the tone early and it never really shifted.

AI is still everywhere, but the conversation has shifted

No surprise that AI dominated the agenda. But what struck me as a first-timer was how much the conversation had matured. The AI discussion has moved from general enthusiasm to a much more practical focus on real use cases and measurable outcomes.

NVIDIA, Anthropic, and CyrusOne joined the established tech presences of Microsoft, Google, and AWS, occupying the Innovation Agora’s new AI Hub, which displaced the hydrogen hub from prior years. That detail alone tells you something about where the energy conversation has shifted. Annual global investment in data centers reached $771 billion in 2025, nearly on par with oil and gas ($835 billion) and renewable energy ($798 billion). We are not talking about a niche technology story anymore. This is a capital story, an infrastructure story, and an energy story all at once.

The prevailing tone was uncertain; the gap between what is being announced and what can actually be delivered was the subtext of almost every conversation. Transmission takes over a decade to build. The new generation takes five to nine years. AI infrastructure moves on three-to-five-year timelines. The math doesn’t work yet, and everyone is aware.

Pitch competitions still draw crowds

The Energy Venture Day and Pitch Competition at the McKinney Balcony was one of my favorite events of the week. Seeing Greentown members on that stage never gets old, but what really energized me was the broader mix: students, new founders, and veteran entrepreneurs in one space, all talking about how what they’re building is going to impact the world. S&P Global launched the NextGen cohort with 100+ graduate students from around the country getting a front-row seat to the energy sector.

Geothermal may have stolen the show

If I had to pick the most surprising theme of my first CERAWeek, it was geothermal. It drew the most consistent endorsement of the week, with Department of Energy representatives, oil and gas majors, and operators broadly aligned on its potential. Project InnerSpace hosted a dedicated Geothermal House for the first time, launching a standardized resource classification framework with the Society of Petroleum Engineers and an XPRIZE collaboration targeting surface-plant supply chain breakthroughs. For a sector that has lived in the shadows of wind and solar for years, CERAWeek 2026 was geothermal’s time to shine.

Wow, was I impressed with Melanie Nakagawa

Melanie Nakagawa, chief sustainability officer at Microsoft, delivered an impressive keynote during her fireside chat with Brad Burke. Her depth of experience, from the U.S. Department of State and venture capital to her current role at Microsoft, was matched only by her calm, hopeful demeanor. Leaders like her at the helm of climate action inspire genuine confidence in the future.

What about hydrogen?

Hydrogen was notably absent from the main stage. The AI Hub in the Innovation Agora displaced the hydrogen hub that had been a fixture in prior years. Seems like hydrogen still plays a role, but not as quickly or broadly as hoped. Blue hydrogen is moving forward cautiously. It wasn’t gone from the conversation entirely, but it no longer commands the room.

The label problem isn’t going away

Politics continues to polarize the industry. Climatetech, sustainability, cleantech — some labels carry broad objectives, others have become tribal signals. “Energy transition” for some means a replacement of fossil fuels; for others, it means an evolution across multiple dimensions simultaneously. CERAWeek 2026 showed an industry increasingly focused not on feel-good narratives about the future of energy, but on the harder questions of security, buildout, reliability, affordability, and competitiveness. A pragmatic shift may be the best answer to the label problem.

Collaboration isn’t optional—it’s strategic

The energy transition is no longer primarily an environmental story. It has become a technology and national competitiveness story. The problems are too big for any one company, sector, or country to solve alone. From incubators and investors to utilities and hyperscalers, the message was consistent all week: move together or we don’t move. S&P Global introduced “The Bridge,” a new venue specifically for energy-tech crossover conversations: a small but meaningful signal that even the conference organizers recognize that collaboration will get us further.

The scale and the energy in the room (pun intended) are what stood out most from my first CERAWeek. The industry knows what needs to get built. The question now is whether we can work together to build it fast enough.

See you next year, CERAWeek.

---

Kelsey Kearns is director of Greentown Houston with more than a decade of experience in the technology sector. She served as director of community strategy for Greentown Houston from September 2025 to February 2026. Before that, she was director of business development for Howdy.com.

Houston nuclear startup launches at CERAWeek, plans Texas facility

going nuclear

A new nuclear energy startup launched last month during CERAWeek in the Bayou City.

FluxPoint Energy, the new Houston- and McLean, Virginia-based company, plans to develop the nation’s first new uranium conversion facility in more than 70 years, an effort CEO and founder Mike Chilton says is critical to unlocking the next phase of nuclear energy growth.

"Policymakers, utilities, and developers increasingly point to fuel availability as a limiting factor for America's nuclear reactors—both present and future," Chilton said in a news release. "Uranium conversion has become an unacceptable chokepoint in a global supply chain still dominated by foreign providers."

Chilton has held leadership roles at Pegasus-Global Holdings and GE Verona Hitachi Global Nuclear Fuels. Rodrigo Gonzalez Arbizu serves as COO and Christopher J. Rimel as chief of staff. The Board of Advisors includes energy leaders, including Jeff Lyash, John Sharp, Jane Stricker, Jennifer Skylakos, Leo Weitzenhoff and Jay Wileman.

FluxPoint’s planned facility will convert uranium oxide into uranium hexafluoride (UF6). Although FluxPoit’s new facility is still far off, the company announced it had secured a site and completed both market and feasibility studies. The specific area has not been revealed, only that it will be in Texas.

Discussions at CERAWeek revolved around securing reliable sources of uranium.

Nuclear energy production has been stagnant or even in slight decline since the 1990s. Concerns about nuclear waste and safety, as well as prohibitive costs, have kept new plants from being built, while the widespread availability of cheap natural gas has made investing in nuclear power less profitable. Many see the technology as dangerous and outdated.

However, as energy crises become more common, companies like FluxPoint are looking to restart the nuclear energy sector. The industry got a boost under the Biden Administration thanks to the Inflation Reduction Act, which set goals of adding 35 gigawatts of new capacity by 2035.

Chilton participated in a panel on the best ways to ensure American nuclear plants have access to uranium, most of which is not mined in the United States.

"America cannot lead in nuclear energy while relying on foreign-controlled fuel processing," Chilton added. "FluxPoint was created to restore a critical piece of our nation's energy infrastructure—ensuring that U.S. reactors have access to a secure, domestic fuel supply. This is about energy security, economic strength, and global leadership."