A team of Texas researchers has landed a nearly $1 million NSF grant to address rural flood management challenges with community input. Photo via Getty Images.

A team from Rice University, the University of Texas at Austin and Texas A&M University have been awarded a National Science Foundation grant under the CHIRRP—or Confronting Hazards, Impacts and Risks for a Resilient Planet—program to combat flooding hazards in rural Texas.

The grant totals just under $1 million, according to a CHIRRP abstract.

The team is led by Avantika Gori, assistant professor of civil and environmental engineering at Rice. Other members include Rice’s James Doss-Gollin, Andrew Juan at Texas A&M University and Keri Stephens at UT Austin.

Researchers from Rice’s Severe Storm Prediction, Education and Evacuation from Disasters Center and Ken Kennedy Institute, Texas A&M’s Institute for A Disaster Resilient Texas and the Technology & Information Policy Institute at UT Austin are part of the team as well.

Their proposal includes work that introduces a “stakeholder-centered framework” to help address rural flood management challenges with community input.

“Our goal is to create a flood management approach that truly serves rural communities — one that’s driven by science but centers around the people who are impacted the most,” Gori said in a news release.

The project plans to introduce a performance-based system dynamics framework that integrates hydroclimate variability, hydrology, machine learning, community knowledge, and feedback to give researchers a better understanding of flood risks in rural areas.

The research will be implemented in two rural Texas areas that struggle with constant challenges associated with flooding. The case studies aim to demonstrate how linking global and regional hydroclimate variability with local hazard dynamics can work toward solutions.

“By integrating understanding of the weather dynamics that cause extreme floods, physics-based models of flooding and AI or machine learning tools together with an understanding of each community’s needs and vulnerabilities, we can better predict how different interventions will reduce a community’s risk,” Doss-Gollin said in a news release.

At the same time, the project aims to help communities gain a better understanding of climate science in their terms. The framework will also consider “resilience indicators,” such as business continuity, transportation access and other features that the team says more adequately address the needs of rural communities.

“This work is about more than flood science — it’s also about identifying ways to help communities understand flooding using words that reflect their values and priorities,” said Stephens. “We’re creating tools that empower communities to not only recover from disasters but to thrive long term.”

While our grid may be showing its age, this is the perfect time to shift from reacting to problems to getting ahead of them.

Reshaping the Texas grid: The impact of EVs, AI, renewables, and extreme weather

guest column

Did you catch those images of idle generators that CenterPoint had on standby during Hurricane Beryl? With over 2 million people in the Houston area left in the dark, many were wondering, "if the generators are ready, why didn’t they get used?" It seems like power outages are becoming just as common as the severe storms themselves.

But as Ken Medlock, Senior Director of the Baker Institute Center for Energy Studies (CES) explains, it's not a simple fix. The outages during Hurricane Beryl were different from what we saw during Winter Storm Uri. This time, with so many poles and wires down, those generators couldn’t be put to use. It’s a reminder that each storm brings its own set of challenges, and there’s no one-size-fits-all solution when it comes to keeping the lights on. While extreme weather is one of the leading threats to our electric grid, it's certainly not the only one adding strain on our power infrastructure.

The rapid rise of artificial intelligence (AI) and electric vehicles (EVs) is transforming the way we live, work, and move. Beneath the surface of these technological marvels lies a challenge that could define the future of our energy infrastructure: they all depend on our electrical grid. As AI-powered data centers and a growing fleet of EVs demand more power than ever before, our grid—already under pressure from extreme weather events and an increasing reliance on renewable energy—faces a critical test. The question goes beyond whether our grid can keep up, but rather focuses on how we can ensure it evolves to support the innovations of tomorrow without compromising reliability today. The intersection of these emerging technologies with our aging energy infrastructure poses a dilemma that policymakers, industry leaders, and consumers must address.

Julie Cohn, Nonresident Fellow at the Center for Energy Studies at the Baker Institute for Public Policy, presents several key findings and recommendations to address concerns about the reliability of the Texas energy grid in her Energy Insight. She suggests there’s at least six developments unfolding that will affect the reliability of the Texas Interconnected System, operated by the Electric Reliability Council of Texas (ERCOT) and the regional distribution networks operated by regulated utilities.

Let’s dig deeper into some of these issues:

AI

AI requires substantial computational power, particularly in data centers that house servers processing vast amounts of data. These data centers consume large amounts of electricity, putting additional strain on the grid.

