Ten climatetech startups were named most-promising at this annual Rice Alliance Energy Tech Venture Forum. Photo courtesy Rice Alliance.

Investors at the Rice Alliance Energy Tech Venture Forum have named the 10 most-promising startups among the group of 100 clean tech companies participating in the event.

The 22nd annual event was held yesterday, Sept. 18, at Rice University’s Jones Graduate School of Business and was part of the second Houston Energy and Climate Startup Week.

The most-promising startups will receive $7,000 in in-kind legal services from Baker Botts.

The 10 most-promising companies included:

  • Houston-based Xplorobot, which has developed laser gas imaging technology for the first handheld methane detection device approved by the EPA as an alternative test method
  • Seattle-based Badwater Alchemy, a desalination company that uses nano materials to purify saline water at a fraction of the cost of traditional methods
  • San Francisco-based Ammobia, which is developing a clean ammonia production process
  • Illinois-based Celadyne Technologies, which is building hydrogen for industrial decarbonization with durable and efficient fuel cells and electrolyzers
  • Massachusetts-based MacroCycle Technologies, which converts plastic waste in the form of bottles, food trays and polyester textiles into virgin-grade mPET resin
  • Massachusetts-based AtoMe, which uses nano-ceramics to develop ultra-durable metals for 3D printing
  • Colorado-based Advanced Thermovoltaic Systems (ATS) Energy, a renewable energy semiconductor manufacturing company
  • North Carolina-based Lukera Energy, which is converting waste methane into high-value fuel
  • Midland, Texas-based AI Driller, a company that uses AI and machine learning to enable remote operations and provide historical drilling data for survey management, anti-collision monitoring and iob reporting
  • New York-based Fast Metals Inc., which has developed a chemical process to extract valuable metals from complex toxic mine tailings that is capable of producing iron, aluminum, scandium, titanium and other rare earth elements using industrial waste and waste CO2 as inputs

Arculus Solutions won the People's Choice Award. The New Jersey-based company retrofits natural gas pipelines for safe hydrogen transportation. It also won Track A: Hydrogen, Fuel Cells, Buildings, Water, & Other Energy Solutions at the Energy Venture Day and Pitch Competition during CERAWeek earlier this year.

The 100 energy technology ventures selected to participate in the forum were named earlier this year. See the full list here.

Ad Placement 300x100
Ad Placement 300x600

CultureMap Emails are Awesome

ERCOT braces for record-breaking power demand this summer

hot temps, high demand

The Electric Reliability Council of Texas, which manages about 90 percent of the state’s power, is waving a warning flag: The ERCOT grid may set a new record for peak demand this summer.

Based on expectations for a hotter summer this year than last year, ERCOT predicts power demand will hit a peak of more than 92.2 gigawatts this summer — enough power for roughly 18.4 million homes.

“Given the potential for extreme heat combined with significant load growth, ERCOT may surpass its current all-time summer peak,” the organization says in its 2026 summertime forecast.

Further taxing the ERCOT grid are power-hungry data centers and cryptocurrency-mining facilities.

Last year’s peak summer demand for ERCOT reached 83.7 megawatts on Aug. 18, and all-time peak demand of 85.5 gigawatts was recorded on Aug. 10, 2023.

Fortunately, ERCOT believes the grid is in good shape to withstand this summer’s heat: It found a 0.09 percent chance of a grid emergency in June and a 0.21 percent chance in July.

More generation of electricity from solar and wind is helping ERCOT meet stepped-up demand prompted by population growth, and the significant power needs of data centers and cryptocurrency-mining facilities.

About 27 million Texas customers depend on power from ERCOT’s grid.

Texas awards $73M for Houston-area grid resilience project

grid funding

Texas Gov. Gregg Abbott announced millions in funding for energy resilience projects around this state this week, with one major project set to impact the greater Houston area.

