Houston-based Clean Energy Services will operate as a subsidiary of FlexGen. Photo via flexgen.com

A North Carolina company has acquired Houston-based Clean Energy Services, a provider of services for battery energy storage systems and utility-scale solar, for an undisclosed amount.

The buyer is Durham, North Carolina-based FlexGen Power Systems, a provider of battery energy storage software and services.

Clean Energy Services (CES), whose offices are at the Ion, will operate as a subsidiary of FlexGen. Existing CES customers will continue to receive services from CES without disruption or change, FlexGen says.

“Demand for reliable, high-performance power is accelerating, and customers need partners who can deliver at scale,” Kelcy Pegler, CEO of FlexGen, said in a news release. “The addition of CES strengthens our service platform and reinforces our leadership in energy storage technology.”

Ahmad Atwan and Constantine Triantafyllides co-founded CES in 2022. As a startup, CES had raised $8 million in venture capital, according to PitchBook.

“CES has achieved a market leadership position in battery storage services by focusing on reliable speed of service delivery and optimizing asset performance,” Atwan, the company’s CEO, added the release. “FlexGen and CES have been strong partners for years, and this transaction enables us to deliver more robust solutions across a complementary set of customers and markets.”

CES will continue to operate its remote operations center in Houston for over 1 gigawatt of solar assets and 4.5 gigawatt-hours of battery assets, while FlexGen will maintain its remote operations center in Durham.

SMT Energy is expected to bring a new battery storage facility online next year to support the ERCOT grid. Photo via Getty Images

$135 million in funding secured for new Houston battery storage facility

battery expansion

Boulder, Colorado-based SMT Energy has secured $135 million in funding for a 160-megawatt battery energy storage facility, dubbed SMT Houston IV, according to an announcement.

The new facility will work to support the ERCOT grid by providing access to stored energy. The project is expected to be online by 2026 and store and dispatch enough electricity to power 8,800 homes in Texas annually.

Macquarie and KeyBanc Capital Markets were joint lead arrangers in a $100 million project financing facility. Macquarie's Commodities and Global Markets business will also provide a preferred equity investment and are mandated to sell the project's investment tax credits of approximately $62 million, according to SMT. KeyBanc will also act as a financial advisor to SMT.

North Carolina-based battery energy storage integrator FlexGen Power Systems will obtain equipment for the project. The project will also use FlexGen's energy management system software. The software provides site integration, site control and advanced analytics insights to maximize the availability and operating ranges of battery energy storage assets.

"FlexGen is proud to partner with SMT Energy on the deployment of the SMT Houston IV project, which will deliver critical services to the dynamic ERCOT power grid," Jason Abiecunas, Executive Vice President of Business Development with FlexGen said in the release.

In 2023, SMT Energy and joint venture partner SUSI Partners announced plans to add 10 battery storage projects to Texas, doubling capacity from 100 megawatts to 200 megawatts in the Houston and Dallas areas. SMT has a 2 gigawatt per hour pipeline of battery energy storage projects in ERCOT and Southwest Power Pool targeted for commercial operation by 2030, according to the release.

Ad Placement 300x100
Ad Placement 300x600

CultureMap Emails are Awesome

New research reveals what really drives data center location decisions

Guest Column

Recent power outages and the surge in AI-driven computing have made data center siting decisions more consequential than ever, especially as energy and water constraints tighten. Communities invest public dollars on the promise of jobs and growth, while firms weigh long-term commitments to land, power and connectivity.

Against that evolving backdrop, a critical question comes into focus: Where do data centers get built — and what actually drives those decisions?

A new study by Tommy Pan Fang (Rice Business) and Shane Greenstein (Harvard Business School) provides the first large-scale statistical analysis of data center location strategies across the United States. It offers policymakers and firms a clearer starting point for understanding how different types of data centers respond to economic and strategic incentives.