According to McKinsey & Company, a single hyperscale data center can consume as much electricity as 80,000 homes combined. In 2022, data centers consumed about 200 terawatt-hours (TWh), close to 4 percent, of the total electricity used in the United States and approximately 460 TWh globally. That’s nearly the consumption of the entire State of Texas, which consumed approximately 475.4 TWh of electricity in the same year. However, this percentage is expected to increase significantly as demand for data processing and storage continues to grow. In 2026, data centers are expected to account for 6 percent, almost 260 TWh, of total electricity demand in the U.S.

EVs

According to the Texas Department of Motor Vehicles, approximately 170,000 EVs have been registered across the state of Texas as of 2023, with Texas receiving $408 million in funding to expand its EV charging network. As Cohn suggests, a central question remains: Where will these emerging economic drivers for Texas, such as EVs and AI, obtain their electric power?

EVs draw power from the grid every time they’re plugged in to charge. This may come as a shock to some, but “the thing that’s recharging EV batteries in ERCOT right now, is natural gas,” says Medlock. And as McKinsey & Company explains, the impact of switching to EVs on reducing greenhouse gas (GHG) emissions will largely depend on how much GHG is produced by the electricity used to charge them. This adds a layer of complexity as regulators look to decarbonize the power sector.

Depending on the charger, a single EV fast charger can pull anywhere from 50 kW to 350 kW of electricity per hour. Now, factor in the constant energy drain from data centers, our growing population using power for homes and businesses, and then account for the sudden impact of severe environmental events—which have increased in frequency and intensity—and it’s clear: Houston… we have a problem.

The Weather Wildcard

Texas is gearing up for its 2025 legislative session on January 14. The state's electricity grid once again stands at the forefront of political discussions. The question is not just whether our power will stay on during the next winter storm or scorching summer heatwave, but whether our approach to grid management is sustainable in the face of mounting challenges. The events of recent years, from Winter Storm Uri to unprecedented heatwaves, have exposed significant vulnerabilities in the Texas electricity grid, and while legislative measures have been taken, they have been largely patchwork solutions.

Winter Storm Uri in 2021 was a wake-up call, but it wasn’t the first or last extreme weather event to test the Texas grid. With deep freezes, scorching summers, and unpredictable storms becoming the norm rather than the exception, it is clear that the grid’s current state is not capable of withstanding these extremes. The measures passed in 2021 and 2023 were steps in the right direction, but they were reactive, not proactive. They focused on strengthening the grid against cold weather, yet extreme heat, a more consistent challenge in Texas, remains a less-addressed threat. The upcoming legislative session must prioritize comprehensive climate resilience strategies that go beyond cold weather prep.

“The planners for the Texas grid have important questions to address regarding anticipated weather extremes: Will there be enough energy? Will power be available when and where it is needed? Is the state prepared for extreme weather events? Are regional distribution utilities prepared for extreme weather events? Texas is not alone in facing these challenges as other states have likewise experienced extremely hot and dry summers, wildfires, polar vortexes, and other weather conditions that have tested their regional power systems,” writes Cohn.

Renewable Energy and Transmission

Texas leads the nation in wind and solar capacity (Map: Energy, Environment, and Policy in the US), however the complexity lies in getting that energy from where it’s produced to where it’s needed. Transmission lines are feeling the pressure, and the grid is struggling to keep pace with the rapid expansion of renewables. In 2005, the Competitive Renewable Energy Zones (CREZ) initiative showed that state intervention could significantly accelerate grid expansion. With renewables continuing to grow, the big question now is whether the state will step up again, or risk allowing progress to stall due to the inadequacy of the infrastructure in place. The legislature has a choice to make: take the lead in this energy transition or face the consequences of not keeping up with the pace of change.

Conclusion

The electrical grid continues to face serious challenges, especially as demand is expected to rise. There is hope, however, as regulators are fully aware of the strain. While our grid may be showing its age, this is the perfect time to shift from reacting to problems to getting ahead of them.

As Cohn puts it, “In the end, successful resolution of the various issues will carry significant benefits for existing Texas industrial, commercial, and residential consumers and have implications for the longer-term economic attractiveness of Texas. Suffice it to say, eyes will be, and should be, on the Texas legislature in the coming session.”

------------

Scott Nyquist is a senior advisor at McKinsey & Company and vice chairman, Houston Energy Transition Initiative of the Greater Houston Partnership. The views expressed herein are Nyquist's own and not those of McKinsey & Company or of the Greater Houston Partnership. This article originally ran on LinkedIn on September 11, 2024.

Two Houston communities have received funding for programming and workforce development within climate resilience. Photo via Getty Images

Houston Health Department scores $20M grant funding for climate, energy resilience

H-town strong

The city of Houston has secured a $20 million grant from the Environmental Protection Agency to be used to build climate and energy resilience in two local underserved communities.

