Greelane Infrastructure plans to develop a high-power charging site for commercial trucks in the Houston area. Image via drivegreenlane.com

Greenlane Infrastructure, an electric public charging station developer and operator, is expanding outside of its home state of California and into Texas.

The Santa Monica-based company plans to launch its high-power charging sites along the Dallas–Houston I-45 corridor, which is one of the highest-volume commercial trucking routes in the country, according to a news release from Greenlane.

The sites will feature 6-8 pull-through lanes with chargers supporting combined charging system (CCS) and megawatt charging system (MCS) connectors that allow electric truck drivers to recharge their vehicles during standard rest periods. They will also offer tractor parking and charging, as well as operations that will allow for overnight stops.

Drivers can reserve chargers in advance, monitor charging activity in real time, and manage billing from the Greenlane Edge platform.

“Our customers are making commitments to electrify their fleets, and they need a charging network that can grow alongside them,” Patrick Macdonald-King, CEO of Greenlane, said in the release. “This is the first leg of the Texas triangle, one of the more important freight arteries in the country, so bringing high-power charging there is the next logical step in building a network that serves how freight moves across America.”

Greenlane is also expanding across the West Coast, with five locations under development in California and Nevada. It opened its flagship Greenlane Center in Colton, California, in April 2025. The company plans to open locations in Blythe, California, and Port of Long Beach this year.

Greelane was founded in 2023 as a joint venture between Daimler Truck North America, NextEra Energy Resources and BlackRock. It has secured partnerships with electric long-haul truck developer Windrose Technology, Velocity Truck Centers and Volvo Trucks North America.

A new report shows that Texas has about 16 public charging stations per 1,000 EVs. Photo by Kindel Media/Pexels

Texas among top states for EV charging access, report shows

by the numbers

A new study from FinanceBuzz reports that Texas has the fifth most public electric vehicle charging stations among states in the U.S.

In its Electric Vehicle (EV) Statistics [2025]: Trends in Sales, Savings, and More report, FinanceBuzz, a personal finance and investment adviser, compiled electric vehicle data to find sales trends, adoption rates, charging infrastructure, costs, savings and more.

Texas has a total of 3,709 public EV charging stations, which equals about 16 stations per 1,000 EVs, according to the report. The remaining top five included:

  • No. 1 California with 17,122 EV charging stations
  • No. 2 New York with 4,814 EV charging stations
  • No.3 Massachusetts with 3,738 EV charging stations
  • No. 4 Florida with 3,715 EV charging stations

Los Angeles had the most public charging stations at 1,609 among U.S. cities. Austin was Texas’s top city with 656 stations.

The study also looked at how much Americans are spending on transportation, and found that the average American using a gas vehicle spends $1,865 annually on fuel. FinanceBuzz found that electric vehicle owners would pay 65 percent less on energy costs. Calculations were based on driving 14,489 miles annually, which measures to 37.9 miles per day. The full report sourced data from the International Energy Agency, the U.S. Department of Energy, the U.S. Department of Transportation, AAA, the U.S. Energy Information Administration and other organizations.

The report said Americans purchased over 1.5 million EVs in 2024, which equals approximately 10 percent of all new light-duty vehicles sold, citing information from the International Council on Clean Transportation.

While Tesla remains the most popular make, 24 new EV models were launched in 2024 by other companies, which represents a 15 percent increase from the previous year.

Other trends in the report included:

  • The U.S. now has more than 64,000 public charging stations and over 168,000 charging ports, which is up from fewer than 1,000 stations in 2010.
  • An average EV owner will spend about $654 per year on electricity, compared to $1,865 for a gas-powered vehicle. The savings equate to about $1,211 per year.
  • In 2024, U.S. EV sales surpassed 1.5 million, but the pace slowed compared to the previous year, with a 10 percent increase versus 40 percent in 2023.
  • Insuring an EV can be more costly because parts are harder to come by, making repairs and replacements more expensive.
  • In the second quarter of 2024, nearly half of new EVs were leased, which is a 28 percentage point increase since 2021.
Ad Placement 300x100
Ad Placement 300x600

CultureMap Emails are Awesome

Chevron, Rice name latest cohort of energy transition fellows

energy fellowship

Chevron and Rice University have named 10 graduate students to the third cohort of the Chevron Energy Graduate Fellowship.

The recipients were announced at a reception at Rice University’s Sustainability Institute earlier this month. Their research and projects stem from a variety of fields, ranging from engineering to history and chemistry, and address larger efforts to help solve sustainability issues throughout the world. Fellows each receive a $10,000 award to support their research along with the opportunity to connect with industry experts. This year the fellowship will also connect recipients with subject matter experts from Chevron.

Vesna Mirkovic, strategic relationships manager at Innovation Chevron Technology Ventures, sees the fellowship as an opportunity for Rice graduate students and Chevron to learn from each other and seek the answers to tough questions.

“When academic and industry perspectives meet early on, the path from the lab to real-world applications becomes much easier,” Mirkovic said in a new release. “We see this fellowship as more than an award. It is a chance to learn from each other and ask difficult questions.”

