The project will focus on testing 5G networks for "stability, interoperability, energy efficiency and communication performance." Photo via Getty Images

A team of Rice University engineers has secured a $1.9 million grant from the U.S. Department of Commerce’s National Telecommunications and Information Administration to develop a new way to test 5G networks.

The project will focus on testing 5G networks for software-centric architectures, according to a statement from Rice. The funds come from the NTIA's most recent round of grants, totaling about $80 million, as part of the $1.5 billion Public Wireless Supply Chain Innovation Fund. Other awards went to Virginia Tech, Northeastern University, DISH Wireless, and more.

The project at Rice will be led by Rahman Doost-Mohammady, an assistant research professor of electrical and computer engineering; and Ashutosh Sabharwal, the Ernest Dell Butcher Professor of Engineering and chair of the Department of Electrical and Computer Engineering. Santiago Segarra, assistant professor of electrical and computer engineering and an expert in machine learning for wireless network design, is also a co-principal investigator on this project.

"Current testing methodologies for wireless products have predominantly focused on the communication dimension, evaluating aspects such as load testing and channel emulation,” said Doost-Mohammady said in a statement. “But with the escalating trend toward software-based wireless products, it’s imperative that we take a more holistic approach to testing."

The new framework will be used to "assess the stability, interoperability, energy efficiency and communication performance of software-based machine learning-enabled 5G radio access networks (RANs)," according to Rice, known as ETHOS.

Once created, the team of researchers will use the framework for extensive testing using novel machine learning algorithms for 5G RAN with California-based NVIDIA's Aerial Research Cloud (ARC) platform. The team also plans to partner with other industry contacts in the future, according to Rice.

“The broader impacts of this project are far-reaching, with the potential to revolutionize software-based and machine learning-enabled wireless product testing by making it more comprehensive and responsive to the complexities of real-world network environments,” Sabharwal said in the statement. “By providing the industry with advanced tools to evaluate and ensure the stability, energy efficiency and throughput of their products, our research is poised to contribute to the successful deployment of 5G and beyond wireless networks.”

Late last year, the Houston location of Greentown Labs also landed funds from the Department of Commerce. The climatetech startup incubator was named to of the Economic Development Administration's 10th cohort of its Build to Scale program and will receive $400,000 with a $400,000 local match confirmed.

Houston-based nonprofit accelerator, BioWell, also received funding from the Build to Scale program.


———

This article originally ran on InnovationMap.

Ad Placement 300x100
Ad Placement 300x600

CultureMap Emails are Awesome

Fervo Energy lands $200 million in capital for new geothermal project

fresh funding

Houston-based Fervo Energy, a producer of geothermal power, has secured $205.6 million in capital to help finance its geothermal project in southern Utah.

The money will go toward the first and second phases of Cape Station, a geothermal energy plant being developed in Beaver County, Utah. Beaver County is roughly an equal distance between Salt Lake City and Las Vegas.

The $205.6 million in capital came from three sources:

  • $100 million in equity from Breakthrough Energy Catalyst, a Kirkland, Washington-based platform that invests in emissions-reducing projects.
  • $60 million addition to Fervo’s existing loan from Mercuria, a Swiss energy and commodities trader. The revolving loan now totals $100 million.
  • $45.6 million in additional bridge debt financing from XRL-ALC, an affiliate of Irvington, New York-based X-Caliber Rural Capital. X-Caliber is a USDA-approved lender. The initial bridge loan was $100 million.

The first phase of Cape Station will supply 100 megawatts of carbon-free electricity to the power grid starting next year. Another 400 megawatts of capacity is supposed to go online by 2028. Fervo has permission to expand Cape Station’s capacity to as much as 2 gigawatts. On an annual basis, 2 gigawatts can supply enough electricity to power about 1.4 million homes.

“These investments demonstrate what we’ve known all along: Fervo’s combination of technical excellence, commercial readiness, and market opportunity makes us a natural partner for serious energy capital. The confidence our investors have in Fervo and in the Cape asset affirms that next-generation geothermal is ready to play a defining role in America’s energy future,” David Ulrey, Fervo’s CFO, said in a news release.

Syzygy unveils plans for groundbreaking sustainable aviation fuel facility

coming soon

Houston-based Syzygy Plasmonics announced plans to develop what it calls the world's first electrified facility to convert biogas into sustainable aviation fuel (SAF).

The facility, known as NovaSAF 1, will be located in Durazno, Uruguay. It is expected to produce over 350,000 gallons of SAF annually, which would be considered “a breakthrough in cost-effective, scalable clean fuel,” according to the company.

"This is more than just a SAF plant; it's a new model for biogas economics," Trevor Best, CEO of Syzygy Plasmonics, said in a news release. "We're unlocking a global asset class of underutilized biogas sites and turning them into high-value clean fuel hubs without pipelines, costly gas separation, or subsidy dependence.”

The project is backed by long-term feedstock and site agreements with one of Uruguay's largest dairy and agri-energy operations, Estancias del Lago, while the permitting and equipment sourcing are ongoing alongside front-end engineering work led by Kent.

Syzygy says the project will result in a 50 percent higher SAF yield than conventional thermal biogas reforming pathways and will utilize both methane and CO2 naturally found in biogas as feedstocks, eliminating the need for expensive CO2 separation technologies and infrastructure. Additionally, the modular facility will be designed for easy replication in biogas-rich regions.

The new facility is expected to begin commercial operations in Q1 2027 and produce SAF with at least an 80 percent reduction in carbon intensity compared to Jet A fuel. The company says that once fully commercialized the facility will produce SAF at Jet-A fuel cost parity.

“We believe NovaSAF represents one of the few viable pathways to producing SAF at jet parity and successfully decarbonizing air travel,” Best added in the release.