Published in the journal Strategy Science, the study examines two major types of infrastructure: third-party colocation centers that lease server space to multiple firms, and hyperscale cloud centers owned by providers like Amazon, Google and Microsoft.

Key takeaways:

  • Third-party colocation centers are physical facilities in close proximity to firms that use them, while cloud providers operate large data centers from a distance and sell access to virtualized computing resources as on‑demand services over the internet.
  • Hospitals and financial firms often require urban third-party centers for low latency and regulatory compliance, while batch processing and many AI workloads can operate more efficiently from lower-cost cloud hubs.
  • For policymakers trying to attract data centers, access to reliable power, water and high-capacity internet matter more than tax incentives.

What are the two main data center location strategies?

The study draws on pre-pandemic data from 2018 and 2019, a period of relative geographic stability in supply and demand. This window gives researchers a clean baseline before remote work, AI demand and new infrastructure pressures began reshaping internet traffic patterns.

The findings show that data centers follow a bifurcated geography:

  • Third-party centers cluster in dense urban markets, where buyers prioritize proximity to customers despite higher land and operating costs.
  • Cloud providers, by contrast, concentrate massive sites in a small number of lower-density regions, where electricity, land and construction are cheaper and economies of scale are easier to achieve.

Third-party data centers, in other words, follow demand. They locate in urban markets where firms in finance, healthcare and IT value low latency, secure storage, and compliance with regulatory standards.

Using county-level data, the researchers modeled how population density, industry mix and operating costs predict where new centers enter. Every U.S. metro with more than 700,000 residents had at least one third-party provider, while many mid-sized cities had none.

Map of data centers

This pattern challenges common assumptions. Third-party facilities are more distributed across urban America than prevailing narratives suggest.

“For industries where speed is everything, being too far from the physical infrastructure can meaningfully affect performance and risk,” Pan Fang says. “Proximity isn’t optional for sectors that can’t absorb delay.”

In critical operations, even slight pauses can have real consequences. For hospital systems, lag can affect performance and risk exposure. And in high-frequency trading, milliseconds can determine whether value is captured or lost in a transaction.

Why does distance matter for cloud data center costs?

For cloud providers, the picture looks very different. Their decisions follow a logic shaped primarily by cost and scale. Because cloud services can be delivered from afar, firms tend to build enormous sites in low-density regions where power is cheap and land is abundant.

These facilities can draw hundreds of megawatts of electricity and operate with far fewer employees than urban centers. “The cloud can serve almost anywhere,” Pan Fang says, “so location is a question of cost before geography.”

The study finds that cloud infrastructure clusters around network backbones and energy economics, not talent pools. Well-known hubs like Ashburn, Virginia — often called “Data Center Alley” — reflect this logic, having benefited from early network infrastructure that made them natural convergence points for digital traffic.

Local governments often try to lure data centers with tax incentives, betting they will create high-tech jobs. But the study suggests other factors matter more to cloud providers, including construction costs, network connectivity and access to reliable, affordable electricity.

When cloud centers need a local presence, distance can sometimes become a constraint. Providers often address this by working alongside third-party operators. “Third-party centers can complement cloud firms when they need a foothold closer to customers,” Pan Fang says.

That hybrid pattern — massive regional hubs complementing strategic colocation — may define the next phase of data center growth.

Looking ahead, shifts in remote work, climate resilience, energy prices and AI-driven computing may reshape where new facilities go. Some workloads may move closer to users, while others may consolidate into large rural hubs. Emerging data-sovereignty rules could also redirect investment beyond the United States.

“The cloud feels weightless,” Pan Fang says, “but it rests on real choices about land, power and proximity.”

---

This article originally appeared on Rice Business Wisdom. Written by Scott Pett. Pan Fang and Greenstein (2025). “Where the Cloud Rests: The Economic Geography of Data Centers,” Strategy Science.

ERock scores Anthropic deal, sees order backlog soar to $1.7B

power deal

Two months after its $400 million IPO, Houston-based ERock (NYSE: EROC) has landed a power-generator deal with AI powerhouse Anthropic, owner of the Claude platform.

