Chevron plans to launch its first AI data center power project in West Texas in 2027. Photo via Chevron.com

Two of the Houston area’s oil and gas goliaths, Chevron and ExxonMobil, are duking it out in the emerging market for natural gas-powered data centers—centers that would ease the burden on electric grids.

Chevron said it’s negotiating with an unnamed company to supply natural gas-generated power for the data center industry, whose energy consumption is soaring mostly due to AI. The power would come from a 2.5-gigawatt plant that Chevron plans to build in West Texas. The company says the plant could eventually accommodate 5 gigawatts of power generation.

The Chevron plant is expected to come online in 2027. A final decision on investing in the plant will be made next year, Jeff Gustavson, vice president of Chevron’s low-carbon energy business, said at a recent gathering for investors.

“Demand for gas is expected to grow even faster than for oil, including the critical role gas will play [in] providing the energy backbone for data centers and advanced computing,” Gustavson said.

In January, the company’s Chevron USA subsidiary unveiled a partnership with investment firm Engine No. 1 and energy equipment manufacturer GE Vernova to develop large-scale natural gas power plants co-located with data centers.

The plants will feature behind-the-meter energy generation and storage systems on the customer side of the electricity meter, meaning they supply power directly to a customer without being connected to an electric grid. The venture is expected to start delivering power by the end of 2027.

Chevron rival ExxonMobil is focusing on data centers in a slightly different way.

ExxonMobil Chairman and CEO Darren Woods said the company aims to enable the capture of more than 90 percent of emissions from data centers. The company would achieve this by building natural gas plants that incorporate carbon capture and storage technology. These plants would “bring a unique advantage” to the power market for data centers, Woods said.

“In the near to medium term, we are probably the only realistic game in town to accomplish that,” he said during ExxonMobil’s third-quarter earnings call. “I think we can do it pretty effectively.”

Woods said ExxonMobil is in advanced talks with hyperscalers, or large-scale providers of cloud computing services, to equip their data centers with low-carbon energy.

“We will see what gets translated into actual contracts and then into construction,” he said.

A new joint venture will work on four projects supplying 5 gigawatts of power from combined-cycle power plants for the ERCOT and PJM Interconnection grids. Photo via Getty Images.

NRG Energy forms joint venture to build power plants for ERCOT and AI-driven demand

teaming up

Houston-based power provider NRG Energy Inc. has formed a joint venture with two other companies to meet escalating demand for electricity to fuel the rise of data centers and the evolution of generative AI.

NRG’s partners in the joint venture are GE Vernova, a provider of renewable energy equipment and services, and TIC – The Industrial Co., a subsidiary of construction and engineering company Kiewit.

“The growing demand for electricity in part due to GenAI and the buildup of data centers means we need to form new, innovative partnerships to quickly increase America’s dispatchable generation,” Robert Gaudette, head of NRG Business and Wholesale Operations, said in a news release. “Working together, these three industry leaders are committed to executing with speed and excellence to meet our customers’ generation needs.”

Initially, the joint venture will work on four projects supplying 5 gigawatts of power from combined-cycle power plants, which uses a combination of natural gas and steam turbines that produce additional electricity from natural gas waste. Electricity from these projects will be produced for power grids operated by the Electric Reliability Council of Texas (ERCOT) and PJM Interconnection. The projects are scheduled to come online from 2029 through 2032.

The joint venture says the model it’s developing for these four projects is “replicable and scalable,” with the potential for expansion across the U.S.

The company is also developing a new 721-megawatt natural gas combined-cycle unit at its Cedar Bayou plant in Baytown, Texas. Read more here.

Ad Placement 300x100
Ad Placement 300x600

CultureMap Emails are Awesome

4 Houston researchers awarded projects in DOE's Genesis Mission

federal funding

The U.S. Department of Energy has named the nearly 300 projects selected under the Trump Administration's Genesis Mission, which aims to address some of the largest science and technology challenges in the country. The group features four projects from Houston universities and companies.

