The Carbon to Value Initiative has named its fifth cohort of global startups. Photo courtesy of Greentown Labs

The Carbon to Value Initiative (C2V Initiative)—a collaboration between Greentown Labs, NYU Tandon School of Engineering's Urban Future Lab and Fraunhofer USA—has announced 10 startup participants to join the fifth cohort of its carbontech accelerator.

The six-month accelerator aims to help cleantech startups advance their commercialization efforts through access to the C2V Initiative’s Carbontech Leadership Council (CLC). The invitation-only council consists of corporate and nonprofit leaders from organizations like Shell, TotalEnergies, XPRIZE, L’Oréal and others who “foster commercialization opportunities and identify avenues for technology validation, testing, and demonstration,” according to a release from Greentown

“The No. 1 reason startups engage with Greentown is to find customers, grow their businesses, and accelerate impact—and the Carbon to Value Initiative delivers exactly that,” Georgina Campbell Flatter, CEO of Greentown, said in a news release. “It’s a powerful example of how meaningful engagement between entrepreneurs and industry turns innovation into commercial traction.”

The C2V Initiative received more than 100 applications from 33 countries, representing a variety of carbontech innovations. The 10 startups chosen for the 2025 fifth cohort include:

  • Cambridge, Massachusetts-based Sora Fuel, which integrates direct-air capture with direct conversion of the captured carbon into syngas for production of sustainable aviation fuel
  • Brooklyn-based Arbon, which develops a humidity-swing carbon-capture solution by capturing CO₂ from the air or point-source without heat or pressure
  • New York-based Cella Mineral Storage, which works to develop subsurface mineralization technology with integrated software, enabling new ways to sequester CO2 underground
  • Germany-based ICODOS, which helps transform emissions into value through a point-source carbon capture and methanol synthesis process in a single, modularized system
  • Vancouver-based Lite-1, which uses advanced biomanufacturing processes to produce circular colourants for use in textiles, cosmetics and food
  • London-based Mission Zero Technologies, which has developed and deployed an electrified, direct-air carbon capture solution that employs both liquid-adsorption and electrochemical technologies
  • Kenya-based Octavia Carbon, which develops a solid-adsorption-based, direct-air carbon capture solution that utilizes geothermal heat
  • California-based Rushnu, which combines point-source carbon capture with chemical production, turning salt and CO2 into chlorine-based chemicals and minerals
  • Brooklyn-based Turnover Labs, which develops modular electrolyzers that transform raw, industrial CO2 emissions into chemical building blocks, without capture or purification
  • Ontario-based Universal Matter, which develops a Flash Joule Heating process that converts carbon waste such as end-of-life plastics, tires or industrial waste into graphene

The C2V Initiative is based on Greentown Go, Greentown’s open-innovation program. The C2V Initiative has supported 35 startups that have raised over $600 million in follow-on funding.

Read about the 2024 cohort here.
Ad Placement 300x100
Ad Placement 300x600

CultureMap Emails are Awesome

Houston energy startup names former Cheniere execs to C-suite

new leaders

Houston-based energy infrastructure startup Joulent has brought aboard a new chief financial officer and new chief operating officer—both former executives at Houston-based Cheniere Energy.

The C-suite moves come three months after Joulent raised $1.75 billion from National Grid Ventures.

Michael Wortley joins Joulent as co-president and CFO. Wortley most recently was executive vice president and CFO at Cheniere, an LNG producer and exporter.

In conjunction with Wortley’s hiring, Brian Boland, who was Joulent’s interim CFO, has been named executive vice president, chief investment officer, and head of strategy.

Corey Grindal comes to Joulent as co-president and COO. Grindal most recently was executive vice president and COO at Cheniere.

“As Joulent evolves to meet the growing demand for power infrastructure, our expanded leadership team will help ensure we continue delivering the execution certainty our customers, partners, and investors expect,” Chris James, Joulent’s founder and CEO, said in a press release.

“Corey and Michael are accomplished operators with exceptional records of building and leading world-class energy infrastructure businesses, where they have embedded a culture defined by operational excellence and disciplined execution,” James added.

Joulet builds dedicated power-generating facilities that feed directly into data centers and other power-dependent facilities. This eliminates the need for companies to draw power from grids.