As part of the Texas Energy Fund's Outside of ERCOT Grant Program, the state announced a roughly $73 million agreement with the Sam Houston Electric Cooperative to replace and upgrade more than 9,000 electric poles and improve other equipment in Montgomery, Liberty and Hardin counties. The agreement is the first for the fund's Outside of ERCOT Grant Program, which supports state projects outside of the state's largest grid.

The multibillion-dollar Texas Energy Fund aims to "finance the construction, maintenance, and modernization of electric facilities across Texas." It was approved by voters in 2023. Other programs within the fund include the:

  • In-ERCOT Generation Loan Program
  • Completion Bonus Grant Program
  • Texas Backup Power Package Program

“The Texas Energy Fund delivers real results for Texans and strengthens the electric systems that families, businesses, and communities depend on,” Abbott said in a news release. “This grant to Sam Houston Electric Cooperative will replace thousands of vulnerable utility poles to better withstand severe weather and ensure a more reliable and resilient grid in East Texas.”

The Houston-area project, nicknamed Steel Anchor, is expected to be completed by June 2031. According to the release from the governor's office, the Sam Houston Electric Cooperative’s territory is one of the most hurricane-prone service areas in the state. The cooperative serves more than 38,000 Texas consumers

“Over the past decade, Sam Houston EC has strategically replaced poles to improve the strength of its electricity distribution system. This grant will boost the Cooperative’s ongoing grid-hardening and resiliency program,” Doug Turk, CEO of the Sam Houston Electric Cooperative, added in the release.

Following the announcement of the Sam Houston funding, Abbott's office also awarded another $200 million from the Outside of ERCOT Grant Program to upgrade approximately 700 miles of power equipment in Northeast Texas. The equipment is operated by Southwestern Electric Power Company, which serves more than 192,000 Texas consumers. The project will include improvements to 200 circuits, replacing aging copper wire with aluminum alloy conductors and replacing existing utility poles.

Additionally, the state announced its seventh Texas Energy Fund loan agreement for a 570 megawatt natural gas power plant in Sherman, Texas. The 20-year loan of up to $411 million is between the Public Utility Commission of Texas and Rayburn Electric Cooperative and is part of the fund's In-ERCOT Generation Loan Program. Rayburn will build the facility near its existing Rayburn Energy Station 1 in the Texoma region. It will connect to the ERCOT North Load Zone.

“When Texas voters overwhelmingly approved the Texas Energy Fund, they gave us a mandate to secure new, reliable power generation for Texas,” PUCT Chairman Thomas Gleeson added in a release. “The TxEF is delivering on that promise, and Rayburn Electric Cooperative’s new 570 MW power plant is proof. We are ensuring Texas families and businesses have power they can depend on for years to come.”

Solar manufacturer announces massive new facility in Houston area

coming soon

SEG Solar has announced plans to open a new 1.15 million-square-foot solar module facility in Tomball—its third in the Houston area.

The news comes just weeks after the Houston-based solar manufacturer announced its second facility, which will be located in Cypress. It’s expected to open in August.

The latest 4.6-gigawatt facility in Tomball will include an assembly factory and a warehouse. Construction is slated to wrap in March 2027, with commercial panel production planned to begin in May 2027. Once completed, the facility will bring SEG’s annual U.S. module manufacturing capacity to 10.6 gigawatts, according to a news release from the company, one of the largest totals in the country.

The facility will produce heterojunction technology (HJT) modules, which the company says will add to the number of n-type solar panels made in the U.S. HJT modules are known to be more durable and are well suited for hotter climates.

“Designed to support next-generation HJT technology and FEOC-compliant production, the facility ensures reliable, high-efficiency solar solutions,” Raymond Bailey, sales manager at SEG Solar, said in a LinkedIn post. “ Alongside upstream integration in Indonesia and potential U.S. cell manufacturing, we are strengthening supply chain resilience amid evolving trade policies.”

SEG opened its $60 million, 250,000-square-foot facility in Houston in 2024 to house its production workshops, raw material warehouses, administrative offices, finished goods warehouses, and supporting infrastructure. The continued expansion is part of SEG’s long-term goal of becoming one of the largest 100 percent U.S.-owned module manufacturers.