The initiative aims to unite government, industry, academia and philanthropy to lead to breakthroughs in energy, scientific discovery and national security, according to a release.

The selected projects feature 87 led by DOE and National Nuclear Security Administration (NNSA) National Laboratories, 168 led by universities, 19 led by companies and 4 led by nonprofit organizations—totalling 342 participating institutions.

“America has no shortage of bold ideas or talented scientists, and the response to the Genesis Mission proves that,” U.S. Secretary of Energy Chris Wright said in a news release. “The 278 projects selected today represent the very best of our nation’s scientific enterprise. The remarkable number of high-quality proposals we received demonstrates that America’s innovation pipeline is strong, and it points to even greater opportunities for future investment and continued expansion of the Genesis Mission portfolio.”

Twelve Texas-based projects were selected among the 278. The Houston projects and their researchers include:

Caroline Ajo-Franklin

Ajo-Franklin recieved a Phase I grant for her project "Predictive AI to Map Point Mutation Effects on Protein Function: Measurement and Biosynthesis of Isoprenoids." Ajo-Franklin is a professor of biosciences at Rice University, a CPRIT Scholar in Cancer Research and member of the Rice Synthetic Biology Institute. The project aims to accelerate the engineering of microbes that can produce isoprenoids, which are natural compounds that could replace petroleum-derived fuels, solvents and materials.

“This project creates a continuous feedback loop in which AI guides experiments and each experiment generates more detailed data to better hone the AI model,” Ajo-Franklin said in a news release. “In addition, it demonstrates the extraordinary star power Rice has recruited in protein engineering and synthetic biology.”

Anastasios Kyrillidis

Kyrillidis recived a Phase I grant for his project "Cracking the VQA Optimization Bottleneck: AI Methods for Quantum Chemistry and Materials." Kyrillidis is the Noah Harding Associate Professor of Computer Science at Rice and a member of the Ken Kennedy Institute. The project aims to develop AI tools to resolve bottlenecks in quantum computing for chemistry and materials research.

“Our goal is to replace fragile, hand-tuned optimization methods with intelligent systems that can learn from quantum computations while still operating within frameworks that provide strong mathematical guarantees,” Kyrillidis added in the release.

Myoungkyu Lee

Lee received a nearly $750,000 Phase I grant for his project "Physics-Informed AI Surrogates for Turbulent Forced Convection in Energy System." Lee is an assistant professor of mechanical aerospace engineering at the University of Houston. Lee will collaborate with researchers from Lawrence Livermore National Laboratory and University of Pennsylvania on the project and develop artificial intelligence to accelerate the design of materials for advanced nuclear fission and fusion reactors.

“The goal is to develop a tool that runs much faster than today’s most detailed simulations while keeping errors small,” Lee said in a news release. “If successful, the approach could support better heat-transfer predictions for molten-salt reactor design and provide a starting point for studying heat removal in fusion blankets. This is one contribution among many toward reliable, carbon-free energy.”

Amit Padhi

Padhi recieved a grant for his project "Probabilistic Inference of Subsurface Fracture Connectivity for Stimulation Control with Physics-Informed AI." Padhi is a scientific advisor for Halliburton.

The DOE first called for applications for the Genesis Mission in March. At the time, the DOE shared that it would grant approximately $293 million to the selected teams via Phase I awards, ranging from $500,000 to $750,000 for nine-month project periods, and Phase II awards, for $6 million to $15 million over a three-year project period.

Since then, however, the initiative has grown with 15 federal agencies now granting research awards and funding opportunities under the Genesis umbrella. The White House announced this week that it had secured more than $5 billion in federal commitments to expand the initiative.

SLB teams with Liberty Energy on modular power for AI data centers

ai alliance

Houston-headquartered SLB and Denver-based Liberty Energy Inc. announced a strategic agreement this month to support the rapid growth of new data center capacity.