In its Q2 earnings report, ERock says it will provide equipment to Anthropic with a 470-megawatt capacity. ERock specializes in utility-grade, onsite microgrid power systems for data centers and other customers. The company previously did business as Enchanted Rock.

The Anthropic deal adds to ERock’s backlog of about $1.7 billion in orders—a figure representing a 1,000 percent year-over-year jump in backorders thanks in large part to the AI boom. ERock expects most of the backlog to convert to revenue by the end of 2027, said Ian Blakely, the company’s chief financial officer.

Bank of America analyst Ross Fowler says the Anthropic contract boosts confidence in ERock’s ability to secure other major deals, according to Traders Union. The Anthropic deal is ERock’s third major data center contract, with separate Anthropic deals for operations and maintenance services expected to follow, Fowler said.

CEO John Carrington says Anthropic’s order “reinforces the momentum” ERock is witnessing across its customer base.

“We are seeing a lot of interest in Texas. It seems to be the easiest place to get a site set up,” company President Corey Amthor said

In its Q2 earnings release—its first as a public company—ERock also reported:

  • Launching generator-assembly operations at its Hyperion equipment factory in Northwest Houston. The plant will expand ERock’s assembly capabilities to 1.2 gigawatts of capacity by the end of 2026.
  • Starting construction of a $473 million, 366-megawatt El Paso Electric natural-gas-powered plant to supply power for Meta Platforms’ $14 billion, 1,000-acre AI data center campus in El Paso. Meta is the parent company of the Facebook and Instagram social media companies.

“Meta gains access to an operational data center years earlier than may otherwise be possible, while El Paso Electric gains a flexible, low-cost, low-emissions grid asset that can support long-term system reliability,” Carrington said.

Nominate energy trailblazers for Houston Innovation Awards by Aug. 27

Awards Season

Calling all energy innovators: The 2026 Houston Innovation Awards, presented by InnovationMap, return this fall to celebrate the best and brightest in the Houston innovation ecosystem, and that includes those leading the energy transition.

We're asking you to nominate Houston's top innovators and startups for this year's awards.

Nominations are open now through August 27 and can be made on behalf of yourself, your organization, and other influential leaders in the local innovation scene.

The annual awards program recognizes the most innovative individuals and companies in Houston across 10 prestigious categories, including one category specifically for the energy transition.

This year's awards will honor the following categories:

  • Minority-founded Business, honoring an innovative startup founded or co-founded by BIPOC or LGBTQ+ representation.
  • Female-founded Business, honoring an innovative startup founded or co-founded by a woman.
  • Energy Transition Business, honoring an innovative startup providing a solution within renewables, climatetech, clean energy, alternative materials, circular economy, and beyond.
  • Health Tech Business, honoring an innovative startup within the health and medical technology sectors.
  • Deep Tech Business, honoring an innovative startup providing technology solutions based on substantial scientific or engineering challenges, including those in the AI, robotics, and space sectors.
  • Startup of the Year (People's Choice), honoring a startup celebrating a recent milestone or success. The winner will be selected by the community via an interactive voting experience.
  • Scaleup of the Year, honoring an innovative later-stage startup that's recently reached a significant milestone in company growth.
  • Incubator/Accelerator of the Year, honoring a local incubator or accelerator that is championing and fueling the growth of Houston startups.
  • Mentor of the Year, honoring an individual who dedicates their time and expertise to guide and support budding entrepreneurs.
  • Trailblazer, honoring an innovator who's made a lasting impact on the Houston innovation community.

You have three weeks to submit nominees, so don't delay — nominate today at this link or fill out the form below. Qualified nominees will receive a formal application to complete, which will be reviewed by our esteemed panel of judges to determine the finalists and winners.

More announcements about the 2026 Houston Innovation Awards are coming soon. Interested in sponsoring the 2026 Houston Innovation Awards? Please contact sales@innovationmap.com.