“With an initial multi-gigawatt development portfolio and strategic partnerships across the energy, infrastructure, and data center ecosystem, Joulent is helping remove power constraints to enable the next chapter of American innovation and U.S. reindustrialization,” the company says.

The $1.75 billion minority investment from National Grid Ventures complements Joulent’s existing partnerships.

Joulent, founded in 2023, emerged from stealth mode this summer. The company was founded by investment firm Engine No. 1.

Joulent’s first project, the Project Kilby natural gas facility in West Texas, will be co-located with a Microsoft data center. It’ll deliver about 2.67 gigawatts of power under a 20-year deal between Microsoft and Energy Forge One, a 50/50 joint venture between Chevron and Joulent.

Lithium refiner expands into Houston with new Energy Corridor office

new to hou

Battery-grade lithium carbonate manufacturer Stardust Power has expanded into Houston’s Energy Corridor, the company tells Energy Capital.

The company’s new office will serve as a project execution hub to support operations and planning for the company’s forthcoming lithium refinery in Muskogee, Oklahoma, according to a news release. The Greenwich, Connecticut-based, publicly traded company says the facility will be one of the largest lithium refining operations in the United States. The refinery is expected to have production capacity of up to 50,000 metric tons per year and seeks to address the critical shortage of U.S. lithium refining capacity.

Battery-grade lithium carbonate is commonly used in electric vehicle batteries and energy storage systems.

The company says it chose Houston as the location for its new execution hub for its rich history of expertise in engineering, a robust energy infrastructure ecosystem, and access to a leading talent pool for engineering, procurement and construction professionals. The Houston project hub will work closely with the company’s existing office in Oklahoma City.

“The Houston office strengthens our operational footprint at a critical phase of development,” Chris Celano, COO of Stardust Power, said in the release. “By building out a dedicated project management hub in one of the most experienced energy markets in the world, we are positioning the Company for execution as we advance the Muskogee refinery.”

Currently, the Houston office plans to accommodate a workforce of about 20 people with the possibility to add staff upon reaching project milestones, according to a representative from the company.

“This expansion reflects our commitment to deliver domestic, battery-grade lithium that supports U.S. energy security and industrial growth,” Celano added in the release.

In August, Stardust Power secured an offtake agreement to supply up to 20,000 metric tons of battery-grade lithium carbonate by 2030 from the Muskogee, Oklahoma, refinery to New York-based battery technology company Charge CCCV. Stardust reports that the deal adds to a separate non-binding agreement for up to 25,000 metric tons annually for 10 years with an undisclosed global trading company.

European cleantech company breaks ground on Houston manufacturing site

coming soon

Spanish renewable energy company Power Electronics broke ground on its new 53-acre Houston campus on Sept.24.

The new site is expected to create over 400 local jobs and deliver 40 gigawatts of production capacity per year. The company said in a news release that the campus is expected to be the largest manufacturing site for power conversion systems in the U.S. Power Electronics specializes in solar, energy storage, data centers and electrification technologies.

A completion date and operational start date have not yet been announced.

“For the first time in many years, the United States will be able to meet its growing need for sustainable power generation capacity and energy resilience through local manufacturing, supported by the most advanced technology in the world,” David Salvo, CEO of Power Electronics, said in the news release. “Our [40-gigawatt] Houston Campus will help shape the future of energy and AI growth globally."

Once operational, the manufacturing site will feature two buildings of approximately 150,000 square feet and 700,000 square feet. They will house production, logistics, R&D, corporate offices, training and electronic manufacturing departments.

The company says the Houston campus will be its most automated inverter production site by using advanced technologies in production to streamline day-to-day processes. Inverters convert direct current (DC) electricity that is generated by solar panels and batteries to alternating current (AC) electricity used by electrical grids.

Power Electronics' global headquarters is in Valencia, Spain, with U.S. operations in Houston, Tampa, and Gilbert, Arizona. Its North American headquarters is located at its existing North Houston office on East Airtex Drive. Community Impact News reports that the new manufacturing site is located in the Cy-Fair/Jersey Village area.

Power Electronics shared on LinkedIn that the new Houston campus represents its commitment to its American business and will allow it to serve the market with "greater scale, proximity and local expertise." It currently has more than 116 gigawatts installed in the U.S. and is working toward a global goal of 105 gigawatts of annual global production capacity.