Under the agreement, SLB will supply modular data center infrastructure and oversee large-scale execution, while Liberty will provide modular power generation systems and behind-the-meter power management technology for developers looking to add capacity. According to Reuters, the power will come from natural gas generation.

“The bottleneck in AI infrastructure is no longer just compute. It is the ability to deliver infrastructure and power on the timelines the market now demands,” Gavin Rennick, president of SLB’s New Energy and Industrial business, said in a news release. “By bringing together complementary infrastructure and power capabilities, we will help developers accelerate deployment of new data center capacity.”

The companies seek to specifically offer the modular technologies in areas without traditional grid connections or where grid capacity is limited.

They also aim to improve the "efficiency, flexibility and environmental performance of future data center energy systems," potentially through solutions like hybrid power systems and digital energy management, according to the news release.

Goldman Sachs estimates that U.S. data center capacity will more than double from 31 gigawatts in 2025 to 66 gigawatts in 2027. Other reports predict that Houston and Texas will be home to a significant portion of the data center boom, with capacity in the city and the state also expected to double in the next few years.

“The scale and complexity of AI energy infrastructure is fundamentally changing how power systems are built and deployed,” Ron Gusek, CEO of Liberty Energy, added in the release. “Liberty’s comprehensive power service platform is engineered to meet this transition, as customers increasingly prioritize tailored, integrated solutions. Building on our long-standing relationship with SLB, we are excited to bring power solutions that address immediate capacity constraints while supporting the next generation of energy systems.”

SLB sold its onshore hydraulic fracturing business in the United States and Canada to Liberty Energy in December 2020 in exchange for a 37 percent equity interest in the company.

New Rice study details how carbon capture could reduce AI data center emissions

by the numbers

A new study out of Rice University points to carbon capture and storage methods as pivotal solutions to addressing emissions from AI-driven data centers.

The study was authored by Hon Chung Lau, an adjunct professor in the Department of Chemical and Biomolecular Engineering at Rice University and founder of Low Carbon Energies LLC, and Steve C. Tsai, an energy transition consultant at Low Carbon Energies LLC, and published in the journal Energy & Fuels.

According to the study, U.S. data center power capacity could more than quadruple in five years, growing from 40 gigawatts in 2025 to 169 gigawatts by 2030. Without proper regulation of emissions, the report estimates that carbon dioxide produced by fossil-fuel power plants supplying electricity to data centers could grow at the same scale, increasing from 90 million metric tons to more than 404 million metric tons over the same time period.

The researchers analyzed publicly available data on announced U.S. data centers, which included energy sources, locations, and projected power capacity before estimating data center-related carbon emissions based on each state’s electricity mix. From there, they examined whether those emissions could be captured and stored underground in saline aquifers.

The team estimates that 34 states have enough saline aquifer storage capacity to store more than 100 years of projected data center-related carbon dioxide emissions beyond 2030. Aquifers could store an estimated 59 million metric tons of data center-related carbon dioxide, or about 66 percent of the sector’s emissions in 2025. However, that calculation could grow to 299 million metric tons, or about 74 percent of projected data center-related emissions by 2030.

The researchers found that more than 90 percent of data center-related carbon dioxide emissions could potentially be mitigated through carbon capture and storage when out-of-state storage options are included, even though they note that carbon capture isn’t the only solution.

“It does show that the geology exists to make a meaningful impact, especially in states where data center growth is strongest,” Lau said in a news release.

Rapid growth in states including Texas, Virginia, Pennsylvania, Ohio, Arizona, Colorado, Utah and Illinois was considered in the study. According to the findings, Texas would need to add 25 gigawatts of power capacity by 2030 to meet projected data center demand, as data centers require reliable electricity 24/7.

“Data centers are becoming one of the defining energy challenges of the AI era,” Lau added in the news release. “The question is not only whether we can build enough computing infrastructure, but whether we can power it in a way that is reliable, affordable and compatible with decarbonization goals.”