The Houston Health Department's funding comes from the EPA's Community Change program and will benefit the Greater Fifth Ward and Kashmere Gardens, regions that have faced contamination from the neighboring Union Pacific Railroad site. This grant follows two prior EPA grants from the Vulnerable to Vibrant series that were awarded in 2023.

"Through this grant, we will also aim to enhance a state-of-the-art flood alert system that provides advance warning," Loren Hopkins, HHD's chief environmental science officer, says in a news release. "We will promote and provide education regarding an air permit application warning system, plant fruit trees for flood, heat, and pollution mitigation, develop a hyper-local neighborhood resilience plan, and establish a Houston Environmental Justice Advisory Committee."

The initial $1 million grant will span three years and includes several local partners: HHD, Black United Fund of Texas, Houston Community College, My Brother's Keeper - Houston, City of Houston Solid Waste Management Department, and Environmental Defense Fund. It will fund the creation of free solar workforce development program with the hopes of installing and operating a community solar farm.

A second $500,000 grant will find paid internships to residents for solar deployment in the community and will be led by HHD in partnership with BUFTX, University of Houston Center for Sustainability and Resilience, Air Alliance, Houston Wilderness, and Rice University SSPEED Center/Fang Research Group.

The ultimate goal of these freshly funded initiatives, according to the city, is to strengthen HHD and its partners' efforts in establishing a solar energy system for the community in order to advance the neighborhood’s resilience.

Ad Placement 300x100
Ad Placement 300x600

CultureMap Emails are Awesome

Harris County officials seek more local control over data centers

data demands

Three Harris County officials are pushing for greater local control over the development and operation of data centers.

County Attorney Abby Kamin, County Commissioner Lesley Briones and County Commissioner Adrian Garcia recently called for action to give Harris County more power to regulate data centers.

As it stands now, Harris County “has little to no authority” over the construction of data centers, Briones said at a news conference. Harris County has 55 operating, under-construction, or planned data centers, according to a document filed with the county.

Briones outlined four steps being included in the Harris County commissioners’ exploration of potentially tighter local regulation of data centers:

  • Reviewing what Harris County can and cannot do regarding data centers
  • Creating a Harris County plan for the upcoming state legislative session aimed at granting more local control over data center construction and operations. State lawmakers would need to approve any changes in local control.
  • Establishing community “listening” sessions in Harris County about data centers
  • Notifying Harris County commissioners when a proposed data center seeks permits

Kamin noted Houston and Harris County lack zoning regulations, and the county’s 34 cities set their own zoning rules. Furthermore, she said, Texas Attorney General Ken Paxton has not issued a ruling on whether counties can impose a moratorium on development of data centers.

However, she said, “limited jurisdiction does not mean limited responsibility … New technology is arriving in our communities faster than our laws and institutions can keep up with, whether that’s data centers, AI or even drones.”

The effort by Kamin, Briones, and Garcia follows Gov. Greg Abbott’s recent statewide halt of new environmental and construction permits for data centers. State permitting is frozen until the Electric Reliability Council of Texas (ERCOT) and the Public Utility Commission of Texas complete their review of data centers.

Their initiative also comes amid growing public concern over the amount of electricity and water gobbled up by data centers, as well as residents’ own rising electric and water bills.

Houston-based CenterPoint Energy expects to connect 8 gigawatts of new data-center loads in the Houston area by 2029, with about 4 gigawatts to follow, Kamin said. That, she said, would significantly increase peak power demand.

“No industry should get to monopolize or run roughshod over residents, public safety, and our critical natural resources,” Kamin said.

That being said, Kamin and Briones stressed they take pride in Houston being the Energy Capital of the World and Texas being an economic powerhouse.

“This isn’t about being against technology or new technology, but growth has to go hand in hand with accountability,” Kamin said.

Garcia said he’s open to welcoming data centers as good corporate neighbors, but not without protecting the people who live near these projects.

“I’ll keep an open mind,” he said, “but I want to know what will ultimately be the benefit to the community. And right now, I need tools [to do that].”

Houston bio-based materials co. steps into new sustainable consumer products

a cleaner shoe

A more sustainable shoe can’t be built on a single material swap. From the hard plastics hidden inside a heel to the material covering a sneaker’s upper, footwear is a collection of components—and each presents a different challenge for companies trying to move away from conventional, petroleum-based materials.

Houston-based Rheom Materials wants to change that equation. The biomaterials company has launched a sustainable footwear platform featuring two of its bio-based alternatives: Benree, a biodegradable plastic designed for hard internal components, and ShoraiDura, a durable leather alternative for footwear uppers.