Rice’s latest fellows and their fields include:

  • Abdullah Alqallaf, chemical and biomolecular engineering
  • Bohan Zhang, history
  • Emilia Mann, mechanical engineering
  • Fiona Chen, chemical and biomolecular engineering
  • Fu Yin, Earth, environmental and planetary sciences
  • Hossein Gazmeh, civil and environmental engineering
  • Monisha Vijay Kumar, applied physics
  • Rosie Zhu, Earth, environmental and planetary sciences
  • Yingxin Tang, civil and environmental engineering
  • Zikai Qian, chemical and biomolecular engineering

“This exciting partnership between the Sustainability Institute and Chevron represents our shared commitment to advancing scalable innovations in energy that lead to emissions reductions across energy value chains,” Rice President Reginald DesRoches added in the release. “This year’s fellows are tackling critical energy challenges, focusing on creating real-world solutions that can transform how we live, how we work and how we interact with our environment.”

For example, Gazmeh’s work addresses the global issue of logistics surrounding electronic vehicle charging stations and its infrastructures. Graduate student Vijay Kumar is developing carbon nanotube fiber devices for electrified gas heating applications. And Qian has developed a new way to extend the lifespan of membranes used to extract lithium from brine.

The Chevron Fellows program launched at Rice in 2024, naming 10 graduate students to the inaugural cohort. It is funded by Chevron and was created through a partnership with the Rice Sustainability Institute. Chevron launched a similar program at the University of Houston in 2023.

Read more about the most recent cohort here.

Fervo Energy adds transmission capacity at Cape Station geothermal project

geothermal expansion

Houston-based geothermal power company Fervo Energy has expanded its deal with Longroad Energy for transmission of electricity generated by Fervo’s Utah project.

Fervo added 105 megawatts to its existing 400-megawatt transmission deal with Longroad Energy, a Boston company that develops solar, wind and battery storage projects. The updated agreement will enable Fervo to deliver 505 megawatts of power from its marquee Cape Station geothermal project in Beaver County, Utah.

Dawn Owens, senior vice president of commercial markets at Fervo, said in a release that the new agreement brings another “105 megawatts of long-term, reliable capacity to the grid.”

Subject to regulatory approvals, the new agreement is expected to take effect in 2028.

“Longroad has worked alongside Fervo since its first efforts in Beaver County, and we’re excited to collaborate again,” Charles Spiliotis, chief development officer at Longroad, added in the release. “Providing transmission service for this next phase helps deliver clean, around-the-clock power to the grid.”

Cape Station recently began delivering carbon-free power. Capacity is on track to reach 100 megawatts in early 2027. The project’s second phase is targeted for completion in 2028. It will add 400 megawatts of capacity and is currently under construction.

Cape Station is adjacent to the U.S. Department of Energy’s Frontier Observatory for Research in Geothermal Energy and near the Blundell geothermal power plant.

Earlier this month, Tim Latimer, Fervo’s co-founder, chair, president and CEO, told Wall Street analysts the company had a $11.9 billion backlog of orders in the third quarter, up from $7.2 billion in the previous quarter.

Fervo signed the largest purchase agreement in its history in September with Google. The tech giant agreed to purchase 396 megawatts of geothermal power from Fervo with an option for Google to expand capacity to 1 gigawatt by June 2030. Financial terms weren’t disclosed.

Regulators OK Dow’s Gulf Coast nuclear reactor project

going nuclear

The federal government has given preliminary approval for construction of four nuclear reactors at a Dow site on the Texas Gulf Coast.

The U.S. Nuclear Regulatory Commission (NRC) recently signed off on a permit for Dow and Maryland-based nuclear reactor developer X-energy to build Long Mott Generating Station at Dow’s Seadrift complex. The complex is near Port Lavaca and about 140 miles southwest of Houston.

The NRC issued the permit but hasn’t yet authorized construction to start. The commission said it’s the first construction permit issued for a high-temperature gas-cooled nuclear reactor in nearly 60 years.

Edward Stones, vice president of Dow’s energy and climate business, said the permit approval represents “another important milestone” for Long Mott. It’s expected to be the first-ever advanced nuclear project at a North American industrial site.

Construction at Long Mott could begin before 2030.

Dow’s Seadrift complex manufactures chemicals and plastics. The roughly 4,700-acre site employs more than 1,200 people. Union Carbide, a Dow subsidiary, operates the parent company’s second-largest facility in Texas.

Long Mott will supply zero-carbon electricity and high-temperature steam at Seadrift, replacing current energy- and steam-generating methods. Dow and X-energy are developing the project with support from the U.S. Department of Energy’s Advanced Reactor Demonstration Program.

Mike Goff, principal deputy assistant secretary for nuclear energy, said the NRC’s approval “demonstrates meaningful progress toward deploying advanced reactors that can deliver reliable power and industrial heat, strengthen American energy leadership and expand the role of nuclear energy in meeting our nation’s growing energy demands.”

Plans call for four small X-energy modular reactors to operate at Long Mott. Each reactor would be capable of producing 80 megawatts of electricity or 200 megawatts of thermal energy. Initial delivery of energy could happen as soon as the early 2030s.

“Advanced nuclear has attractive advantages over other sources of clean power, including a compact footprint, competitive cost, and enhanced power and steam reliability,” said Jim Fitterling, executive chair of Dow.