“A shoe is not one material; it is multiple parts working together as a system. Substituting a single material has never moved the needle,” Rheom founder and CEO Zimri Hinshaw said in a news release. “Rheom wants to make it easier for brands to make a positive impact. By providing an assortment of bio-based materials, brands can change the system, not just a swatch of it.”

Benree is Rheom’s alternative to conventional hard plastics used in footwear construction. The company says it is a 100 percent USDA-certified bio-based, biodegradable material with performance comparable to acrylonitrile butadiene styrene (ABS), a widely used engineering plastic.

The material has passed SATRA testing for high-heel applications with Bared Footwear, an Australian footwear brand.

“At Bared, we're constantly on a journey to remove plastic from our shoes. At the same time, our brand won't compromise on quality for the end customer,” Millie Richards, Bared’s head of sustainability, added in the release. “From samples and testing, Rheom has proven to be solving both of those problems for us. We look forward to seeing how they develop as a company and would love to use them in our shoes.”

Rheom says it is also exploring Benree for additional internal components, including toe puffs and heel counters.

Rheom's Benree material was used for a high-heel prototype. Photo courtesy Rheom Materials

The company’s ShoraiDura material addresses another major part of shoe construction: the upper, which must withstand repeated flexing, friction and wear while maintaining its appearance.

Containing about 80 percent bio-based content, ShoraiDura is engineered as a durable leather alternative for footwear. Rheom says the material’s molecular structure is designed to deliver the strength and durability required for demanding applications.

To demonstrate how the material could be used in finished products, Rheom worked with a Los Angeles-based footwear manufacturer to create two prototypes: an athletic sneaker and a textured skater shoe, both featuring ShoraiDura uppers.

The two offerings reflect the company’s broader strategy. Rather than asking brands to evaluate a single material in isolation, Rheom is positioning its platform as a way to explore alternatives across different parts of footwear construction.

The next step is broader industry adoption. Benree’s testing with Bared Footwear and ShoraiDura’s footwear prototypes offer early examples of how the materials could be applied, while commercial use will depend on manufacturers’ evaluations and product-development decisions.

Rheom Materials is a Houston-based biomaterials company developing bio-based alternatives to petrochemical plastics. Its product portfolio includes Shorai, a leather alternative, and Benree, a hard plastic alternative.

The company debuted Shorai at the Houston Livestock Show and Rodeo in 2025 and showed a bio-based "leather" collection in Milan earlier this year. Read more here.

---

This article originally appeared on our sister site, InnovationMap.

Houston solar manufacturer expands facility, production capacity

houston expansion

Solar tracking and manufacturing company PV Hardware USA is increasing its production capacity and expanding its Houston facility in an effort to meet growing demands.

The move marks the company's third expansion in the Houston area in three years. PV Hardware reports a 400 percent surge in national market growth over the past three years, as solar-based projects have been pivotal in energy resilience efforts.

PV Hardware plans to increase the capacity at its Houston facility by 42 percent, according to a news release. With the additional capacity, PV Hardware expects a 35 percent increase in production of pre-assembled parts. The company has not announced whether any additional employees will be hired or the costs of expansion.

In September, the company completed its new dedicated pre-assembly facility, which will help migrate difficult assembly into an easier manufacturing setting. The new pre-assembly area will also assist with streamlined field installation, enhanced schedule predictability and reduction of manual labor.

Citybiz reports that the expansion totals approximately 34,200 square feet.

PV Hardware USA aims to make solar installation more efficient. For large-scale solar projects, PV Hardware USA’s pre-assembly process helps to relieve assembly work done by installation teams. According to PV Hardware USA, it reduces the number of on-site components by 70 percent.

“Traditionally, manufacturers pushed the assembly burden onto the jobsite,” Rodolfo Bitar, vice president of business development for PVH USA, told Renewable Energy Magazine. “We ask a different question: what work can be done more efficiently before the equipment ever leaves the factory? By managing the assembly of 188 loose parts per row in our controlled manufacturing environment, we remove field complexity and make installation highly predictable.”

PV Hardware USA produces single-axis solar trackers made in Texas and has supplied over 52 gigawatts of solar trackers worldwide.

“The expanded presence in Texas underscores a long-term commitment: bringing world-class solar expertise to local American manufacturing, supporting communities, and serving as a reliable partner through the clean energy transition,” the company said in the release.

In July of 2025, the company opened its 95,000-square-foot facility, which was the second Houston location following its initial $30 million U.S. manufacturing facility, which, at 50,000 square feet, is one of America's largest solar tracker manufacturing facilities.